2024 to 2026 satellite roof-growth tracking across 457 Asia-Pacific data centers: 17 filling, 117 little change. Every row links to the facility's public record and original sources; the interactive 2024 vs 2026 curtain slider opens inside the workspace.
Operators: 2024 vs 2026 buildout
- DayOne
3 filling (60%) · 1 little change5 tracked - ST Telemedia Global Data Centres (STT GDC)
2 filling (11%) · 4 little change18 tracked - Amazon
2 filling (22%) · 1 little change9 tracked - Princeton Digital Group
2 filling (25%) · 0 little change8 tracked - Vantage Data Centers
2 filling (50%) · 1 little change4 tracked - NEXTDC
1 filling (5%) · 4 little change21 tracked - CDC Data Centres
1 filling (11%) · 4 little change9 tracked - Telekom Malaysia
1 filling (33%) · 1 little change3 tracked - Equinix
0 filling (0%) · 1 little change38 tracked - Digital Realty
0 filling (0%) · 0 little change19 tracked - AirTrunk
0 filling (0%) · 7 little change15 tracked - Digital Edge
0 filling (0%) · 2 little change12 tracked - Microsoft
0 filling (0%) · 4 little change11 tracked - NTT Global Data Centers
0 filling (0%) · 1 little change9 tracked - Keppel Data Centres
0 filling (0%) · 0 little change8 tracked - Fujitsu
0 filling (0%) · 3 little change7 tracked - STACK Infrastructure
0 filling (0%) · 5 little change6 tracked - Viettel IDC
0 filling (0%) · 2 little change6 tracked - CtrlS Datacenters
0 filling (0%) · 1 little change5 tracked - ePLDT
0 filling (0%) · 0 little change5 tracked - Sify Technologies
0 filling (0%) · 0 little change5 tracked - Telstra
0 filling (0%) · 3 little change5 tracked - VNPT
0 filling (0%) · 0 little change5 tracked - BDx
0 filling (0%) · 0 little change4 tracked - Bridge Data Centres
0 filling (0%) · 3 little change4 tracked - Colt Data Centre Services
0 filling (0%) · 1 little change4 tracked - DCI Data Centers
0 filling (0%) · 2 little change4 tracked - EdgeConneX
0 filling (0%) · 3 little change4 tracked - FPT Telecom
0 filling (0%) · 0 little change4 tracked - Google
0 filling (0%) · 3 little change4 tracked - Macquarie Data Centres
0 filling (0%) · 2 little change4 tracked - NeutraDC
0 filling (0%) · 0 little change4 tracked - Singtel (Singapore Telecommunications)
0 filling (0%) · 1 little change4 tracked - AAPT
0 filling (0%) · 1 little change3 tracked - Edge Centres
0 filling (0%) · 3 little change3 tracked - KT Corp (Korea Telecom)
0 filling (0%) · 0 little change3 tracked - Over the Wire
0 filling (0%) · 0 little change3 tracked - SUNeVision Holdings Ltd.
0 filling (0%) · 0 little change3 tracked - Telin
0 filling (0%) · 0 little change3 tracked - TPG telecom
0 filling (0%) · 0 little change3 tracked - Vocus
0 filling (0%) · 1 little change3 tracked - 1-Net
0 filling (0%) · 1 little change2 tracked - 5G Networks (5GN)
0 filling (0%) · 0 little change2 tracked - AdaniConneX
0 filling (0%) · 1 little change2 tracked - CMC Telecom
0 filling (0%) · 1 little change2 tracked - Colocity
0 filling (0%) · 0 little change2 tracked - DCI Indonesia
0 filling (0%) · 1 little change2 tracked - Empyrion Digital
0 filling (0%) · 1 little change2 tracked - EscapeNet
0 filling (0%) · 0 little change2 tracked - Evolution Data Centres
0 filling (0%) · 1 little change2 tracked - Firmus Technologies
0 filling (0%) · 1 little change2 tracked - Gaw Capital Partners
0 filling (0%) · 2 little change2 tracked - Global Switch
0 filling (0%) · 0 little change2 tracked - Goodman Group
0 filling (0%) · 1 little change2 tracked - Gulf Development
0 filling (0%) · 1 little change2 tracked - Huawei
0 filling (0%) · 2 little change2 tracked - Keppel DCS3 Services Pte. Ltd.
