← Europe data centers · All sites · United Kingdom
Sourced site record, every fact links to its page
Vantage LHR1 Campus (Cardiff / Newport CWL1):data center in Newport, United Kingdom.
Vantage LHR1 Campus (Cardiff / Newport CWL1) is an operating data center in Newport, United Kingdom, listed under Vantage Data Centers. Capacity is 148 MW according to Vantage Data Centers. Real Assets links 3 source pages, including baxtel.com, Vantage Data Centers.
Open this site on the map Start a 7-day trialFacts on record
- OperatorVantage Data Centers
- City and countryNewport, United Kingdom
- Statusoperating
- Capacity148 MW, as stated by Vantage Data Centers
- Expected completionNot recorded
- Sources linked3 from 2 publishers
- Record updated26 October 2026
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
United Kingdom has 25 data centers on record in Real Assets, with 669.1 MW reported as operating and 3.86 GW not yet operating. Vantage LHR1 Campus (Cardiff / Newport CWL1) is one of them.
Vantage Data Centers has 7 data centers on record in Europe: 4 operating and 3 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 29 October 2026; this page was built on 30 October 2026 at 05:25 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Vantage Secures 1GW Of Heron Solid-State Transformers For AI Campuses
baxtel.comWeb page - Cardiff, United Kingdom Data Center Campus - Vantage Data Centers Skip to content Close S
Vantage Data Centers, vantage-dc.comWeb page
3 sources on record; the 2 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.
More Vantage Data Centers data centers in United Kingdom
- Vantage campus
Bridgend, Wales, United Kingdom, planned400 MW - Vantage campus
St Athan, Wales, United Kingdom, planned250 MW
Vantage Data Centers data centers in other countries
- Vantage Bordeaux Campus
Gauriaguet, France, planned400 MW - Vantage FRA2 Campus (Raunheim)
Raunheim, Germany, operating56 MW - Vantage FRA1 Campus (Offenbach)
Offenbach, Germany, operating55 MW - Vantage WAW1 Campus (Warsaw)
Warsaw, Poland, operating48 MW
Other data centers in United Kingdom
- Blackstone / QTS Blyth AI Hyperscale Campus
Blyth, United Kingdom, planned1 GW - Elsham Tech Park
North Lincolnshire, United Kingdom, planned1 GW - Data Centre & Ecology Park
East Havering (London), United Kingdom, planned600 MW - Equinix Hertfordshire Campus (DC01UK)
South Mimms, United Kingdom, planned250 MW - Shelborn Asset Management Edinburgh Campus
Edinburgh, United Kingdom, planned213 MW - Ada Infrastructure London Docklands
London, United Kingdom, planned210 MW
Full market dataset & site-level records
Open Vantage LHR1 Campus (Cardiff / Newport CWL1) and 226 other data centers
This page is the public summary. Start a 7-day trial or sign in to see Vantage LHR1 Campus (Cardiff / Newport CWL1) on the map with its exact location, every sourced figure and the filings behind it.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Questions
Who operates Vantage LHR1 Campus (Cardiff / Newport CWL1)?
Vantage LHR1 Campus (Cardiff / Newport CWL1) is recorded under Vantage Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Vantage LHR1 Campus (Cardiff / Newport CWL1)?
In Newport, United Kingdom. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Vantage LHR1 Campus (Cardiff / Newport CWL1) have?
148 MW, as stated by Vantage Data Centers. Operating capacity today is not recorded.
Where does this information come from?
From 3 linked pages by baxtel.com, Vantage Data Centers. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.