AnalystAIReal Assets Start free trial

← Europe data centers · All sites · Spain

Sourced site record, every fact links to its page

Microsoft new region:data center in Aragón, Spain.

Microsoft new region is a planned data center in Aragón, Spain, listed under Microsoft. Planned capacity is 300 MW according to Microsoft. Real Assets links 1 source page, including Microsoft.

Open this site on the map Start a 7-day trial
300 MWplanned capacity
Plannedstatus
1source page linked
Not recordedexpected completion

Facts on record

  • OperatorMicrosoft
  • City and countryAragón, Spain
  • Statusplanned
  • Planned capacity300 MW, as stated by Microsoft
  • Expected completionNot recorded
  • Sources linked1 from 1 publisher
  • Record updated26 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Spain has 21 data centers on record in Real Assets, with 486 MW reported as operating and 2.05 GW not yet operating. Microsoft new region is one of them.

Microsoft has 11 data centers on record in Europe: 2 operating and 9 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 29 October 2026; this page was built on 30 October 2026 at 05:25 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.

More Microsoft data centers in Spain

Microsoft data centers in other countries

Other data centers in Spain

Full market dataset & site-level records

Open Microsoft new region and 226 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Microsoft new region on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (https://realassets.analystai.ai/mcp)

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Microsoft new region?

Microsoft new region is recorded under Microsoft. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Microsoft new region?

In Aragón, Spain. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Microsoft new region have?

300 MW, as stated by Microsoft. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Microsoft. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.