0 filling (0%) · 0 little change2 tracked - NTT DATA
0 filling (0%) · 0 little change2 tracked - Oper8
0 filling (0%) · 1 little change2 tracked - Saigontel
0 filling (0%) · 0 little change2 tracked - Starmason
0 filling (0%) · 0 little change2 tracked - Telehouse
0 filling (0%) · 0 little change2 tracked - True IDC
0 filling (0%) · 0 little change2 tracked - Yotta
0 filling (0%) · 0 little change2 tracked - YourDC
0 filling (0%) · 2 little change2 tracked
| # | Operator | Tracked | Filling | Little change | Pipeline filling | Pipeline little change | Filings |
|---|---|---|---|---|---|---|---|
| 1 | DayOne | 5 | 3 (60%) | 1 | 120 MW | 180 MW | 6 filings |
| 2 | ST Telemedia Global Data Centres (STT GDC) | 18 | 2 (11%) | 4 | not reported | 316 MW | 1 filing |
| 3 | Amazon | 9 | 2 (22%) | 1 | not reported | not reported | 6 filings |
| 4 | Princeton Digital Group | 8 | 2 (25%) | 0 | 360 MW | not reported | 1 filing |
| 5 | Vantage Data Centers | 4 | 2 (50%) | 1 | 256 MW | 48 MW | 1 filing |
| 6 | NEXTDC | 21 | 1 (5%) | 4 | not reported | not reported | 5 filings |
| 7 | CDC Data Centres | 9 | 1 (11%) | 4 | 155 MW | 150 MW | 2 filings |
| 8 | Telekom Malaysia | 3 | 1 (33%) | 1 | 64 MW | 40 MW | 1 filing |
| 9 | Equinix | 38 | 0 (0%) | 1 | not reported | not reported | 6 filings |
| 10 | Digital Realty | 19 | 0 (0%) | 0 | not reported | not reported | 6 filings |
| 11 | AirTrunk | 15 | 0 (0%) | 7 | not reported | 930 MW | 5 filings |
| 12 | Digital Edge | 12 | 0 (0%) | 2 | not reported | 560 MW | 1 filing |
| 13 | Microsoft | 11 | 0 (0%) | 4 | not reported | 64 MW | 6 filings |
| 14 | NTT Global Data Centers | 9 | 0 (0%) | 1 | not reported | not reported | 2 filings |
| 15 | Keppel Data Centres | 8 | 0 (0%) | 0 | not reported | not reported | 1 filing |
| 16 | Fujitsu | 7 | 0 (0%) | 3 | not reported | not reported | 2 filings |
| 17 | STACK Infrastructure | 6 | 0 (0%) | 5 | not reported | 220 MW | 1 filing |
| 18 | Viettel IDC | 6 | 0 (0%) | 2 | not reported | 60 MW | 1 filing |
| 19 | CtrlS Datacenters | 5 | 0 (0%) | 1 | not reported | 150 MW | 1 filing |
| 20 | ePLDT | 5 | 0 (0%) | 0 | not reported | not reported | private / none |
| 21 | Sify Technologies | 5 | 0 (0%) | 0 | not reported | not reported | 2 filings |
| 22 | Telstra | 5 | 0 (0%) | 3 | not reported | not reported | 1 filing |
| 23 | VNPT | 5 | 0 (0%) | 0 | not reported | not reported | 1 filing |
| 24 | BDx | 4 | 0 (0%) | 0 | not reported | not reported | 1 filing |
| 25 | Bridge Data Centres | 4 | 0 (0%) | 3 | not reported | 693 MW | 6 filings |
| 26 | Colt Data Centre Services | 4 | 0 (0%) | 1 | not reported | 80 MW | 1 filing |
| 27 | DCI Data Centers | 4 | 0 (0%) | 2 | not reported | 8 MW | 1 filing |
| 28 | EdgeConneX | 4 | 0 (0%) | 3 | not reported | 90 MW | 2 filings |
| 29 | FPT Telecom | 4 | 0 (0%) | 0 | not reported | not reported | 1 filing |
| 30 | 4 | 0 (0%) | 3 | not reported | not reported | 6 filings | |
| 31 | Macquarie Data Centres | 4 | 0 (0%) | 2 | not reported | not reported | 1 filing |
