← Europe data centers · All sites · Spain
Sourced site record, every fact links to its page
AWS Aragon Megacampus (Zaragoza, Huesca, Teruel):data center in Zaragoza, Spain.
AWS Aragon Megacampus (Zaragoza, Huesca, Teruel) is an operating data center in Zaragoza, Spain, listed under Amazon. Capacity is 350 MW. Real Assets links 2 source pages, including Iberian Property, Go Aragon (Government of Aragon).
Open this site on the map Start a 7-day trialFacts on record
- OperatorAmazon
- City and countryZaragoza, Spain
- Statusoperating
- Capacity350 MW
- Expected completionNot recorded
- Sources linked2 from 2 publishers
- Record updated26 October 2026
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Spain has 21 data centers on record in Real Assets, with 486 MW reported as operating and 2.05 GW not yet operating. AWS Aragon Megacampus (Zaragoza, Huesca, Teruel) is one of them.
Amazon has 3 data centers on record in Europe: 2 operating and 1 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 29 October 2026; this page was built on 30 October 2026 at 05:25 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Amazon increases investment to €33.7bn in Aragon data centre expansion - Iberian Property
Iberian Property, iberian.propertyWeb page - The eighth European region of Amazon Web Services, Spain (Aragon)
Go Aragon (Government of Aragon), goaragon.euWeb page
2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
Amazon data centers in other countries
- AWS European Sovereign Cloud
Brandenburg, Germany, planned150 MW - AWS Cruiserath Campus (DUB050-DUB054)
Dublin, Ireland, operatingNot recorded
Other data centers in Spain
- Blackstone Aragon AI Campus (Project Rodes)
Calatorao, Spain, under construction300 MW - IREN Badajoz AI Data Center Campus
Badajoz, Spain, planned300 MW - Microsoft new region
Aragón, Spain, planned300 MW - Azora/Tillion campus
Zaragoza, Spain, planned150 MW - Madrid Sur
Madrid, Spain, planned144 MW - Data4 Alcobendas Campus (MAD1-MAD4)
Alcobendas, Spain, operating80 MW
Full market dataset & site-level records
Open AWS Aragon Megacampus (Zaragoza, Huesca, Teruel) and 226 other data centers
This page is the public summary. Start a 7-day trial or sign in to see AWS Aragon Megacampus (Zaragoza, Huesca, Teruel) on the map with its exact location, every sourced figure and the filings behind it.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Questions
Who operates AWS Aragon Megacampus (Zaragoza, Huesca, Teruel)?
AWS Aragon Megacampus (Zaragoza, Huesca, Teruel) is recorded under Amazon. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is AWS Aragon Megacampus (Zaragoza, Huesca, Teruel)?
In Zaragoza, Spain. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does AWS Aragon Megacampus (Zaragoza, Huesca, Teruel) have?
350 MW. Operating capacity today is not recorded.
Where does this information come from?
From 2 linked pages by Iberian Property, Go Aragon (Government of Aragon). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.