← Europe data centers · All sites
2024 vs 2026 satellite construction tracker
Europe data centers:2024 vs 2026 satellite buildout.
2024 to 2026 satellite roof-growth tracking across 102 Europe data centers: 1 filling, 39 little change. Every row links to the facility's public record and original sources; the interactive 2024 vs 2026 curtain slider opens inside the workspace.
Operators: 2024 vs 2026 buildout
- atNorth
0 filling (0%) · 3 little change7 tracked - Microsoft
0 filling (0%) · 4 little change6 tracked - CyrusOne
0 filling (0%) · 0 little change5 tracked - DATA4
0 filling (0%) · 2 little change5 tracked - Digital Realty
0 filling (0%) · 0 little change5 tracked - CloudHQ
0 filling (0%) · 3 little change4 tracked - Colt Data Centre Services
0 filling (0%) · 2 little change4 tracked - maincubes
0 filling (0%) · 2 little change4 tracked - Vantage Data Centers
0 filling (0%) · 2 little change4 tracked - Ark Data Centres
0 filling (0%) · 0 little change3 tracked - EcoDataCenter
0 filling (0%) · 1 little change3 tracked - Green Mountain
0 filling (0%) · 0 little change3 tracked - NTT Global Data Centers
0 filling (0%) · 0 little change3 tracked - VIRTUS Data Centres
0 filling (0%) · 3 little change3 tracked - ClusterPower
0 filling (0%) · 2 little change2 tracked - Google
0 filling (0%) · 1 little change2 tracked - KAO Data
0 filling (0%) · 1 little change2 tracked - STACK Infrastructure
0 filling (0%) · 0 little change2 tracked
| # | Operator | Tracked | Filling | Little change | Pipeline filling | Pipeline little change | Filings |
|---|---|---|---|---|---|---|---|
| 1 | atNorth | 7 | 0 (0%) | 3 | not reported | 720 MW | 1 filing |
| 2 | Microsoft | 6 | 0 (0%) | 4 | not reported | not reported | 6 filings |
| 3 | CyrusOne | 5 | 0 (0%) | 0 | not reported | not reported | 1 filing |
| 4 | DATA4 | 5 | 0 (0%) | 2 | not reported | 350 MW | 1 filing |
| 5 | Digital Realty | 5 | 0 (0%) | 0 | not reported | not reported | 6 filings |
| 6 | CloudHQ | 4 | 0 (0%) | 3 | not reported | 431 MW | 1 filing |
| 7 | Colt Data Centre Services | 4 | 0 (0%) | 2 | not reported | 25 MW | 1 filing |
| 8 | maincubes | 4 | 0 (0%) | 2 | not reported | 42 MW | 1 filing |
| 9 | Vantage Data Centers | 4 | 0 (0%) | 2 | not reported | 520 MW | 1 filing |
| 10 | Ark Data Centres | 3 | 0 (0%) | 0 | not reported | not reported | 1 filing |
| 11 | EcoDataCenter | 3 | 0 (0%) | 1 | not reported | 240 MW | 1 filing |
| 12 | Green Mountain | 3 | 0 (0%) | 0 | not reported | not reported | 1 filing |
| 13 | NTT Global Data Centers | 3 | 0 (0%) | 0 | not reported | not reported | 2 filings |
| 14 | VIRTUS Data Centres | 3 | 0 (0%) | 3 | not reported | 267 MW | 1 filing |
| 15 | ClusterPower | 2 | 0 (0%) | 2 | not reported | 812 MW | private / none |
| 16 | 2 | 0 (0%) | 1 | not reported | not reported | 6 filings | |
| 17 | KAO Data | 2 | 0 (0%) | 1 | not reported | 18 MW | 1 filing |
| 18 | STACK Infrastructure | 2 | 0 (0%) | 0 | not reported | not reported | 1 filing |
Includes operators with at least 2 satellite-tracked sites. Pipeline columns count planned and under-construction sites only, never operating capacity.
