← Europe data centers · All sites · France
Sourced site record, every fact links to its page
Vantage Bordeaux Campus:data center in Gauriaguet, France.
Vantage Bordeaux Campus is a planned data center in Gauriaguet, France, listed under Vantage Data Centers. Planned capacity is 400 MW according to DataCenterKnowledge. Real Assets links 1 source page, including datacenterknowledge.com.
Open this site on the map Start a 7-day trialFacts on record
- OperatorVantage Data Centers
- City and countryGauriaguet, France
- Statusplanned
- Planned capacity400 MW, as stated by DataCenterKnowledge
- Expected completionNot recorded
- Sources linked1 from 1 publisher
- Record updated26 October 2026
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
France has 38 data centers on record in Real Assets, with 494.1 MW reported as operating and 581.8 MW not yet operating. Vantage Bordeaux Campus is one of them.
Vantage Data Centers has 7 data centers on record in Europe: 4 operating and 3 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 29 October 2026; this page was built on 30 October 2026 at 05:25 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- datacenterknowledge.com
datacenterknowledge.comWeb page
1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.
Vantage Data Centers data centers in other countries
- Vantage campus
Bridgend, Wales, United Kingdom, planned400 MW - Vantage campus
St Athan, Wales, United Kingdom, planned250 MW - Vantage LHR1 Campus (Cardiff / Newport CWL1)
Newport, United Kingdom, operating148 MW - Vantage FRA2 Campus (Raunheim)
Raunheim, Germany, operating56 MW - Vantage FRA1 Campus (Offenbach)
Offenbach, Germany, operating55 MW - Vantage WAW1 Campus (Warsaw)
Warsaw, Poland, operating48 MW
Other data centers in France
- Data4 Marcoussis Campus (PAR1-PAR8)
Marcoussis, France, operating250 MW - CloudHQ CDG campus (CDG1/2)
Lisses, France, planned148.8 MW - Digital Realty Marseille MRS1-MRS4 (Submarine Pen Gateway)
Marseille, France, operating72 MW - Digital Realty Paris Saint-Denis (PAR1-PAR7)
Saint-Denis, France, operating68 MW - Equinix PA3 / PA4 / PA10 Saint-Denis Campus
Saint-Denis, France, operating50 MW - Digital Realty Paris Ferrières-en-Brie (PAR8-PAR10)
Ferrières-en-Brie, France, operating48 MW
Full market dataset & site-level records
Open Vantage Bordeaux Campus and 226 other data centers
This page is the public summary. Start a 7-day trial or sign in to see Vantage Bordeaux Campus on the map with its exact location, every sourced figure and the filings behind it.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Questions
Who operates Vantage Bordeaux Campus?
Vantage Bordeaux Campus is recorded under Vantage Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Vantage Bordeaux Campus?
In Gauriaguet, France. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Vantage Bordeaux Campus have?
400 MW, as stated by DataCenterKnowledge. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 1 linked page by datacenterknowledge.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.