Sesterce Jämsä AI campus (Kaipola):data center in Jämsä, Finland.
Sesterce Jämsä AI campus (Kaipola) is a planned data center in Jämsä, Finland, listed under Sesterce. Planned capacity is 200 MW according to DCD. 2024 to 2026 satellite: little change (-7 to +1 pts). Real Assets links 4 source pages, including DCD, Sesterce.
Open this site on the map View the full site recordplanned data center · 4 linked sources
- Sesterce
- Jämsä
- Finland
Approximate position and Finland peer sites (the exact position needs sign-in)
Facts on record
- OperatorSesterce
- City and countryJämsä, Finland
- Statusplanned
- Planned capacity200 MW, as stated by DCD
- Expected completionNot recorded
- 2024 vs 2026 satelliteLittle roof change, (-7 to +1 pts, 2024 to 2026), 13 April 2024 to 1 October 2026
- Sources linked4 from 2 publishers
- Record updated18 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
- Sourced figures, each with its page and quote🔒 3 figures
- Deals recorded on this site🔒 2 deals
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Finland has 26 data centers on record in Real Assets, with 76.6 MW reported as operating and 1.71 GW not yet operating. Sesterce Jämsä AI campus (Kaipola) is one of them.
Sesterce has 1 data center on record in Europe: 0 operating and 1 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Sesterce to invest $10bn in 600MW AI data center campus in Jämsä, Finland
DCD, datacenterdynamics.com, published 12 November 2026Web page - Sesterce Plans a €10 Billion AI Campus in Jämsä
Sesterce, sesterce.com, published 8 October 2026Web page - 2 additional source filings & extracted fact citations for Sesterce Jämsä AI campus (Kaipola)
Full source ledger and verbatim fact quotes in workspace🔒 Source ledger
4 sources on record; 2 shown above and 2 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.
The full site record
Open Sesterce Jämsä AI campus (Kaipola)'s record: 4 source pages, 3 sourced figures and 2 recorded deals - enter work email
Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.
2024 vs 2026 satellite construction check
Comparing clear 10 m satellite passes across 2024 to 2026 (13 April 2024 to 1 October 2026), Sesterce Jämsä AI campus (Kaipola) shows little change in roofed area with a roofed-share shift of -7 to +1 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Open 2024 vs 2026 satellite slider · All Europe 2024 vs 2026 satellite-tracked sites
Other data centers in Finland
- atNorth FIN04 Kouvola
Kouvola, Finland, under construction430 MW - Polarnode Lappeenranta Campus
Lappeenranta, Finland, planned310 MW - Enetron Park Pyhäjoki data center
Pyhäjoki, Finland, planned250 MW - FIN05
Salo in southwest Finland, Finland, planned230 MW - Compute Nordic Mikkeli AI Campus
Mikkeli, Finland, under construction165 MW - Nebius Mäntsälä AI Data Center Campus
Mäntsälä, Finland, operating75 MW
Full site dossier & Europe dataset
Open Sesterce Jämsä AI campus (Kaipola) and 500 other data centers
This page is the public summary for Sesterce Jämsä AI campus (Kaipola) in Jämsä, Finland. Sign in to see its full record: 4 source pages, 3 sourced figures and 2 recorded deals.
- Sesterce Jämsä AI campus (Kaipola) on the interactive map, with the sites around it
- All 4 linked source pages
- 3 sourced figures, each with its page and quote
- 2 recorded deals on this site
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Sesterce Jämsä AI campus (Kaipola)?
Sesterce Jämsä AI campus (Kaipola) is recorded under Sesterce. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Sesterce Jämsä AI campus (Kaipola)?
In Jämsä, Finland. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Sesterce Jämsä AI campus (Kaipola) have?
200 MW, as stated by DCD. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Is Sesterce Jämsä AI campus (Kaipola) under construction or growing on satellite imagery?
Comparing clear 10 m satellite passes across 2024 to 2026 (13 April 2024 to 1 October 2026), Sesterce Jämsä AI campus (Kaipola) shows little change in roofed area with a roofed-share shift of -7 to +1 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Where does this information come from?