← Europe data centers · All sites
Sourced site record, every fact links to its page
Merlin Edged Lisbon Data Center:data center in Vila Franca de Xira, Portugal.
Merlin Edged Lisbon Data Center is an under construction data center in Vila Franca de Xira, Portugal, listed under Edged Energy. Planned capacity is 180 MW according to ir.merlinproperties.com. Real Assets links 2 source pages, including Merlin Properties, ir.merlinproperties.com.
Open this site on the map View permit PDFs & MW timelineunder construction data center · 2 linked sources
- Edged Energy
- Vila Franca de Xira
- Portugal
Approximate metro position & Portugal peer sites (exact coordinates require sign-in)
Facts on record
- OperatorEdged Energy
- City and countryVila Franca de Xira, Portugal
- Statusunder construction
- Planned capacity180 MW, as stated by ir.merlinproperties.com
- Expected completion2028
- Sources linked2 from 2 publishers
- Record updated5 November 2026
- Exact parcel coordinates & street address🔒 View on parcel map
- Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
- Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Real Assets records 7 data centers in Portugal that have a page.
Edged Energy has 4 data centers on record in Europe: 3 operating and 1 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 14:50 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Merlin Properties Invests EUR 1,000 Million in 100 MW Merlin Edged Lisbon Data Center in Vila Franca de Xira, Portugal
Merlin Properties, merlinproperties.com, published 15 September 2026Web page - data center audit 9 capacity_mw
ir.merlinproperties.com, published 14 January 2025Web page - Government permit PDFs, regulatory filings & municipal zoning records (Vila Franca de Xira, Portugal)
Air/water permits, substation filings, tax abatements & site plans🔒 Permit PDFs - Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
Audited facility timeline and transaction history for Merlin Edged Lisbon Data Center🔒 MW timeline
2 sources on record. Public links open the original pages. How the data is built and what a source line means.
Locked site dossier & primary filings
View the 3 government permit PDFs, source filings & MW timeline for Merlin Edged Lisbon Data Center - enter work email
Unlock the complete facility dossier for Merlin Edged Lisbon Data Center (Vila Franca de Xira, Portugal): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.
Edged Energy data centers in other countries
- Merlin Edged Barcelona Zona Franca Data Center
Barcelona, Spain, operating22 MW - Merlin Edged Bilbao Arasur Data Center
Rivabellosa, Spain, operatingNot recorded - Merlin Edged Madrid Getafe Data Center
Getafe, Spain, operatingNot recorded
Other data centers in Portugal
- Start Campus SINES DC
Sines, Portugal, operating1.2 GW - AtlasEdge Lisbon Campus
Carnaxide, Portugal, planned21 MW - LS2 Lisbon IBX
Lisbon, Portugal, operating7 MW - LS1 Lisbon IBX
Lisbon, Portugal, operating3.5 MW - Digital Realty data center campus - Lisbon
Lisbon, Portugal, planned2.4 MW - Digital Realty Lisbon
Lisbon, Portugal, plannedNot recorded
Full site dossier & Europe dataset
Unlock Merlin Edged Lisbon Data Center permit PDFs, MW timeline & 511 other data centers
This page is the public summary for Merlin Edged Lisbon Data Center in Vila Franca de Xira, Portugal. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.
- Exact parcel coordinates, street address and interactive map pin for Merlin Edged Lisbon Data Center
- Phase-by-phase operating vs. planned MW timeline and utility/substation records
- All 3 linked primary sources, government permit PDFs and regulatory filings
- Recorded M&A, lease and financing transactions for Edged Energy in Portugal
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Merlin Edged Lisbon Data Center?
Merlin Edged Lisbon Data Center is recorded under Edged Energy. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Merlin Edged Lisbon Data Center?
In Vila Franca de Xira, Portugal. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Merlin Edged Lisbon Data Center have?
180 MW, as stated by ir.merlinproperties.com. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 2 linked pages by Merlin Properties, ir.merlinproperties.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.