← Europe data centers · All operators · All countries
Live market record, the source behind every published figure
atNorth:5 data center sites in Europe.
As of 30 October 2026, Real Assets tracks 5 data center sites listed under atNorth in Europe: 1 operating and 4 planned or under construction. Reported power capacity: 23 MW operating, 575 MW not yet operating. It ranks number 8 by sites among 67 named operators, with 2% of the 249 sites tracked. Largest countries: Finland (2), Sweden (2), Denmark (1).
Unlock all 5 atNorth sites1 operating · 4 planned or under construction · #8 operator
- Finland (2)
- Sweden (2)
- Denmark (1)
Mapped atNorth footprint in Europe (site-level details require sign-in)
Where atNorth is
Largest operators in Europe
atNorth: 6 data centers with their own page
- atNorth SWE04
Sollefteå, Sweden300 MW - FIN05
Salo in southwest Finland, Finland230 MW - atNorth 30 MW Site (Sweden)
Stockholm, Sweden30 MW - atNorth DEN01
Ballerup, Denmark22.5 MW - atNorth 15 MW Campus (Finland)
Espoo, Finland15 MW - FIN02
Espoo, FinlandNot recorded
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.
atNorth: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for atNorth, with disclosed capital expenditure, lease commitments and capacity figures.
- atNorth (Partners Group) Nordic Sustainable Hyperscale Data Center Portfolio & EUR 1B+ Expansion Report (Annual Report · 2025 · filed 15 June 2025)
Covers atNorth's 10 Nordic data center campuses across Iceland (ICE01 Reykjavik, ICE02 Keflavik, ICE03 Akureyri), Sweden (SWE01 Stockholm, SWE02 Kista, SWE03 Solleftea mega-site), Finland (FIN01 Espoo, FIN02 Helsinki, FIN04 Kouvola 60MW+), and Denmark (DEN01 Odense, DEN02 Varde 250MW).Annual Report ↗ - Unlock all atNorth filings and extracted figures →
Full market dataset & site-level records
Unlock all 5 atNorth data center sites in Europe
This page previews atNorth's top footprint. Sign in or start a trial to inspect all 5 individual atNorth facilities, site-by-site capacity, status, and source filings.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 30 October 2026; this page was built on 30 October 2026 at 13:25 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does atNorth have in Europe?
5 tracked as of 30 October 2026: 1 operating and 4 planned or under construction. This is what we have recorded, not a full census.
Where are atNorth's data center sites?
Largest countries by sites: Finland (2), Sweden (2), Denmark (1).
How much power capacity does atNorth have?
Reported power capacity: 23 MW operating, 575 MW not yet operating.
How does atNorth compare with other data center operators?
It ranks number 8 of the 65 largest named operators by sites tracked. The largest is Equinix with 64.
Where does the data come from?
Figures link to the page that published them. Publishers behind this market's data include Epoch AI, Equinix, Digital Realty, Data Center Dynamics, Vantage Data Centers.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data