| 32 | NeutraDC | 4 | 0 (0%) | 0 | not reported | not reported | 1 filing |
| 33 | Singtel (Singapore Telecommunications) | 4 | 0 (0%) | 1 | not reported | not reported | private / none |
| 34 | AAPT | 3 | 0 (0%) | 1 | not reported | not reported | 1 filing |
| 35 | Edge Centres | 3 | 0 (0%) | 3 | not reported | 10 MW | 1 filing |
| 36 | KT Corp (Korea Telecom) | 3 | 0 (0%) | 0 | not reported | not reported | 2 filings |
| 37 | Over the Wire | 3 | 0 (0%) | 0 | not reported | not reported | 1 filing |
| 38 | SUNeVision Holdings Ltd. | 3 | 0 (0%) | 0 | not reported | not reported | private / none |
| 39 | Telin | 3 | 0 (0%) | 0 | not reported | not reported | private / none |
| 40 | TPG telecom | 3 | 0 (0%) | 0 | not reported | not reported | private / none |
| 41 | Vocus | 3 | 0 (0%) | 1 | not reported | not reported | 1 filing |
| 42 | 1-Net | 2 | 0 (0%) | 1 | not reported | not reported | private / none |
| 43 | 5G Networks (5GN) | 2 | 0 (0%) | 0 | not reported | not reported | 1 filing |
| 44 | AdaniConneX | 2 | 0 (0%) | 1 | not reported | not reported | private / none |
| 45 | CMC Telecom | 2 | 0 (0%) | 1 | not reported | 120 MW | private / none |
| 46 | Colocity | 2 | 0 (0%) | 0 | not reported | not reported | private / none |
| 47 | DCI Indonesia | 2 | 0 (0%) | 1 | not reported | 100 MW | private / none |
| 48 | Empyrion Digital | 2 | 0 (0%) | 1 | not reported | 200 MW | private / none |
| 49 | EscapeNet | 2 | 0 (0%) | 0 | not reported | not reported | private / none |
| 50 | Evolution Data Centres | 2 | 0 (0%) | 1 | not reported | 52 MW | private / none |
| 51 | Firmus Technologies | 2 | 0 (0%) | 1 | not reported | 360 MW | private / none |
| 52 | Gaw Capital Partners | 2 | 0 (0%) | 2 | not reported | 50 MW | private / none |
| 53 | Global Switch | 2 | 0 (0%) | 0 | not reported | not reported | 1 filing |
| 54 | Goodman Group | 2 | 0 (0%) | 1 | not reported | not reported | private / none |
| 55 | Gulf Development | 2 | 0 (0%) | 1 | not reported | 25 MW | private / none |
| 56 | Huawei | 2 | 0 (0%) | 2 | not reported | not reported | private / none |
| 57 | Keppel DCS3 Services Pte. Ltd. | 2 | 0 (0%) | 0 | not reported | not reported | private / none |
| 58 | NTT DATA | 2 | 0 (0%) | 0 | not reported | not reported | 2 filings |
| 59 | Oper8 | 2 | 0 (0%) | 1 | not reported | not reported | private / none |
| 60 | Saigontel | 2 | 0 (0%) | 0 | not reported | not reported | private / none |
| 61 | Starmason | 2 | 0 (0%) | 0 | not reported | not reported | private / none |
| 62 | Telehouse | 2 | 0 (0%) | 0 | not reported | not reported | 2 filings |
| 63 | True IDC | 2 | 0 (0%) | 0 | not reported | not reported | private / none |
| 64 | Yotta | 2 | 0 (0%) | 0 | not reported | not reported | private / none |
| 65 | YourDC | 2 | 0 (0%) | 2 | not reported | not reported | private / none |
Includes operators with at least 2 satellite-tracked sites. Pipeline columns count planned and under-construction sites only, never operating capacity.