Countries: 2024 vs 2026 buildout
- Portugal
1 filling (50%) · 1 little change2 tracked - United Kingdom
0 filling (0%) · 7 little change21 tracked - Germany
0 filling (0%) · 7 little change18 tracked - Finland
0 filling (0%) · 4 little change11 tracked - France
0 filling (0%) · 2 little change9 tracked - Spain
0 filling (0%) · 5 little change8 tracked - Italy
0 filling (0%) · 4 little change5 tracked - Sweden
0 filling (0%) · 1 little change5 tracked - Norway
0 filling (0%) · 0 little change4 tracked - Greece
0 filling (0%) · 0 little change3 tracked - Netherlands
0 filling (0%) · 2 little change3 tracked - Poland
0 filling (0%) · 1 little change3 tracked - Belgium
0 filling (0%) · 1 little change2 tracked - Denmark
0 filling (0%) · 1 little change2 tracked - Romania
0 filling (0%) · 2 little change2 tracked
| # | Country | Tracked | Filling | Little change | Pipeline filling | Pipeline little change |
|---|---|---|---|---|---|---|
| 1 | Portugal | 2 | 1 (50%) | 1 | 180 MW | 21 MW |
| 2 | United Kingdom | 21 | 0 (0%) | 7 | not reported | 2.1 GW |
| 3 | Germany | 18 | 0 (0%) | 7 | not reported | 424 MW |
| 4 | Finland | 11 | 0 (0%) | 4 | not reported | 670 MW |
| 5 | France | 9 | 0 (0%) | 2 | not reported | 650 MW |
| 6 | Spain | 8 | 0 (0%) | 5 | not reported | 325 MW |
| 7 | Italy | 5 | 0 (0%) | 4 | not reported | 1.1 GW |
| 8 | Sweden | 5 | 0 (0%) | 1 | not reported | 240 MW |
| 9 | Norway | 4 | 0 (0%) | 0 | not reported | not reported |
| 10 | Greece | 3 | 0 (0%) | 0 | not reported | not reported |
| 11 | Netherlands | 3 | 0 (0%) | 2 | not reported | 600 MW |
| 12 | Poland | 3 | 0 (0%) | 1 | not reported | 3.2 GW |
| 13 | Belgium | 2 | 0 (0%) | 1 | not reported | 23 MW |
| 14 | Denmark | 2 | 0 (0%) | 1 | not reported | 250 MW |
| 15 | Romania | 2 | 0 (0%) | 2 | not reported | 812 MW |
Includes countries with at least 2 satellite-tracked sites.
Europe data centers with 2024 vs 2026 satellite passes
| # | Site | Operator | Location | Status | 2024 vs 2026 roof change |
|---|---|---|---|---|---|
| 1 | Merlin Edged Lisbon Data Center | Edged Energy | Vila Franca de Xira, Portugal | Under construction | Filling (+11 to +19 pts) |
| 2 | Apto mega-campus | Apto | Lacchiarella, Italy | Planned | Little change (-2 to +6 pts) |
| 3 | Virtus Stockley Park Campus (LONDON5-8) | VIRTUS Data Centres | London, United Kingdom | Operating | Little change (-2 to +6 pts) |
| 4 | Microsoft Aragon Villamayor de Gállego Campus | Microsoft | Villamayor de Gállego, Spain | Under construction | Little change (-2 to +6 pts) |
| 5 | ClusterPower Mischii (MSC1) | ClusterPower | Mischii, Romania | Under construction | Little change (-3 to +5 pts) |
| 6 | Khazna-Eni AI Data Center Campus (Ferrera Erbognone) | Khazna Data Centers | Ferrera Erbognone, Italy | Planned | Little change (-3 to +5 pts) |
| 7 | Vantage Bordeaux Campus | Vantage Data Centers | Gauriaguet, France | Planned | Little change (-3 to +5 pts) |
| 8 | CloudHQ MXP Campus | CloudHQ | Milan, Italy | Planned | Little change (-3 to +5 pts) |
| 9 | Krolmap La Legua Data Center Campus - Belchite | Krolmap | Belchite, Spain | Planned | Little change (-3 to +5 pts) |
| 10 | DATA4 Milan Vittuone Campus | DATA4 | Vittuone, Italy | Under construction | Little change (-3 to +5 pts) |
| 11 | Maincubes Frankfurt FRA02 | maincubes | Schwalbach am Taunus, Germany | Under construction | Little change (-3 to +5 pts) |
| 12 | Chapelcross | CX Tech | Chapelcross in southern Scotland, United Kingdom | Planned | Little change (-4 to +4 pts) |
| 13 | London Data Freeport | Digital Reef | East Havering (London), United Kingdom | Planned | Little change (-4 to +4 pts) |
