← Europe data centers · All operators · All countries
Live market record, the source behind every published figure
Poland data centers:5 sites, 72 MW operating.
As of 30 October 2026, Real Assets tracks 5 data center sites in Poland, 2% of the 249 tracked in Europe. Power capacity: 72 MW operating, 3.3 GW not yet operating (reported for 5 of 5 sites). Most sites: Atman (1), Equinix (1), Microsoft (1).
Unlock all 5 Poland sitessites tracked in Poland · 2% of Europe · 5 operators
- Atman (1)
- Equinix (1)
- Microsoft (1)
Mapped Poland site positions (exact coordinates & facility names require sign-in)
Top operators in Poland
Countries compared
Poland: 5 data centers with their own page
- Baltic Data Center Campus
WBS Power, Choczewo3.2 GW - Microsoft Poland region
Microsoft, Warsaw metro54 MW - Vantage WAW1 Campus (Warsaw)
Vantage Data Centers, Warsaw48 MW - Atman campus
Atman, Duchnice43 MW - Equinix WA3 Warsaw
Equinix, Warsaw24 MW
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.
Full market dataset & site-level records
Unlock all 5 data center sites and 5 operators in Poland
This page previews the top 3 operators in Poland. Sign in or start a trial to view all 5 individual facilities in Poland, exact locations, capacity figures, and source links.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 30 October 2026; this page was built on 30 October 2026 at 13:25 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites are in Poland?
5 as of 30 October 2026, 2% of the 249 tracked in Europe. This is what we have recorded, not a full census.
Who has the most data center sites in Poland?
By sites tracked: Atman (1), Equinix (1), Microsoft (1).
How much power capacity is there in Poland?
Power capacity: 72 MW operating, 3.3 GW not yet operating (reported for 5 of 5 sites).
How does Poland compare with other countries?
Poland ranks number 15 of the 15 largest countries by sites tracked. The largest is Germany with 44.
Where does the data come from?
Figures link to the page that published them. Publishers behind this market's data include Epoch AI, Equinix, Digital Realty, Data Center Dynamics, Vantage Data Centers.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data