atNorth 15 MW Campus (Finland):data center in Espoo, Finland.

atNorth 15 MW Campus (Finland) is an under construction data center in Espoo, Finland, listed under atNorth. Planned capacity is 15 MW according to DataCenterKnowledge. Real Assets links 1 source page, including datacenterknowledge.com.

Open this site on the map Start a 7-day trial
15 MWplanned capacity
Under constructionstatus
1source page linked
Not recordedexpected completion

Facts on record

  • OperatoratNorth
  • City and countryEspoo, Finland
  • Statusunder construction
  • Planned capacity15 MW, as stated by DataCenterKnowledge
  • Expected completionNot recorded
  • Sources linked1 from 1 publisher
  • Record updated26 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Finland has 17 data centers on record in Real Assets, with 340 MW reported as operating and 1.51 GW not yet operating. atNorth 15 MW Campus (Finland) is one of them.

atNorth has 5 data centers on record in Europe: 1 operating and 4 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 29 October 2026; this page was built on 30 October 2026 at 05:25 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.

More atNorth data centers in Finland

  • FIN05
    Salo in southwest Finland, Finland, planned
    230 MW

atNorth data centers in other countries

Other data centers in Finland

Full market dataset & site-level records

Open atNorth 15 MW Campus (Finland) and 226 other data centers

This page is the public summary. Start a 7-day trial or sign in to see atNorth 15 MW Campus (Finland) on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (https://realassets.analystai.ai/mcp)

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates atNorth 15 MW Campus (Finland)?

atNorth 15 MW Campus (Finland) is recorded under atNorth. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is atNorth 15 MW Campus (Finland)?

In Espoo, Finland. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does atNorth 15 MW Campus (Finland) have?

15 MW, as stated by DataCenterKnowledge. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?