← Europe data centers · All sites · Spain
Sourced site record, every fact links to its page
IREN Badajoz AI Data Center Campus:data center in Badajoz, Spain.
IREN Badajoz AI Data Center Campus is a planned data center in Badajoz, Spain, listed under IREN (Iris Energy). Planned capacity is 300 MW according to GlobeNewswire / IREN. Real Assets links 1 source page, including GlobeNewswire / IREN.
Open this site on the map Start a 7-day trialFacts on record
- OperatorIREN (Iris Energy)
- City and countryBadajoz, Spain
- Statusplanned
- Planned capacity300 MW, as stated by GlobeNewswire / IREN
- Expected completionNot recorded
- Sources linked1 from 1 publisher
- Record updated26 October 2026
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Spain has 21 data centers on record in Real Assets, with 486 MW reported as operating and 2.05 GW not yet operating. IREN Badajoz AI Data Center Campus is one of them.
IREN (Iris Energy) has 1 data center on record in Europe: 0 operating and 1 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 29 October 2026; this page was built on 30 October 2026 at 05:25 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- IREN to Advance Europe's Sovereign AI Ambitions with 300MW Spanish Campus
GlobeNewswire / IREN, globenewswire.com, published 21 October 2026Web page
1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.
Other data centers in Spain
- AWS Aragon Megacampus (Zaragoza, Huesca, Teruel)
Zaragoza, Spain, operating350 MW - Blackstone Aragon AI Campus (Project Rodes)
Calatorao, Spain, under construction300 MW - Microsoft new region
Aragón, Spain, planned300 MW - Azora/Tillion campus
Zaragoza, Spain, planned150 MW - Madrid Sur
Madrid, Spain, planned144 MW - Data4 Alcobendas Campus (MAD1-MAD4)
Alcobendas, Spain, operating80 MW
Full market dataset & site-level records
Open IREN Badajoz AI Data Center Campus and 226 other data centers
This page is the public summary. Start a 7-day trial or sign in to see IREN Badajoz AI Data Center Campus on the map with its exact location, every sourced figure and the filings behind it.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Questions
Who operates IREN Badajoz AI Data Center Campus?
IREN Badajoz AI Data Center Campus is recorded under IREN (Iris Energy). The operator is the name its sources give, which can differ from the owner or the tenant.
Where is IREN Badajoz AI Data Center Campus?
In Badajoz, Spain. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does IREN Badajoz AI Data Center Campus have?
300 MW, as stated by GlobeNewswire / IREN. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 1 linked page by GlobeNewswire / IREN. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.