← Europe data centers · All sites · Italy · Milan
Sourced site record, every fact links to its page
CloudHQ MXP Campus:data center in Milan, Italy.
CloudHQ MXP Campus is a planned data center in Milan, Italy, listed under CloudHQ. Planned capacity is 240 MW according to CloudHQ. 2024 to 2026 satellite: little change (-3 to +5 pts). Real Assets links 1 source page, including CloudHQ.
Open this site on the map View the full site recordplanned data center · 1 linked source
- CloudHQ
- Milan
- Italy
Approximate position and Italy peer sites (the exact position needs sign-in)
Facts on record
- OperatorCloudHQ
- City and countryMilan, Italy
- Statusplanned
- Planned capacity240 MW, as stated by CloudHQ
- Expected completionNot recorded
- 2024 vs 2026 satelliteLittle roof change, (-3 to +5 pts, 2024 to 2026), 11 January 2024 to 1 November 2026
- Sources linked1 from 1 publisher
- Record updated18 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
- Deals recorded on this site🔒 1 deal
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Italy has 17 data centers on record in Real Assets, with 104 MW reported as operating and 1.14 GW not yet operating. CloudHQ MXP Campus is one of them.
CloudHQ has 4 data centers on record in Europe: 0 operating and 4 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- MXP Campus
CloudHQ, cloudhq.comWeb page
1 source on record. Public links open the original pages. How the data is built and what a source line means.
2024 vs 2026 satellite construction check
Comparing clear 10 m satellite passes across 2024 to 2026 (11 January 2024 to 1 November 2026), CloudHQ MXP Campus shows little change in roofed area with a roofed-share shift of -3 to +5 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Open 2024 vs 2026 satellite slider · All Europe 2024 vs 2026 satellite-tracked sites
CloudHQ data centers in other countries
- CloudHQ CDG campus (CDG1/2)
Lisses, France, planned150 MW - CloudHQ LHR Campus (Didcot)
Didcot, United Kingdom, planned101 MW - CloudHQ Frankfurt Campus (Offenbach)
Offenbach, Germany, under construction90 MW
Other data centers in Italy
- Khazna-Eni AI Data Center Campus (Ferrera Erbognone)
Ferrera Erbognone, Italy, planned500 MW - DATA4 Milan Vittuone Campus
Vittuone, Italy, under construction100 MW - Vantage MXP1 Campus (Milan)
Milan, Italy, operating64 MW - STACK Milan MIL01 Campus
Siziano, Italy, operating40 MW - Aruba Global Cloud Data Center Bergamo
Ponte San Pietro, Italy, operatingNot recorded - Aruba Hyper Cloud Data Center Rome
Rome, Italy, operatingNot recorded
Full site dossier & Europe dataset
Open CloudHQ MXP Campus and 500 other data centers
This page is the public summary for CloudHQ MXP Campus in Milan, Italy. Sign in to see its full record: 1 source page and 1 recorded deal.
- CloudHQ MXP Campus on the interactive map, with the sites around it
- All 1 linked source page
- 1 recorded deal on this site
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates CloudHQ MXP Campus?
CloudHQ MXP Campus is recorded under CloudHQ. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is CloudHQ MXP Campus?
In Milan, Italy. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does CloudHQ MXP Campus have?
240 MW, as stated by CloudHQ. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Is CloudHQ MXP Campus under construction or growing on satellite imagery?
Comparing clear 10 m satellite passes across 2024 to 2026 (11 January 2024 to 1 November 2026), CloudHQ MXP Campus shows little change in roofed area with a roofed-share shift of -3 to +5 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Where does this information come from?
From 1 linked page by CloudHQ. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.