AnalystAIReal Assets Start free trial

← Europe data centers · All sites · United Kingdom

Sourced site record, every fact links to its page

Blackstone / QTS Blyth AI Hyperscale Campus:data center in Blyth, United Kingdom.

Blackstone / QTS Blyth AI Hyperscale Campus is a planned data center in Blyth, United Kingdom, listed under QTS Data Centers. Planned capacity is 1 GW. Real Assets links 2 source pages, including W.Media, placenortheast.co.uk.

Open this site on the map Start a 7-day trial
1 GWplanned capacity
Plannedstatus
2source pages linked
Not recordedexpected completion

Facts on record

  • OperatorQTS Data Centers
  • City and countryBlyth, United Kingdom
  • Statusplanned
  • Planned capacity1 GW
  • Expected completionNot recorded
  • Sources linked2 from 2 publishers
  • Record updated26 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

United Kingdom has 25 data centers on record in Real Assets, with 669.1 MW reported as operating and 3.86 GW not yet operating. Blackstone / QTS Blyth AI Hyperscale Campus is one of them.

QTS Data Centers has 2 data centers on record in Europe: 0 operating and 2 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 29 October 2026; this page was built on 30 October 2026 at 05:25 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

QTS Data Centers data centers in other countries

Other data centers in United Kingdom

Full market dataset & site-level records

Open Blackstone / QTS Blyth AI Hyperscale Campus and 226 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Blackstone / QTS Blyth AI Hyperscale Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (https://realassets.analystai.ai/mcp)

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Blackstone / QTS Blyth AI Hyperscale Campus?

Blackstone / QTS Blyth AI Hyperscale Campus is recorded under QTS Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Blackstone / QTS Blyth AI Hyperscale Campus?

In Blyth, United Kingdom. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Blackstone / QTS Blyth AI Hyperscale Campus have?

1 GW. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 2 linked pages by W.Media, placenortheast.co.uk. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.