Baltic Data Center Campus:data center in Choczewo, Poland.
Baltic Data Center Campus is a planned data center in Choczewo, Poland, listed under WBS Power. Planned capacity is 3.2 GW. Real Assets links 1 source page, including datacenterdynamics.com.
Open this site on the map Start a 7-day trialFacts on record
- OperatorWBS Power
- City and countryChoczewo, Poland
- Statusplanned
- Planned capacity3.2 GW
- Expected completionNot recorded
- Sources linked1 from 1 publisher
- Record updated26 October 2026
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Poland has 5 data centers on record in Real Assets, with 72 MW reported as operating and 3.3 GW not yet operating. Baltic Data Center Campus is one of them.
WBS Power has 1 data center on record in Europe: 0 operating and 1 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 29 October 2026; this page was built on 30 October 2026 at 05:25 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- DCN Warsaw 2026: Poland deserves a greater share of global data center capacity - DCD
datacenterdynamics.comWeb page
1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.
Other data centers in Poland
- Microsoft Poland region
Warsaw metro, Poland, planned54 MW - Vantage WAW1 Campus (Warsaw)
Warsaw, Poland, operating48 MW - Atman campus
Duchnice, Poland, planned43 MW - Equinix WA3 Warsaw
Warsaw, Poland, operating24 MW
Full market dataset & site-level records
Open Baltic Data Center Campus and 226 other data centers
This page is the public summary. Start a 7-day trial or sign in to see Baltic Data Center Campus on the map with its exact location, every sourced figure and the filings behind it.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Questions
Who operates Baltic Data Center Campus?
Baltic Data Center Campus is recorded under WBS Power. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Baltic Data Center Campus?
In Choczewo, Poland. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Baltic Data Center Campus have?
3.2 GW. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 1 linked page by datacenterdynamics.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.