AnalystAIReal Assets Start free trial

← Europe data centers · All sites · Spain

Sourced site record, every fact links to its page

Nabiax Alcala Data Center 3 ADC3:data center in Alcalá de Henares, Spain.

Nabiax Alcala Data Center 3 ADC3 is an under construction data center in Alcalá de Henares, Spain, listed under Nabiax. Planned capacity is 100 MW according to Data Center Dynamics. Real Assets links 1 source page, including Data Center Dynamics.

Open this site on the map View permit PDFs & MW timeline
Alcalá de Henares, SpainNabiax
100 MW

under construction data center · 1 linked source

  • Nabiax
  • Alcalá de Henares
  • Spain
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Spain peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
100 MWplanned capacity
Under constructionstatus
1source page linked
2029expected completion

Facts on record

  • OperatorNabiax
  • City and countryAlcalá de Henares, Spain
  • Statusunder construction
  • Planned capacity100 MW, as stated by Data Center Dynamics
  • Expected completion2029
  • Sources linked1 from 1 publisher
  • Record updated4 November 2026
  • Exact parcel coordinates & street address🔒 View on parcel map
  • Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
  • Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Spain has 37 data centers on record in Real Assets, with 402.5 MW reported as operating and 4.35 GW not yet operating. Nabiax Alcala Data Center 3 ADC3 is one of them.

Nabiax has 1 data center in Europe with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 3 government permit PDFs, source filings & MW timeline for Nabiax Alcala Data Center 3 ADC3 - enter work email

Unlock the complete facility dossier for Nabiax Alcala Data Center 3 ADC3 (Alcalá de Henares, Spain): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

Other data centers in Spain

Full site dossier & Europe dataset

Unlock Nabiax Alcala Data Center 3 ADC3 permit PDFs, MW timeline & 511 other data centers

This page is the public summary for Nabiax Alcala Data Center 3 ADC3 in Alcalá de Henares, Spain. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for Nabiax Alcala Data Center 3 ADC3
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 3 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for Nabiax in Spain

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Nabiax Alcala Data Center 3 ADC3?

Nabiax Alcala Data Center 3 ADC3 is recorded under Nabiax. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Nabiax Alcala Data Center 3 ADC3?

In Alcalá de Henares, Spain. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Nabiax Alcala Data Center 3 ADC3 have?

100 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.