← Europe data centers · All sites · Germany · Frankfurt
Sourced site record, every fact links to its page
Colt Frankfurt West:data center in Frankfurt, Germany.
Colt Frankfurt West is an under construction data center in Frankfurt, Germany, listed under Colt Data Centre Services. Planned capacity is 42 MW according to Colt Data Centre Services. Real Assets links 1 source page, including Colt Data Centre Services.
Open this site on the map View permit PDFs & MW timelineunder construction data center · 1 linked source
- Colt Data Centre Services
- Frankfurt
- Germany
Approximate metro position & Germany peer sites (exact coordinates require sign-in)
Facts on record
- OperatorColt Data Centre Services
- City and countryFrankfurt, Germany
- Statusunder construction
- Planned capacity42 MW, as stated by Colt Data Centre Services
- Expected completion2026
- Sources linked1 from 1 publisher
- Record updated4 November 2026
- Exact parcel coordinates & street address🔒 View on parcel map
- Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
- Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Germany has 90 data centers on record in Real Assets, with 1.26 GW reported as operating and 1.44 GW not yet operating. Colt Frankfurt West is one of them.
Colt Data Centre Services has 6 data centers on record in Europe: 4 operating and 2 planned or under construction. See Colt Data Centre Services in Germany (3 sites).
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Colt Frankfurt West Hyperscale Data Centre - Eschborn Frankfurt Germany
Colt Data Centre Services, coltdatacentreservices.com, published 15 September 2026Web page - Government permit PDFs, regulatory filings & municipal zoning records (Frankfurt, Germany)
Air/water permits, substation filings, tax abatements & site plans🔒 Permit PDFs - Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
Audited facility timeline and transaction history for Colt Frankfurt West🔒 MW timeline
1 source on record. Public links open the original pages. How the data is built and what a source line means.
Locked site dossier & primary filings
View the 3 government permit PDFs, source filings & MW timeline for Colt Frankfurt West - enter work email
Unlock the complete facility dossier for Colt Frankfurt West (Frankfurt, Germany): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.
More Colt Data Centre Services data centers in Germany
- Colt Berlin 1
Großbeeren, Germany, planned54 MW - Colt Frankfurt City
Frankfurt, Germany, operating25 MW
Colt Data Centre Services data centers in other countries
- Colt London North
Welwyn Garden City, United Kingdom, operating35 MW - Colt Paris South West
Les Ulis, France, operating24 MW - Colt London West
London, United Kingdom, operating9.4 MW
Other data centers in Germany
- Virtus Berlin Wustermark Campus
Wustermark, Germany, under construction204 MW - maincubes BER02 campus
Nauen, Germany, planned200 MW - DATA4 Frankfurt Hanau Campus
Hanau, Germany, under construction180 MW - Digital Realty Hanau Campus (FRA14-FRA16)
Hanau, Germany, under construction180 MW - AWS European Sovereign Cloud
Brandenburg, Germany, planned150 MW - Goodman Frankfurt Mörfelden & Neu-Isenburg Data Center Campuses (FRA01 & FRA02)
Frankfurt, Germany, operating150 MW
Full site dossier & Europe dataset
Unlock Colt Frankfurt West permit PDFs, MW timeline & 511 other data centers
This page is the public summary for Colt Frankfurt West in Frankfurt, Germany. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.
- Exact parcel coordinates, street address and interactive map pin for Colt Frankfurt West
- Phase-by-phase operating vs. planned MW timeline and utility/substation records
- All 3 linked primary sources, government permit PDFs and regulatory filings
- Recorded M&A, lease and financing transactions for Colt Data Centre Services in Germany
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Colt Frankfurt West?
Colt Frankfurt West is recorded under Colt Data Centre Services. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Colt Frankfurt West?
In Frankfurt, Germany. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Colt Frankfurt West have?
42 MW, as stated by Colt Data Centre Services. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 1 linked page by Colt Data Centre Services. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.