Countries: 2024 vs 2026 buildout
- Malaysia
10 filling (19%) · 17 little change54 tracked - Indonesia
3 filling (10%) · 8 little change31 tracked - Australia
2 filling (1%) · 55 little change180 tracked - Singapore
1 filling (2%) · 7 little change51 tracked - Thailand
1 filling (6%) · 8 little change16 tracked - Vietnam
0 filling (0%) · 11 little change44 tracked - Japan
0 filling (0%) · 2 little change30 tracked - India
0 filling (0%) · 2 little change19 tracked - South Korea
0 filling (0%) · 3 little change13 tracked - Philippines
0 filling (0%) · 1 little change12 tracked - Hong Kong
0 filling (0%) · 0 little change4 tracked - China
0 filling (0%) · 2 little change2 tracked
| # | Country | Tracked | Filling | Little change | Pipeline filling | Pipeline little change |
|---|---|---|---|---|---|---|
| 1 | Malaysia | 54 | 10 (19%) | 17 | 460 MW | 1.7 GW |
| 2 | Indonesia | 31 | 3 (10%) | 8 | 420 MW | 1.2 GW |
| 3 | Australia | 180 | 2 (1%) | 55 | 155 MW | 4.4 GW |
| 4 | Singapore | 51 | 1 (2%) | 7 | not reported | 70 MW |
| 5 | Thailand | 16 | 1 (6%) | 8 | not reported | 883 MW |
| 6 | Vietnam | 44 | 0 (0%) | 11 | not reported | 697 MW |
| 7 | Japan | 30 | 0 (0%) | 2 | not reported | 150 MW |
| 8 | India | 19 | 0 (0%) | 2 | not reported | 53 MW |
| 9 | South Korea | 13 | 0 (0%) | 3 | not reported | 320 MW |
| 10 | Philippines | 12 | 0 (0%) | 1 | not reported | 124 MW |
| 11 | Hong Kong | 4 | 0 (0%) | 0 | not reported | not reported |
| 12 | China | 2 | 0 (0%) | 2 | not reported | not reported |
Includes countries with at least 2 satellite-tracked sites.
Asia-Pacific data centers with 2024 vs 2026 satellite passes
| # | Site | Operator | Location | Status | 2024 vs 2026 roof change |
|---|---|---|---|---|---|
| 1 | Springhill Industrial Park Google campus | Gamuda Berhad | Port Dickson, Malaysia | Planned | Filling (+15 to +23 pts) |
| 2 | Iskandar Puteri Data Centre Block 2 | Telekom Malaysia | Iskandar Puteri, Malaysia | Under construction | Filling (+9 to +17 pts) |
| 3 | KUL2 (Cyberjaya Campus) | Vantage Data Centers | Cyberjaya, Malaysia | Under construction | Filling (+8 to +16 pts) |
| 4 | AWS Asia Pacific (Singapore) Cloud Campus (Jurong) | Amazon | Jurong, Tuas, Singapore | Operating | Filling (+8 to +16 pts) |
| 5 | KUL1 (Cyberjaya Campus) | Vantage Data Centers | Cyberjaya, Malaysia | Operating | Filling (+8 to +16 pts) |
| 6 | GDS Nusajaya Tech Park Data Center Campus | DayOne | Iskandar Puteri, Malaysia | Operating | Filling (+7 to +15 pts) |
| 7 | DayOne Malaysia III Nusajaya Tech Park | DayOne | Iskandar Puteri, Malaysia | Under construction | Filling (+7 to +15 pts) |
| 8 | Basis Bay UPDC3 Cyberjaya | Basis Bay | Cyberjaya, Malaysia | Under construction | Filling (+7 to +15 pts) |
| 9 | DayOne Kempas | DayOne | Johor Bahru, Malaysia | Operating | Filling (+5 to +13 pts) |
| 10 | STT Cyberjaya DC.2 | ST Telemedia Global Data Centres (STT GDC) | Cyberjaya, Malaysia | Under construction | Filling (+4 to +12 pts) |
| 11 | PDG JC4 Campus | Princeton Digital Group | Bekasi, Indonesia | Under construction | Filling (+3 to +11 pts) |
| 12 | JC3 | Princeton Digital Group | Bekasi, Indonesia | Under construction | Filling (+2 to +10 pts) |
