AnalystAIReal Assets Start free trial

← Europe data centers · All sites · United Kingdom

Sourced site record, every fact links to its page

Vantage campus:data center in Bridgend, Wales, United Kingdom.

Vantage campus is a planned data center in Bridgend, Wales, United Kingdom, listed under Vantage Data Centers. Planned capacity is 400 MW according to Vantage Data Centers. Real Assets links 1 source page, including Vantage Data Centers.

Open this site on the map Start a 7-day trial
400 MWplanned capacity
Plannedstatus
1source page linked
Not recordedexpected completion

Facts on record

  • OperatorVantage Data Centers
  • City and countryBridgend, Wales, United Kingdom
  • Statusplanned
  • Planned capacity400 MW, as stated by Vantage Data Centers
  • Expected completionNot recorded
  • Sources linked1 from 1 publisher
  • Record updated26 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

United Kingdom has 25 data centers on record in Real Assets, with 669.1 MW reported as operating and 3.86 GW not yet operating. Vantage campus is one of them.

Vantage Data Centers has 7 data centers on record in Europe: 4 operating and 3 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 29 October 2026; this page was built on 30 October 2026 at 05:25 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.

More Vantage Data Centers data centers in United Kingdom

Vantage Data Centers data centers in other countries

Other data centers in United Kingdom

Full market dataset & site-level records

Open Vantage campus and 226 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Vantage campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (https://realassets.analystai.ai/mcp)

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Vantage campus?

Vantage campus is recorded under Vantage Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Vantage campus?

In Bridgend, Wales, United Kingdom. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Vantage campus have?

400 MW, as stated by Vantage Data Centers. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Vantage Data Centers. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.