← Europe data centers · All sites · Spain
Sourced site record, every fact links to its page
Blackstone Aragon AI Campus (Project Rodes):data center in Calatorao, Spain.
Blackstone Aragon AI Campus (Project Rodes) is an under construction data center in Calatorao, Spain, listed under QTS Data Centers. Planned capacity is 300 MW according to Investment Monitor (GlobalData). Real Assets links 2 source pages, including Investment Monitor (GlobalData), Xataka.
Open this site on the map Start a 7-day trialFacts on record
- OperatorQTS Data Centers
- City and countryCalatorao, Spain
- Statusunder construction
- Planned capacity300 MW, as stated by Investment Monitor (GlobalData)
- Expected completionNot recorded
- Sources linked2 from 2 publishers
- Record updated26 October 2026
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Spain has 21 data centers on record in Real Assets, with 486 MW reported as operating and 2.05 GW not yet operating. Blackstone Aragon AI Campus (Project Rodes) is one of them.
QTS Data Centers has 2 data centers on record in Europe: 0 operating and 2 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 29 October 2026; this page was built on 30 October 2026 at 05:25 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Blackstone to make $8.2bn data centre investment in Spain
Investment Monitor (GlobalData), investmentmonitor.ai, published 16 October 2024Web page - Blackstone invertirá 7.500 millones en un centro de datos en Calatorao
Xataka, xataka.comWeb page
2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
QTS Data Centers data centers in other countries
- Blackstone / QTS Blyth AI Hyperscale Campus
Blyth, United Kingdom, planned1 GW
Other data centers in Spain
- AWS Aragon Megacampus (Zaragoza, Huesca, Teruel)
Zaragoza, Spain, operating350 MW - IREN Badajoz AI Data Center Campus
Badajoz, Spain, planned300 MW - Microsoft new region
Aragón, Spain, planned300 MW - Azora/Tillion campus
Zaragoza, Spain, planned150 MW - Madrid Sur
Madrid, Spain, planned144 MW - Data4 Alcobendas Campus (MAD1-MAD4)
Alcobendas, Spain, operating80 MW
Full market dataset & site-level records
Open Blackstone Aragon AI Campus (Project Rodes) and 226 other data centers
This page is the public summary. Start a 7-day trial or sign in to see Blackstone Aragon AI Campus (Project Rodes) on the map with its exact location, every sourced figure and the filings behind it.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Questions
Who operates Blackstone Aragon AI Campus (Project Rodes)?
Blackstone Aragon AI Campus (Project Rodes) is recorded under QTS Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Blackstone Aragon AI Campus (Project Rodes)?
In Calatorao, Spain. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Blackstone Aragon AI Campus (Project Rodes) have?
300 MW, as stated by Investment Monitor (GlobalData). The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 2 linked pages by Investment Monitor (GlobalData), Xataka. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.