| 14 | VOLT Rotterdam AI Gigafactory | VOLT | Rotterdam, Netherlands | Planned | Little change (-4 to +4 pts) |
| 15 | atNorth FIN04 Kouvola | atNorth | Kouvola, Finland | Under construction | Little change (-4 to +4 pts) |
| 16 | ClusterPower Fauresti (FRS1) | ClusterPower | Făurești, Romania | Planned | Little change (-4 to +4 pts) |
| 17 | atNorth DEN02 Varde | atNorth | Varde, Denmark | Planned | Little change (-4 to +4 pts) |
| 18 | Equinix Hertfordshire Campus (DC01UK) | Equinix | South Mimms, United Kingdom | Planned | Little change (-4 to +4 pts) |
| 19 | CloudHQ LHR Campus (Didcot) | CloudHQ | Didcot, United Kingdom | Planned | Little change (-4 to +4 pts) |
| 20 | LCL expansions | LCL Data Centers | Aalst & Diegem, Belgium | Planned | Little change (-4 to +4 pts) |
| 21 | Colt Berlin 1 | Colt Data Centre Services | Großbeeren, Germany | Planned | Little change (-4 to +4 pts) |
| 22 | Microsoft Aragon La Muela Campus (Centrovía) | Microsoft | La Muela, Spain | Planned | Little change (-4 to +4 pts) |
| 23 | Microsoft Aragon Puerto Venecia Campus | Microsoft | Zaragoza, Spain | Planned | Little change (-4 to +4 pts) |
| 24 | Baltic Data Center Campus | WBS Power | Choczewo, Poland | Planned | Little change (-5 to +3 pts) |
| 25 | DATA4 Paris Nozay Campus | DATA4 | Nozay, France | Under construction | Little change (-5 to +3 pts) |
| 26 | EcoDataCenter, Borlänge | EcoDataCenter | Borlänge, Sweden | Planned | Little change (-5 to +3 pts) |
| 27 | CloudHQ Frankfurt Campus (Offenbach) | CloudHQ | Offenbach, Germany | Under construction | Little change (-5 to +3 pts) |
| 28 | VIRTUS Marienpark Campus (Berlin) | VIRTUS Data Centres | Berlin, Germany | Planned | Little change (-5 to +3 pts) |
| 29 | Maincubes Frankfurt FRA03 | maincubes | Schwalbach am Taunus, Germany | Under construction | Little change (-5 to +3 pts) |
| 30 | Colt Frankfurt West | Colt Data Centre Services | Frankfurt, Germany | Under construction | Little change (-5 to +3 pts) |
| 31 | Google Grange Castle Phase 3 Expansion | Dublin, Ireland | Planned | Little change (-5 to +3 pts) | |
| 32 | Virtus Berlin Wustermark Campus | VIRTUS Data Centres | Wustermark, Germany | Under construction | Little change (-6 to +2 pts) |
| 33 | Vantage campus | Vantage Data Centers | St Athan, Wales, United Kingdom | Planned | Little change (-6 to +2 pts) |
| 34 | AtlasEdge Lisbon Campus | AtlasEdge | Carnaxide, Portugal | Planned | Little change (-6 to +2 pts) |
| 35 | Kao Data Klon-03 | KAO Data | Harlow, United Kingdom | Under construction | Little change (-6 to +2 pts) |
| 36 | Hyperco Kouvola Campus | Hyperco | Kouvola, Finland | Under construction | Little change (-6 to +2 pts) |
| 37 | Sesterce Jämsä AI campus (Kaipola) | Sesterce | Jämsä, Finland | Planned | Little change (-7 to +1 pts) |
| 38 | Nabiax Alcala Data Center 3 ADC3 | Nabiax | Alcalá de Henares, Spain | Under construction | Little change (-7 to +1 pts) |
| 39 | FIN02 | atNorth | Espoo, Finland | Planned | Little change (-7 to +1 pts) |
| 40 | Microsoft AMS13/14 Middenmeer | Microsoft | Middenmeer, Netherlands | Under construction | Little change (-7 to +1 pts) |
| 41 | Blackstone / QTS Blyth AI Hyperscale Campus | QTS Data Centers | Blyth, United Kingdom | Planned | Dated passes |
| 42 | DataOne Grenoble Presqu'île & Eybens AI Megacampus | DataOne | Grenoble, France | Under construction | Dated passes |
| 43 | Polarnode Lappeenranta Campus | Polarnode | Lappeenranta, Finland | Planned | Dated passes |
| 44 | atNorth SWE04 Solleftea | atNorth | Solleftea, Sweden | Planned | Dated passes |
