Verne Global, Mäntsälä:data center in Mäntsälä, Finland.
Verne Global, Mäntsälä is an under construction data center in Mäntsälä, Finland, listed under Verne Global. Planned capacity is 70 MW according to Verne Global. 2024 to 2026 satellite: 2024 vs 2026 imagery. Real Assets links 1 source page, including Verne Global.
Open this site on the map View the full site recordunder construction data center · 1 linked source
- Verne Global
- Mäntsälä
- Finland
Approximate position and Finland peer sites (the exact position needs sign-in)
Facts on record
- OperatorVerne Global
- City and countryMäntsälä, Finland
- Statusunder construction
- Planned capacity70 MW, as stated by Verne Global
- Expected completionNot recorded
- 2024 vs 2026 satelliteDated 2024 and 2026 passes, (2024 to 2026), 11 April 2024 to 20 October 2026
- Sources linked1 from 1 publisher
- Record updated17 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Finland has 26 data centers on record in Real Assets, with 76.6 MW reported as operating and 1.71 GW not yet operating. Verne Global, Mäntsälä is one of them.
Verne Global has 4 data centers on record in Europe: 3 operating and 1 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- News: Verne begins construction of the first 70 MW on its data center campus in Mäntsälä
Verne Global, verne.co, published 17 June 2026Web page
1 source on record. Public links open the original pages. How the data is built and what a source line means.
2024 vs 2026 satellite construction check
Dated 10 m satellite passes are stored for Verne Global, Mäntsälä (11 April 2024 to 20 October 2026) for before-and-after comparison in the workspace.
Open 2024 vs 2026 satellite slider · All Europe 2024 vs 2026 satellite-tracked sites
More Verne Global data centers in Finland
- Verne Helsinki Campus
Helsinki, Finland, operatingNot recorded
Verne Global data centers in other countries
- Verne London Volta
London, United Kingdom, operating10 MW - Verne Global Keflavik Campus
Keflavik, Iceland, operatingNot recorded
Other data centers in Finland
- atNorth FIN04 Kouvola
Kouvola, Finland, under construction430 MW - Polarnode Lappeenranta Campus
Lappeenranta, Finland, planned310 MW - Enetron Park Pyhäjoki data center
Pyhäjoki, Finland, planned250 MW - FIN05
Salo in southwest Finland, Finland, planned230 MW - Sesterce Jämsä AI campus (Kaipola)
Jämsä, Finland, planned200 MW - Compute Nordic Mikkeli AI Campus
Mikkeli, Finland, under construction165 MW
Full site dossier & Europe dataset
Open Verne Global, Mäntsälä and 500 other data centers
This page is the public summary for Verne Global, Mäntsälä in Mäntsälä, Finland. Sign in to see its full record: 1 source page.
- Verne Global, Mäntsälä on the interactive map, with the sites around it
- All 1 linked source page
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Verne Global, Mäntsälä?
Verne Global, Mäntsälä is recorded under Verne Global. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Verne Global, Mäntsälä?
In Mäntsälä, Finland. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Verne Global, Mäntsälä have?
70 MW, as stated by Verne Global. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Is Verne Global, Mäntsälä under construction or growing on satellite imagery?
Dated 10 m satellite passes are stored for Verne Global, Mäntsälä (11 April 2024 to 20 October 2026) for before-and-after comparison in the workspace.
Where does this information come from?
From 1 linked page by Verne Global. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.