CyrusOne FRA6:data center in Frankfurt, Germany.

CyrusOne FRA6 is an under construction data center in Frankfurt, Germany, listed under CyrusOne. Planned capacity is 84 MW according to CyrusOne. 2024 to 2026 satellite: 2024 vs 2026 imagery. Real Assets links 1 source page, including CyrusOne.

Open this site on the map View the full site record
Frankfurt, GermanyCyrusOne
84 MW

under construction data center · 1 linked source

  • CyrusOne
  • Frankfurt
  • Germany
🔒Exact position and neighboring pins after sign-in · Open the interactive map

Approximate position and Germany peer sites (the exact position needs sign-in)

Instant code or 1-click sign-in:
84 MWplanned capacity
Under constructionstatus
1source page linked
Not recordedexpected completion

Facts on record

  • OperatorCyrusOne
  • City and countryFrankfurt, Germany
  • Statusunder construction
  • Planned capacity84 MW, as stated by CyrusOne
  • Expected completionNot recorded
  • 2024 vs 2026 satelliteDated 2024 and 2026 passes, (2024 to 2026), 28 February 2024 to 14 November 2026
  • Sources linked1 from 1 publisher
  • Record updated18 November 2026
  • 2024 vs 2026 satellite curtain slider🔒 Compare before and after
  • Exact location on the map🔒 View on the map

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Germany has 90 data centers on record in Real Assets, with 441.9 MW reported as operating and 1.17 GW not yet operating. CyrusOne FRA6 is one of them.

CyrusOne has 17 data centers on record in Europe: 13 operating and 4 planned or under construction. See CyrusOne in Germany (8 sites). Compare Digital Realty vs CyrusOne.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

  • FRA6
    CyrusOne, cyrusone.com
    Web page

1 source on record. Public links open the original pages. How the data is built and what a source line means.

The full site record

Open CyrusOne FRA6's record: 1 source page - enter work email

Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.

Instant 6-digit code or 1-click work sign-in (no password):

2024 vs 2026 satellite construction check

Dated 10 m satellite passes are stored for CyrusOne FRA6 (28 February 2024 to 14 November 2026) for before-and-after comparison in the workspace.

Open 2024 vs 2026 satellite slider · All Europe 2024 vs 2026 satellite-tracked sites

More CyrusOne data centers in Germany

CyrusOne data centers in other countries

Other data centers in Germany

Full site dossier & Europe dataset

Open CyrusOne FRA6 and 500 other data centers

This page is the public summary for CyrusOne FRA6 in Frankfurt, Germany. Sign in to see its full record: 1 source page.

  • CyrusOne FRA6 on the interactive map, with the sites around it
  • All 1 linked source page

or continue in one click

A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates CyrusOne FRA6?

CyrusOne FRA6 is recorded under CyrusOne. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is CyrusOne FRA6?

In Frankfurt, Germany. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does CyrusOne FRA6 have?

84 MW, as stated by CyrusOne. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Is CyrusOne FRA6 under construction or growing on satellite imagery?

Dated 10 m satellite passes are stored for CyrusOne FRA6 (28 February 2024 to 14 November 2026) for before-and-after comparison in the workspace.

Where does this information come from?

From 1 linked page by CyrusOne. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.