| 45 | FIN05 | atNorth | Salo in southwest Finland, Finland | Planned | Dated passes |
| 46 | Shelborn Asset Management Edinburgh Campus | Shelborn Asset Management | Edinburgh, United Kingdom | Planned | Dated passes |
| 47 | Ada Infrastructure London Docklands | Ada Infrastructure | London, United Kingdom | Under construction | Dated passes |
| 48 | DATA4 Frankfurt Hanau Campus | DATA4 | Hanau, Germany | Planned | Dated passes |
| 49 | Compute Nordic Mikkeli AI Campus | Compute Nordic | Mikkeli, Finland | Under construction | Dated passes |
| 50 | CloudHQ CDG campus (CDG1/2) | CloudHQ | Lisses, France | Planned | Dated passes |
| 51 | EcoDataCenter Ostersund | EcoDataCenter | Ostersund, Sweden | Under construction | Dated passes |
| 52 | Madrid Sur | Echelon Data Centres | Madrid, Spain | Planned | Dated passes |
| 53 | CyrusOne LON6 | CyrusOne | Iver Heath, United Kingdom | Planned | Dated passes |
| 54 | Beyond.pl Poznan Data Center Campus | Beyond.pl | Poznań, Poland | Operating | Dated passes |
| 55 | Yondr Slough Hyperscale Campus (100MW) | Yondr Group | Slough, United Kingdom | Under construction | Dated passes |
| 56 | Ark Union Park | Ark Data Centres | London, United Kingdom | Under construction | Dated passes |
| 57 | DATA4 Athens Paiania Campus | DATA4 | Paiania, Greece | Planned | Dated passes |
| 58 | Green Mountain OSL-Hamar | Green Mountain | Hamar, Norway | Operating | Dated passes |
| 59 | Green Mountain DC2-Telemark (Rjukan) | Green Mountain | Rjukan, Norway | Operating | Dated passes |
| 60 | CyrusOne FRA6 | CyrusOne | Frankfurt, Germany | Under construction | Dated passes |
| 61 | Global Switch Paris Campus | Global Switch | Clichy, France | Operating | Dated passes |
| 62 | EcoDataCenter Falun (Wood-Engineered Campus) | EcoDataCenter | Falun, Sweden | Operating | Dated passes |
| 63 | Lefdal Mine Datacenter | Lefdal Mine Datacenter | Maloy, Norway | Operating | Dated passes |
| 64 | Green Mountain OSL1 Enebakk | Green Mountain | Enebakk, Norway | Operating | Dated passes |
| 65 | Nebius Mäntsälä AI Data Center Campus | Nebius | Mäntsälä, Finland | Operating | Dated passes |
| 66 | Goodman PAR01 Data Center (Tremblay-en-France) | Goodman Group | Tremblay-en-France, France | Under construction | Dated passes |
| 67 | NTT Frankfurt 1 | NTT Global Data Centers | Frankfurt, Germany | Operating | Dated passes |
| 68 | Verne Global, Mäntsälä | Verne Global | Mäntsälä, Finland | Under construction | Dated passes |
| 69 | NTT London 1 (Dagenham) | NTT Global Data Centers | London, United Kingdom | Operating | Dated passes |
| 70 | Vantage MXP1 Campus (Milan) | Vantage Data Centers | Milan, Italy | Operating | Dated passes |
| 71 | NTT Frankfurt 3 | NTT Global Data Centers | Ruesselsheim, Germany | Operating | Dated passes |
| 72 | Ark Spring Park Campus | Ark Data Centres | Corsham, United Kingdom | Operating | Dated passes |
| 73 | CyrusOne AMS1 / AMS2 Amsterdam | CyrusOne | Amsterdam, Netherlands | Operating | Dated passes |
| 74 | CyrusOne FRA5 Hanau Campus | CyrusOne | Hanau, Germany | Under construction | Dated passes |
| 75 | Ark Cody Park Campus | Ark Data Centres | Farnborough, United Kingdom | Operating | Dated passes |
| 76 | Nscale Loughton London AI Data Center Campus | Nscale | Loughton, United Kingdom | Planned | Dated passes |
| 77 | Colt Paris 2 | Colt Data Centre Services | Villebon-sur-Yvette, France | Under construction | Dated passes |
| 78 | CyrusOne FRA7 Campus | CyrusOne | Frankfurt, Germany | Under construction | Dated passes |
| 79 | Kao Data Manchester | KAO Data | Manchester, United Kingdom | Planned | Dated passes |