| 13 | NEXTDC - KL1 Kuala Lumpur | NEXTDC | Petaling Jaya, Malaysia | Operating | Filling (+2 to +10 pts) |
| 14 | NeutraDC Nxera Batam | PT Teknologi Data Infrastruktur (NeutraDC Nxera Batam) | Batam, Indonesia | Under construction | Filling (+2 to +10 pts) |
| 15 | Amazon AWS Ferris Road | Amazon | Melbourne, Australia | Operating | Filling (+2 to +10 pts) |
| 16 | STTGDC BKK2 | ST Telemedia Global Data Centres (STT GDC) | Bangkok, Thailand | Under construction | Filling (+2 to +10 pts) |
| 17 | CDC Brooklyn Campus One | CDC Data Centres | Melbourne, Australia | Under construction | Filling (+1 to +9 pts) |
| 18 | CDC Hobsonville Campus Two | CDC Data Centres | Hobsonville, New Zealand | Operating | Little change (+1 to +9 pts) |
| 19 | CapitaLand Ambattur Data Centre (Chennai) | CapitaLand India Trust | Chennai, India | Under construction | Little change (+1 to +9 pts) |
| 20 | AirTrunk MEL1 | AirTrunk | Melbourne, Australia | Operating | Little change (0 to +8 pts) |
| 21 | SYD52 | Amazon | Smeaton Grange, Australia | Operating | Little change (0 to +8 pts) |
| 22 | Eco Business Park I site | Microsoft | Johor Bahru, Malaysia | Planned | Little change (0 to +8 pts) |
| 23 | Google Singapore Jurong West Data Center (SG1-SG3) | Jurong, Tuas, Singapore | Operating | Little change (-1 to +7 pts) | |
| 24 | BDC MY03 | Bridge Data Centres | Kuala Lumpur, Malaysia | Operating | Little change (-1 to +7 pts) |
| 25 | CDC Fyshwick Campus | CDC Data Centres | Canberra, Australia | Operating | Little change (-1 to +7 pts) |
| 26 | GSA Data Center 02 Chonburi | Gulf Edge | Chonburi, Thailand | Under construction | Little change (-1 to +7 pts) |
| 27 | Fujitsu Melbourne Data Centre | Fujitsu | Melbourne, Australia | Operating | Little change (-1 to +7 pts) |
| 28 | Canberra Data Centres - IC5 Bunker | Macquarie Data Centres | Canberra, Australia | Operating | Little change (-1 to +7 pts) |
| 29 | EdgeConneX (Bukit Jalil) | EdgeConneX | Kuala Lumpur, Malaysia | Planned | Little change (-1 to +7 pts) |
| 30 | YTL Green Data Centre Park | YTL Power | Kulai, Malaysia | Under construction | Little change (-2 to +6 pts) |
| 31 | JHB01 Campus | STACK Infrastructure | Iskandar Puteri, Malaysia | Planned | Little change (-2 to +6 pts) |
| 32 | Bridge Data Centres Thailand Campus | Bridge Data Centres | Chonburi, Thailand | Under construction | Little change (-2 to +6 pts) |
| 33 | DayOne Amata CTP1 Data Center | DayOne | Chonburi, Thailand | Under construction | Little change (-2 to +6 pts) |
| 34 | STT GDC Johor Data Center | ST Telemedia Global Data Centres (STT GDC) | Iskandar Puteri, Malaysia | Under construction | Little change (-2 to +6 pts) |
| 35 | DCI Indonesia B1 Bintan Hyperscale Campus | DCI Indonesia | Bintan, Indonesia | Planned | Little change (-2 to +6 pts) |
| 36 | STT GDC Jakarta 2 | ST Telemedia Global Data Centres (STT GDC) | Bekasi, Indonesia | Operating | Little change (-2 to +6 pts) |
| 37 | SC Zeus Data Center Osaka | SC Zeus Data Centers | Osaka, Japan | Under construction | Little change (-2 to +6 pts) |
| 38 | D1 Darwin CBD | NEXTDC | Darwin, Australia | Operating | Little change (-2 to +6 pts) |
