AnalystAIReal Assets Start free trial

← United States data centers · All sites

Sourced site record, every fact links to its page

Stargate Project Jupiter:data center in Santa Teresa, New Mexico.

Stargate Project Jupiter is an under construction data center in Santa Teresa, New Mexico, listed under Oracle. Planned capacity is 2.45 GW according to Epoch AI Frontier Data Centers. Real Assets links 12 source pages, including Epoch AI Frontier Data Centers, Drive Official Source, Projectjupitertogether Official Source.

Open this site on the map Start a 7-day trial
2.45 GWplanned capacity
Under constructionstatus
12source pages linked
2026 (Phase 1 operations)expected completion

Facts on record

  • OperatorOracle
  • City and stateSanta Teresa, New Mexico
  • Statusunder construction
  • Planned capacity2.45 GW, as stated by Epoch AI Frontier Data Centers
  • Operating capacity today0 MW
  • Land area566.6 hectares (about 1,400 acres)
  • Building floor areaNot recorded
  • Expected completion2026 (Phase 1 operations)
  • Sources linked12 from 8 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 2 data centers in New Mexico that have a page.

Oracle has 1 data center in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

12 sources on record; the 8 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.

Other data centers in New Mexico

Full market dataset & site-level records

Open Stargate Project Jupiter and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Stargate Project Jupiter on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Stargate Project Jupiter?

Stargate Project Jupiter is recorded under Oracle. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Stargate Project Jupiter?

In Santa Teresa, New Mexico. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Stargate Project Jupiter have?

2.45 GW, as stated by Epoch AI Frontier Data Centers. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today: 0 MW.

Where does this information come from?

From 12 linked pages by Epoch AI Frontier Data Centers, Drive Official Source, Projectjupitertogether Official Source, Oracle Corporate Communications. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.