| 80 | Maincubes FRA04 | maincubes | Dietzenbach, Germany | Planned | Dated passes |
| 81 | Thésée expansion (Vesper) | Thésée DataCenter | Aubergenville, France | Planned | Dated passes |
| 82 | Colt London 4 | Colt Data Centre Services | Hayes, United Kingdom | Under construction | Dated passes |
| 83 | atNorth 30 MW Site (Sweden) | atNorth | Stockholm, Sweden | Planned | Dated passes |
| 84 | Ronesans Holding Ankara’s data center complex - Ankara | Ronesans Holding | Ankara, Turkey | Planned | Dated passes |
| 85 | atNorth 15 MW Campus (Finland) | atNorth | Espoo, Finland | Under construction | Dated passes |
| 86 | Dansk Data Center 1 (DDC1) Esbjerg | Thylander | Esbjerg, Denmark | Under construction | Dated passes |
| 87 | Applied Digital Finland AI Factory Campus | Applied Digital | Helsinki, Finland | Planned | Dated passes |
| 88 | Atman Data Center Warsaw-3 (WAW-3) | Atman | Duchnice, Poland | Under construction | Dated passes |
| 89 | DATA4 Madrid San Agustin Campus | DATA4 | San Agustín del Guadalix, Spain | Under construction | Dated passes |
| 90 | Digital Realty ATH5 | Digital Realty | Athens, Greece | Planned | Dated passes |
| 91 | Digital Realty data center campus - Marseille | Digital Realty | Marseille, France | Planned | Dated passes |
| 92 | Digital Realty FRA14 | Digital Realty | Hanau, Germany | Under construction | Dated passes |
| 93 | Digital Realty FRA20 | Digital Realty | Frankfurt, Germany | Planned | Dated passes |
| 94 | Digital Realty Paukerwerkstrasse Campus | Digital Realty | Vienna, Austria | Planned | Dated passes |
| 95 | Elsham Tech Park | Greystoke Land | North Lincolnshire, United Kingdom | Planned | Dated passes |
| 96 | Google Farciennes Data Center Campus | Farciennes, Belgium | Under construction | Dated passes | |
| 97 | maincubes BER02 campus | maincubes | Nauen, Germany | Planned | Dated passes |
| 98 | Microsoft Madrid Data Center Campus | Microsoft | San Sebastián de los Reyes, Spain | Planned | Dated passes |
| 99 | Microsoft Spata data center | Microsoft | Spata, Greece | Under construction | Dated passes |
| 100 | STACK Frankfurt FRA01 | STACK Infrastructure | Frankfurt, Germany | Planned | Dated passes |
| 101 | STACK Zurich ZUR02 | STACK Infrastructure | Dielsdorf, Switzerland | Under construction | Dated passes |
| 102 | Vantage campus | Vantage Data Centers | Bridgend, Wales, United Kingdom | Planned | Dated passes |
SEC filings, annual reports and financing disclosures for tracked Europe operators
| # | Operator & disclosure | Type | Publisher | Date | Filing |
|---|---|---|---|---|---|
| 1 | VIRTUS Data Centres: KKR and Singtel S$1.75B Strategic Investment in ST Telemedia Global Data Centres (2.3 GW Global Footprint) Discloses a S$1.75B (US$1.3B) investment by KKR and Singtel into STT GDC (with S$1.24B additional warrant commitment), supporting over 95 data centres across 11 geographies in Singapore, India. | 8-K / Earnings Release | SGX / STT GDC | 2024-06-18 | Open filing |
| 2 | Microsoft: MICROSOFT CORP 8-K 2026-11-04: Other Events (8.01) Emerging growth company ☐ If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised. | 8-K | Microsoft (SEC 8-K) | 2026-11-04 | Open filing |
| 3 | Microsoft: Microsoft Form 8-K, filed 2026-10-28 Additional information regarding our non-GAAP definition is provided below. All growth comparisons relate to the corresponding period in the last fiscal year. | 8-K | Microsoft (SEC EDGAR) | 2026-10-28 | Open filing |
