CyrusOne FRA5 Hanau Campus is an under construction data center in Hanau, Germany, listed under CyrusOne. Planned capacity is 54 MW according to CyrusOne (operator). Real Assets links 2 source pages, including CyrusOne (operator), CyrusOne.

Open this site on the map Start a 7-day trial
54 MWplanned capacity
Under constructionstatus
2source pages linked
Not recordedexpected completion

Facts on record

  • OperatorCyrusOne
  • City and countryHanau, Germany
  • Statusunder construction
  • Planned capacity54 MW, as stated by CyrusOne (operator)
  • Expected completionNot recorded
  • Sources linked2 from 2 publishers
  • Record updated27 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Germany has 44 data centers on record in Real Assets, with 631.6 MW reported as operating and 776 MW not yet operating. CyrusOne FRA5 Hanau Campus is one of them.

CyrusOne has 5 data centers on record in Europe: 3 operating and 2 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 29 October 2026; this page was built on 30 October 2026 at 05:25 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

More CyrusOne data centers in Germany

CyrusOne data centers in other countries

Other data centers in Germany

Full market dataset & site-level records

Open CyrusOne FRA5 Hanau Campus and 226 other data centers

This page is the public summary. Start a 7-day trial or sign in to see CyrusOne FRA5 Hanau Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (https://realassets.analystai.ai/mcp)

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates CyrusOne FRA5 Hanau Campus?

CyrusOne FRA5 Hanau Campus is recorded under CyrusOne. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is CyrusOne FRA5 Hanau Campus?

In Hanau, Germany. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does CyrusOne FRA5 Hanau Campus have?

54 MW, as stated by CyrusOne (operator). The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 2 linked pages by CyrusOne (operator), CyrusOne. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.