| 39 | Adelaide 01 Data Center | DCI Data Centers | Kidman Park, Australia | Operating | Little change (-2 to +6 pts) |
| 40 | Canberra Data Centres - IC4 Bunker | Macquarie Data Centres | Canberra, Australia | Operating | Little change (-2 to +6 pts) |
| 41 | Biztactix Sunshine DC | Biztactix | Melbourne, Australia | Operating | Little change (-2 to +6 pts) |
| 42 | SC1 Maroochydore | NEXTDC | Sunshine Coast, Australia | Operating | Little change (-2 to +6 pts) |
| 43 | Telstra Exhibition Data Centre | Telstra | Melbourne, Australia | Operating | Little change (-2 to +6 pts) |
| 44 | 45 Donnybrook Road, Mickleham data centre campus | AirTrunk | Mickleham, Australia | Planned | Little change (-2 to +6 pts) |
| 45 | Digital Halo Johor Data Center | Digital Halo | Iskandar Puteri, Malaysia | Under construction | Little change (-2 to +6 pts) |
| 46 | DXC Technology Melbourne Data Centre | DXC Technology | Melbourne, Australia | Operating | Little change (-2 to +6 pts) |
| 47 | Equalbase Data Center | Equalbase | Iskandar Puteri, Malaysia | Planned | Little change (-2 to +6 pts) |
| 48 | NTT Bangkok 5 Data Center (Chonburi) | NTT Global Data Centers | Chonburi, Thailand | Planned | Little change (-2 to +6 pts) |
| 49 | Perri Projects Data Centre | Perri Projects | Melbourne, Australia | Planned | Little change (-2 to +6 pts) |
| 50 | Tungkillo Compute and Energy Hub | Quantum DC | Tungkillo, Australia | Planned | Little change (-3 to +5 pts) |
| 51 | Digital Edge CGK Campus | Digital Edge | Bekasi, Indonesia | Under construction | Little change (-3 to +5 pts) |
| 52 | Mah Sing DC Hub@ Southville City | Bridge Data Centres | Bangi, Malaysia | Planned | Little change (-3 to +5 pts) |
| 53 | Empyrion Digital Johor Hyperscale Campus | Empyrion Digital | Iskandar Puteri, Malaysia | Planned | Little change (-3 to +5 pts) |
| 54 | CDC Laverton Campus | CDC Data Centres | Melbourne, Australia | Under construction | Little change (-3 to +5 pts) |
| 55 | CtrlS Chonburi EEC Data Centre | CtrlS Datacenters | Chonburi, Thailand | Under construction | Little change (-3 to +5 pts) |
| 56 | EdgeConneX Jakarta Hyperscale Campus (JKT02 Cikarang) | EdgeConneX | Bekasi, Indonesia | Under construction | Little change (-3 to +5 pts) |
| 57 | Fujitsu Western Sydney Data Centre | Fujitsu | Sydney, Australia | Operating | Little change (-3 to +5 pts) |
| 58 | KNBDC Malaysia Five Senai Airport City | K2 Strategic | Senai, Malaysia | Operating | Little change (-3 to +5 pts) |
| 59 | CDC Hume Campus Two | CDC Data Centres | Canberra, Australia | Operating | Little change (-3 to +5 pts) |
| 60 | STACK Infrastructure MEL01A | STACK Infrastructure | Melbourne, Australia | Operating | Little change (-3 to +5 pts) |
| 61 | AdaniConneX Chennai 1 | AdaniConneX | Chennai, India | Operating | Little change (-3 to +5 pts) |
| 62 | 1-Net North Data Centre | 1-Net | Kranji, Woodgrove, Woodlands, Singapore | Operating | Little change (-3 to +5 pts) |
| 63 | AIMS Cyberjaya | AIMS Data Centre | Cyberjaya, Malaysia | Operating | Little change (-3 to +5 pts) |
| 64 | Gaw Capital Vietnam DC | Gaw Capital Partners | Ho Chi Minh City, Vietnam | Planned | Little change (-3 to +5 pts) |
