Azora/Tillion campus:data center in Zaragoza, Spain.

Azora/Tillion campus is a planned data center in Zaragoza, Spain, listed under Tillion Data Centres. Planned capacity is 150 MW according to Data Center Dynamics. Real Assets links 1 source page, including Data Center Dynamics.

Open this site on the map Start a 7-day trial
150 MWplanned capacity
Plannedstatus
1source page linked
Not recordedexpected completion

Facts on record

  • OperatorTillion Data Centres
  • City and countryZaragoza, Spain
  • Statusplanned
  • Planned capacity150 MW, as stated by Data Center Dynamics
  • Expected completionNot recorded
  • Sources linked1 from 1 publisher
  • Record updated26 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Spain has 21 data centers on record in Real Assets, with 486 MW reported as operating and 2.05 GW not yet operating. Azora/Tillion campus is one of them.

Tillion Data Centres has 1 data center on record in Europe: 0 operating and 1 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 29 October 2026; this page was built on 30 October 2026 at 05:25 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.

Other data centers in Spain

Full market dataset & site-level records

Open Azora/Tillion campus and 226 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Azora/Tillion campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (https://realassets.analystai.ai/mcp)

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Azora/Tillion campus?

Azora/Tillion campus is recorded under Tillion Data Centres. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Azora/Tillion campus?

In Zaragoza, Spain. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Azora/Tillion campus have?

150 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.