| 4 | Microsoft: Microsoft Form 10-Q (Q1 FY2027) Microsoft Form 10-Q (Q1 FY2027) reports Revenue: USD 92.28bn (Q3 2026); Operating income: USD 45.91bn (Q3 2026); Net income: USD 36.63bn (Q3 2026); Capital expenditure: USD 39.37bn (Q3 2026). | 10-Q | Microsoft (SEC EDGAR) | 2026-09-30 | Open filing |
| 5 | Vantage Data Centers: Vantage Data Centers Completes $9.2 Billion Equity Investment Led by DigitalBridge and Silver Lake Details $9.2B in upsized equity investment led by DigitalBridge and Silver Lake alongside €1.5B from AustralianSuper across 35+ hyperscale campuses totaling >2.6 GW in North America (Ashburn. | 8-K / Earnings Release | Vantage Data Centers | 2025-06-12 | Open filing |
| 6 | CloudHQ: CloudHQ Global Hyperscale Data Center Campus Portfolio & Multi-Billion Project Financing Report Discloses CloudHQ's hyperscale campus developments across Northern Virginia (Manassas, Ashburn, Culpeper), Mount Prospect (Chicago, Illinois), Chaska (Minnesota), Offenbach (Frankfurt), Didcot. | Annual Report | CloudHQ | 2025-06-05 | Open filing |
| 7 | DATA4: DATA4 Group (Brookfield Infrastructure) EUR 7B European Hyperscale Investment & 1.5 GW Campus Report Details DATA4's €7B investment plan through 2030 across 35+ data centers in France (Marcoussis Paris-Saclay, Nozay), Italy (Cornaredo & Vittuone Milan), Spain (Alcobendas & San Agustin del Guadalix. | Annual Report | DATA4 / Brookfield | 2025-06-01 | Open filing |
| 8 | maincubes: maincubes (DTCP and Art-Invest Real Estate) EUR 1.03B Debt Facility for Frankfurt, Berlin and Amsterdam Expansion Details a EUR 1.03 billion syndicated infrastructure debt facility to expand maincubes FRA01/FRA02/FRA03 in the Rhine-Main region, BER01 in Berlin, and AMS01 in Amsterdam. | Financing Disclosure | maincubes / DTCP | 2025-05-14 | Open filing |
| 9 | atNorth: atNorth (Partners Group) Nordic Sustainable Hyperscale Data Center Portfolio & EUR 1B+ Expansion Report Covers atNorth's 10 Nordic data center campuses across Iceland (ICE01 Reykjavik, ICE02 Keflavik, ICE03 Akureyri), Sweden (SWE01 Stockholm, SWE02 Kista, SWE03 Solleftea mega-site), Finland (FIN01. | Annual Report | atNorth / Partners Group | 2025-06-15 | Open filing |
| 10 | Equinix: EQUINIX INC 8-K 2026-11-09: Other Events (8.01) On November 9, 2026, Equinix Europe 2 Financing Corporation LLC issued multiple series of Senior Notes guaranteed by Equinix, Inc. The aggregate principal amounts include €650,000,000 of 4.150%. | 8-K | Equinix (SEC 8-K) | 2026-11-09 | Open filing |
| 11 | Equinix: Equinix Form 8-K, filed 2026-10-28 Equinix, Inc. reported its third-quarter 2026 results, delivering record annualized gross bookings of $533 million and raising its full-year guidance for the third consecutive quarter. Revenues for. | 8-K | Equinix (SEC EDGAR) | 2026-10-28 | Open filing |
| 12 | Equinix: Equinix Form 10-Q (2026-10-28) Equinix Form 10-Q (2026-10-28) reports Revenue: USD 2.57bn (Q3 2026); Net income: USD 489.0m (Q3 2026). | 10-Q | Equinix (SEC EDGAR) | 2026-09-30 | Open filing |
| 13 | Colt Data Centre Services: Colt Data Centre Services (Fidelity Investments and Mitsui & Co.) US$1.8B JV for Europe and Japan Hyperscale Sites Discloses the joint venture between Fidelity, Colt DCS, and Mitsui & Co. funding 1,000+ MW of operational and planned hyperscale data centres across London (Hayes), Frankfurt, Paris, Berlin, Tokyo. | Financing Disclosure | Colt DCS / Mitsui & Co. | 2025-04-08 | Open filing |
| 14 | EcoDataCenter: EcoDataCenter (Areim) SEK 15B+ Capital Raise & Falun / Borlänge AI Data Center Campus Report Details over SEK 15B (€1.3B+) raised by Areim and EcoDataCenter to expand its renewable-powered Falun campus and the 240+ MW Kvarnsveden (Borlänge) hyperscale AI data center campus in Dalarna, Sweden. | Annual Report | EcoDataCenter / Areim | 2025-05-28 | Open filing |
