← United States data centers · All sites · Texas
Sourced site record, every fact links to its page
Stargate - Milam Campus:data center in Burlington, Texas.
Stargate - Milam Campus is an under construction data center in Burlington, Texas, listed under SB Energy. Planned capacity is 1.2 GW according to Epoch AI Frontier Data Centers. 2024 to 2026 satellite: filling (+1 to +9 pts). Real Assets links 6 source pages, including Epoch AI Frontier Data Centers, sbenergy.com.
Open this site on the map View the full site recordunder construction data center · 6 linked sources
- SB Energy
- Burlington
- Texas
Approximate position and Texas peer sites (the exact position needs sign-in)
Facts on record
- OperatorSB Energy
- City and stateBurlington, Texas
- Statusunder construction
- Planned capacity1.2 GW, as stated by Epoch AI Frontier Data Centers
- Expected completion2026 (Phase 1 October target)
- 2024 vs 2026 satelliteRoofed share filling, (+1 to +9 pts, 2024 to 2026), 1 January 2024 to 27 October 2026
- Sources linked6 from 2 publishers
- Record updated20 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
- Sourced figures, each with its page and quote🔒 8 figures
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Texas has 245 data centers on record in Real Assets, with 5.19 GW reported as operating and 75.92 GW not yet operating. Stargate - Milam Campus is one of them.
SB Energy has 2 data centers on record in the United States: 0 operating and 2 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Epoch AI Frontier Data Centers Dossier: OpenAI Stargate Milam
Epoch AI Frontier Data Centers, docs.google.com, published 19 October 2026Web page - OpenAI and SoftBank Group Partner with SB Energy
sbenergy.com, published 19 October 2026Web page - 4 additional source filings & extracted fact citations for Stargate - Milam Campus
Full source ledger and verbatim fact quotes in workspace🔒 Source ledger
6 sources on record; 2 shown above and 4 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.
The full site record
Open Stargate - Milam Campus's record: 6 source pages and 8 sourced figures - enter work email
Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.
2024 vs 2026 satellite construction check
Comparing clear 10 m satellite passes across 2024 to 2026 (1 January 2024 to 27 October 2026), Stargate - Milam Campus shows active roof growth (filling) with a roofed-share shift of +1 to +9 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Open 2024 vs 2026 satellite slider · All United States 2024 vs 2026 satellite-tracked sites
SB Energy data centers in other states
- PORTS Technology Campus
Piketon, Ohio, planned10 GW
Other data centers in Texas
- Project Matador
Panhandle, Texas, under construction17 GW - GridFree AI South Dallas One
Dallas, Texas, planned5 GW - Sailfish Comanche Circle
Tolar, Texas, planned5 GW - Prometheus Pecos Project
Pecos, Texas, planned2.5 GW - Amp Energy East Texas
Lufkin, Texas, planned2.1 GW - IREN Sweetwater Mega-Hub (Sweetwater 1 & 2)
Sweetwater, Texas, under construction2 GW
Full site dossier & United States dataset
Open Stargate - Milam Campus and 1,276 other data centers
This page is the public summary for Stargate - Milam Campus in Burlington, Texas. Sign in to see its full record: 6 source pages and 8 sourced figures.
- Stargate - Milam Campus on the interactive map, with the sites around it
- All 6 linked source pages
- 8 sourced figures, each with its page and quote
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Stargate - Milam Campus?
Stargate - Milam Campus is recorded under SB Energy. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Stargate - Milam Campus?
In Burlington, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Stargate - Milam Campus have?
1.2 GW, as stated by Epoch AI Frontier Data Centers. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Is Stargate - Milam Campus under construction or growing on satellite imagery?
Comparing clear 10 m satellite passes across 2024 to 2026 (1 January 2024 to 27 October 2026), Stargate - Milam Campus shows active roof growth (filling) with a roofed-share shift of +1 to +9 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Where does this information come from?
From 6 linked pages by Epoch AI Frontier Data Centers, sbenergy.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.