AnalystAIReal Assets Start the 3-day preview

← Europe data centers · All sites · France

Sourced site record, every fact links to its page

Colt Paris 2:data center in Villebon-sur-Yvette, France.

Colt Paris 2 is an under construction data center in Villebon-sur-Yvette, France, listed under Colt Data Centre Services. Planned capacity is 40 MW according to Colt Data Centre Services. 2024 to 2026 satellite: 2024 vs 2026 imagery. Real Assets links 1 source page, including Colt Data Centre Services.

Open this site on the map View the full site record
Villebon-sur-Yvette, FranceColt Data Centre Services
40 MW

under construction data center · 1 linked source

  • Colt Data Centre Services
  • Villebon-sur-Yvette
  • France
🔒Exact position and neighboring pins after sign-in · Open the interactive map

Approximate position and France peer sites (the exact position needs sign-in)

Instant code or 1-click sign-in:
40 MWplanned capacity
Under constructionstatus
1source page linked
Not recordedexpected completion

Facts on record

  • OperatorColt Data Centre Services
  • City and countryVillebon-sur-Yvette, France
  • Statusunder construction
  • Planned capacity40 MW, as stated by Colt Data Centre Services
  • Expected completionNot recorded
  • 2024 vs 2026 satelliteDated 2024 and 2026 passes, (2024 to 2026), 17 February 2024 to 31 October 2026
  • Sources linked1 from 1 publisher
  • Record updated20 November 2026
  • 2024 vs 2026 satellite curtain slider🔒 Compare before and after
  • Exact location on the map🔒 View on the map

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

France has 61 data centers on record in Real Assets, with 189 MW reported as operating and 1.39 GW not yet operating. Colt Paris 2 is one of them.

Colt Data Centre Services has 9 data centers on record in Europe: 4 operating and 5 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. Public links open the original pages. How the data is built and what a source line means.

The full site record

Open Colt Paris 2's record: 1 source page - enter work email

Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.

Instant 6-digit code or 1-click work sign-in (no password):

2024 vs 2026 satellite construction check

Dated 10 m satellite passes are stored for Colt Paris 2 (17 February 2024 to 31 October 2026) for before-and-after comparison in the workspace.

Open 2024 vs 2026 satellite slider · All Europe 2024 vs 2026 satellite-tracked sites

More Colt Data Centre Services data centers in France

Colt Data Centre Services data centers in other countries

Other data centers in France

Full site dossier & Europe dataset

Open Colt Paris 2 and 500 other data centers

This page is the public summary for Colt Paris 2 in Villebon-sur-Yvette, France. Sign in to see its full record: 1 source page.

  • Colt Paris 2 on the interactive map, with the sites around it
  • All 1 linked source page

or continue in one click

A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Colt Paris 2?

Colt Paris 2 is recorded under Colt Data Centre Services. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Colt Paris 2?

In Villebon-sur-Yvette, France. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Colt Paris 2 have?

40 MW, as stated by Colt Data Centre Services. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Is Colt Paris 2 under construction or growing on satellite imagery?

Dated 10 m satellite passes are stored for Colt Paris 2 (17 February 2024 to 31 October 2026) for before-and-after comparison in the workspace.

Where does this information come from?

From 1 linked page by Colt Data Centre Services. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.