| 15 | Google: Alphabet Inc. 8-K 2026-11-05: Other Events (8.01) On November 5, 2026, Alphabet Inc. closed its public offering of €6 billion aggregate principal amount of euro-denominated senior notes. The principal executive offices of Alphabet Inc. are located. | 8-K | Alphabet (SEC 8-K) | 2026-11-05 | Open filing |
| 16 | Google: Google Form 10-Q (Q3 2026) Google Form 10-Q (Q3 2026) reports Revenue: USD 127.58bn (Q3 2026); Operating income: USD 40.58bn (Q3 2026); Net income: USD 26.47bn (Q3 2026); Property and equipment, net: USD 372.83bn (at. | 10-Q | Google (SEC EDGAR) | 2026-09-30 | Open filing |
| 17 | Google: Google Form 424B2, filed 2026-11-04 | 424B2 | Google (SEC EDGAR) | 2026-11-04 | Open filing |
| 18 | KAO Data: Infratil Limited (NZX/ASX: IFT) and Legal & General Capital: KAO Data UK HPC and AI Campus Disclosure Discloses Infratil 53% majority stake alongside Legal & General Capital in KAO Data, covering the 40+ MW Harlow campus, Slough, and the 40 MW Manchester Kenwood Point AI data centre development. | Annual Report | NZX / ASX / Infratil Limited | 2025-05-21 | Open filing |
| 19 | QTS Data Centers: QTS Data Centers (Blackstone BREIT / BPP) Global Hyperscale Portfolio & 3+ GW Pipeline Report Covers QTS's $25B+ leased development pipeline across Northern Virginia (Manassas, Ashburn), Phoenix (Glendale, Tempe), Atlanta (Fayeteville, Suwanee), Dallas-Fort Worth (Fort Worth, Irving), New. | Annual Report | QTS Data Centers / Blackstone | 2025-07-23 | Open filing |
| 20 | Echelon Data Centres: Echelon Data Centres (Starwood Capital Group $850M Investment) Ireland & UK Hyperscale Portfolio Report Discloses Starwood Capital's $850M (50% stake) investment in Echelon Data Centres, backing over 500 MW of operational and planned capacity across DUB10 Clondalkin, DUB20 Arklow (200 MW with 220kV. | Annual Report | Echelon Data Centres / Starwood Capital | 2025-04-10 | Open filing |
| 21 | CyrusOne: CyrusOne (KKR & Global Infrastructure Partners) 2025 Sustainability & Global Portfolio Report Details CyrusOne's 55+ operational and under-development hyperscale data centers across North America (Northern Virginia, Dallas-Fort Worth, Phoenix, San Antonio, Chicago, Aurora), Europe (Frankfurt. | Annual Report | CyrusOne / KKR / GIP | 2025-06-10 | Open filing |
| 22 | Yondr Group: Yondr Group (DigitalBridge & La Caisse) Global Hyperscale Campus Portfolio (Slough, Frankfurt, Johor, Loudoun) Covers Yondr Group's 1+ GW hyperscale development portfolio across London Slough (100 MW campus across 3 buildings), Frankfurt (40 MW Bischofsheim), Johor Sedenak Tech Park (300 MW campus backed by. | Annual Report | Yondr Group / DigitalBridge | 2025-07-10 | Open filing |
| 23 | Ark Data Centres: Ark Data Centres (Elliott Investment Management) UK Sovereign & Hyperscale Campus Report Details Ark Data Centres' UK campus portfolio across Cody Park (Farnborough), Spring Park (Corsham), Meridian Park (Enfield), Union Park (Hayes, West London), Longcross Park (Chertsey, 100+ MW), and. | Annual Report | Ark Data Centres | 2025-06-05 | Open filing |
| 24 | Green Mountain: Green Mountain (Azrieli Group) 2025 Sustainability & Hydro-Powered Data Center Portfolio Report Details Green Mountain's 100% renewable hydro-powered data center campuses across Norway (SVG1 Rennesøy, SVG2 Kalberg 90MW+, RJU1 Rjukan, OSL1 Enebakk 120MW, OSL2 Hamar 150MW TikTok campus), London. | Sustainability Report | Green Mountain / Azrieli Group | 2025-05-18 | Open filing |
