← Europe data centers · All sites · Italy
Sourced site record, every fact links to its page
Khazna-Eni AI Data Center Campus (Ferrera Erbognone):data center in Ferrera Erbognone, Italy.
Khazna-Eni AI Data Center Campus (Ferrera Erbognone) is a planned data center in Ferrera Erbognone, Italy, listed under Khazna Data Centers. Planned capacity is 500 MW according to W.Media. 2024 to 2026 satellite: little change (-3 to +5 pts). Real Assets links 2 source pages, including W.Media, eni.com.
Open this site on the map View the full site recordplanned data center · 2 linked sources
- Khazna Data Centers
- Ferrera Erbognone
- Italy
Approximate position and Italy peer sites (the exact position needs sign-in)
Facts on record
- OperatorKhazna Data Centers
- City and countryFerrera Erbognone, Italy
- Statusplanned
- Planned capacity500 MW, as stated by W.Media
- Expected completionNot recorded
- 2024 vs 2026 satelliteLittle roof change, (-3 to +5 pts, 2024 to 2026), 11 January 2024 to 22 October 2026
- Sources linked2 from 2 publishers
- Record updated18 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
- Deals recorded on this site🔒 2 deals
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Italy has 17 data centers on record in Real Assets, with 104 MW reported as operating and 1.14 GW not yet operating. Khazna-Eni AI Data Center Campus (Ferrera Erbognone) is one of them.
Khazna Data Centers has 1 data center on record in Europe: 0 operating and 1 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Khazna partners with Eni to develop 500 MW AI DC campus in Italy
W.Media, published 14 July 2025Web page - Khazna Data Centers and Eni partner to develop 500 MW AI Data Center Campus near Milan
eni.comWeb page
2 sources on record. Public links open the original pages. How the data is built and what a source line means.
The full site record
Open Khazna-Eni AI Data Center Campus (Ferrera Erbognone)'s record: 2 source pages and 2 recorded deals - enter work email
Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.
2024 vs 2026 satellite construction check
Comparing clear 10 m satellite passes across 2024 to 2026 (11 January 2024 to 22 October 2026), Khazna-Eni AI Data Center Campus (Ferrera Erbognone) shows little change in roofed area with a roofed-share shift of -3 to +5 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Open 2024 vs 2026 satellite slider · All Europe 2024 vs 2026 satellite-tracked sites
Other data centers in Italy
- CloudHQ MXP Campus
Milan, Italy, planned240 MW - DATA4 Milan Vittuone Campus
Vittuone, Italy, under construction100 MW - Vantage MXP1 Campus (Milan)
Milan, Italy, operating64 MW - STACK Milan MIL01 Campus
Siziano, Italy, operating40 MW - Aruba Global Cloud Data Center Bergamo
Ponte San Pietro, Italy, operatingNot recorded - Aruba Hyper Cloud Data Center Rome
Rome, Italy, operatingNot recorded
Full site dossier & Europe dataset
Open Khazna-Eni AI Data Center Campus (Ferrera Erbognone) and 500 other data centers
This page is the public summary for Khazna-Eni AI Data Center Campus (Ferrera Erbognone) in Ferrera Erbognone, Italy. Sign in to see its full record: 2 source pages and 2 recorded deals.
- Khazna-Eni AI Data Center Campus (Ferrera Erbognone) on the interactive map, with the sites around it
- All 2 linked source pages
- 2 recorded deals on this site
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Khazna-Eni AI Data Center Campus (Ferrera Erbognone)?
Khazna-Eni AI Data Center Campus (Ferrera Erbognone) is recorded under Khazna Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Khazna-Eni AI Data Center Campus (Ferrera Erbognone)?
In Ferrera Erbognone, Italy. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Khazna-Eni AI Data Center Campus (Ferrera Erbognone) have?
500 MW, as stated by W.Media. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Is Khazna-Eni AI Data Center Campus (Ferrera Erbognone) under construction or growing on satellite imagery?
Comparing clear 10 m satellite passes across 2024 to 2026 (11 January 2024 to 22 October 2026), Khazna-Eni AI Data Center Campus (Ferrera Erbognone) shows little change in roofed area with a roofed-share shift of -3 to +5 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Where does this information come from?
From 2 linked pages by W.Media, eni.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.