O-Green San Mateo de Gállego Data Center Campus:data center in San Mateo de Gállego, Spain.

O-Green San Mateo de Gállego Data Center Campus is a planned data center in San Mateo de Gállego, Spain, listed under O-Green. Planned capacity is 570 MW according to Heraldo de Aragon. Real Assets links 1 source page, including Heraldo de Aragon.

Open this site on the map Start a 7-day trial
570 MWplanned capacity
Plannedstatus
1source page linked
Not recordedexpected completion

Facts on record

  • OperatorO-Green
  • City and countrySan Mateo de Gállego, Spain
  • Statusplanned
  • Planned capacity570 MW, as stated by Heraldo de Aragon
  • Expected completionNot recorded
  • Sources linked1 from 1 publisher
  • Record updated28 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Spain has 21 data centers on record in Real Assets, with 486 MW reported as operating and 2.05 GW not yet operating. O-Green San Mateo de Gállego Data Center Campus is one of them.

O-Green has 1 data center in Europe with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 30 October 2026; this page was built on 30 October 2026 at 08:14 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.

Other data centers in Spain

Full market dataset & site-level records

Open O-Green San Mateo de Gállego Data Center Campus and 23 other data centers

This page is the public summary. Start a 7-day trial or sign in to see O-Green San Mateo de Gállego Data Center Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (https://realassets.analystai.ai/mcp)

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates O-Green San Mateo de Gállego Data Center Campus?

O-Green San Mateo de Gállego Data Center Campus is recorded under O-Green. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is O-Green San Mateo de Gállego Data Center Campus?

In San Mateo de Gállego, Spain. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does O-Green San Mateo de Gállego Data Center Campus have?

570 MW, as stated by Heraldo de Aragon. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Heraldo de Aragon. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.