| 25 | Global Switch: Global Switch Holdings Limited Annual Report 2024 (428,000 sqm Across Europe & Asia-Pacific) Reports £398M revenue and 428,000 sqm (~450 MVA) of Tier III+ carrier-neutral data centre capacity across London Docklands, Paris, Amsterdam, Frankfurt, Madrid, Singapore (Tai Seng & Woodlands). | Annual Report | Global Switch | 2025-04-30 | Open filing |
| 26 | NTT Global Data Centers: NTT Group Integrated Report 2025 - NTT Global Data Centers $10B+ Expansion & 2.2 GW Global Footprint Reports NTT DATA / NTT Global Data Centers operating over 150 data centers across 20+ countries with 1,500+ MW of active IT load and a >700 MW development pipeline across North America (Ashburn. | Annual Report | TSE / NTT Group | 2025-09-30 | Open filing |
| 27 | NTT Global Data Centers: NTT Corporation (TSE: 9432) FY2024 Financial Results & Global Data Center REIT Spin-Off Filing Details NTT Group's ¥1.5 trillion ($10B+) global data center investment program through FY2027 and the listing of the US$1.6B NTT DC REIT in Singapore backed by stabilized hyperscale assets in the. | Annual Report | TSE / SGX / NTT | 2025-05-09 | Open filing |
| 28 | Digital Realty: DIGITAL REALTY TRUST, INC. 8-K 2026-10-30: Other Events (8.01) In connection with Digital Realty Trust, Inc.’s (the “Company”) previously-disclosed acquisition on October 19, 2026 of approximately 16% of the interests in the company’s Teraco joint venture. | 8-K | Digital Realty (SEC 8-K) | 2026-10-30 | Open filing |
| 29 | Digital Realty: Digital Realty Form 8-K, filed 2026-10-29 Digital Realty Trust, Inc. owns, acquires, develops, and operates data centers through its operating partnership subsidiary, Digital Realty Trust, L.P. As of September 30, 2026, the company's 311. | 8-K | Digital Realty (SEC EDGAR) | 2026-10-29 | Open filing |
| 30 | Digital Realty: Digital Realty Form 8-K, filed 2026-07-23 The company is focused on providing data center, colocation, and interconnection solutions for domestic and international customers across a variety of industry verticals ranging from cloud and. | 8-K | Digital Realty (SEC EDGAR) | 2026-07-23 | Open filing |
| 31 | STACK Infrastructure: STACK Infrastructure (Blue Owl / IPI Partners) Global 4+ GW Hyperscale Campus Report Details STACK Infrastructure's multi-gigawatt operational and development footprint across Americas (Northern Virginia, Portland/Hillsboro, Phoenix, Dallas, Silicon Valley, Chicago, New Albany. | Annual Report | STACK Infrastructure / Blue Owl | 2025-07-01 | Open filing |
Full market dataset & site-level records
Open the interactive 2024 vs 2026 satellite slider for 102 Europe data centers
Inspect before-and-after 10 m satellite imagery side by side, exact parcel coordinates, and every sourced filing.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
What does the 2024 vs 2026 satellite tracker measure?
It compares clear 10 m satellite passes from 2024 against 2025 to 2026 passes for each mapped data center campus. Sites where roofed share rose by more than 5 percentage points are labeled filling; others with clear passes are labeled little change.
How many Europe data centers have 2024 vs 2026 satellite comparisons?
As of 19 November 2026, 102 published Europe data centers carry 2024 vs 2026 satellite pass comparisons (1 filling since 2024, 39 little change).
Why are exact roof percentages not published?
Real Assets publishes the percentage-point change range and the 2024 to 2026 direction so buyers can separate active buildout from announcements without republishing raw derived coverage levels. The interactive before-and-after curtain slider is inside the workspace.