| 65 | Gaw NP Industrial Saigon Hi-Tech Park Data Center | Gaw Capital Partners | Ho Chi Minh City, Vietnam | Under construction | Little change (-3 to +5 pts) |
| 66 | PER01B Perth | STACK Infrastructure | Wangara, Australia | Operating | Little change (-3 to +5 pts) |
| 67 | Infinaxis Data Centre | Infinaxis | Cyberjaya, Malaysia | Under construction | Little change (-3 to +5 pts) |
| 68 | Telstra Clayton Data Centre | Telstra | Melbourne, Australia | Operating | Little change (-3 to +5 pts) |
| 69 | Edinburgh Parks (YourDC DC1) | YourDC | Adelaide, Australia | Operating | Little change (-3 to +5 pts) |
| 70 | PER01A Perth | STACK Infrastructure | Wangara, Australia | Operating | Little change (-3 to +5 pts) |
| 71 | ADC Mitchell | Australian Data Centre (ADC) | Canberra, Australia | Operating | Little change (-3 to +5 pts) |
| 72 | DSColo Kenmore Data Center | Digital Sense | Kenmore, Australia | Operating | Little change (-3 to +5 pts) |
| 73 | Intellicentre | Macquarie Telecom (Vocus-connected) | Haymarket, Australia | Operating | Little change (-3 to +5 pts) |
| 74 | EdgeConneX (Cyberjaya) | EdgeConneX | Cyberjaya, Malaysia | Planned | Little change (-3 to +5 pts) |
| 75 | Google Data Center Chonburi | Si Racha, Thailand | Planned | Little change (-3 to +5 pts) | |
| 76 | Kyndryl DC Mt Helen | Kyndryl | Mount Helen, Australia | Operating | Little change (-3 to +5 pts) |
| 77 | Microsoft Woods Road | Microsoft | Melbourne, Australia | Under construction | Little change (-3 to +5 pts) |
| 78 | Vocus SYD04 (Rosebery) | Vocus | Rosebery, Australia | Operating | Little change (-3 to +5 pts) |
| 79 | Western Downs Digital Park | Zerra DC | Dalby, Australia | Planned | Little change (-4 to +4 pts) |
| 80 | Kurri Kurri data centre site (former Hydro Aluminium smelter) | AirTrunk | Kurri Kurri, Australia | Planned | Little change (-4 to +4 pts) |
| 81 | Huawei Wuhu | Huawei | Wuhu, China | Operating | Little change (-4 to +4 pts) |
| 82 | Huawei Horinger | Huawei | Horinger, China | Operating | Little change (-4 to +4 pts) |
| 83 | Batam AI Factory | Firmus Technologies | Batam, Indonesia | Under construction | Little change (-4 to +4 pts) |
| 84 | SYD3 Sydney West | AirTrunk | Huntingwood, Australia | Under construction | Little change (-4 to +4 pts) |
| 85 | M3 West Footscray | NEXTDC | Melbourne, Australia | Operating | Little change (-4 to +4 pts) |
| 86 | AirTrunk JHB1 | AirTrunk | Iskandar Puteri, Malaysia | Operating | Little change (-4 to +4 pts) |
| 87 | CMC Hyperscale Data Center HCMC | CMC Telecom | Ho Chi Minh City, Vietnam | Planned | Little change (-4 to +4 pts) |
| 88 | STT GDC West Java Campus | ST Telemedia Global Data Centres (STT GDC) | Bekasi, Indonesia | Under construction | Little change (-4 to +4 pts) |
| 89 | AirTrunk SGP2 Loyang | AirTrunk | Loyang, Changi, Singapore | Under construction | Little change (-4 to +4 pts) |
| 90 | Nusa Cemerlang Industrial Park site | Microsoft | Iskandar Puteri, Malaysia | Planned | Little change (-4 to +4 pts) |
| 91 | Omnia Data Center Bekasi (GIIC Deltamas) | Warburg Pincus | Bekasi, Indonesia | Under construction | Little change (-4 to +4 pts) |
| 92 | Samsung SDS Gumi AI Data Center | Samsung SDS | Gumi, South Korea | Under construction | Little change (-4 to +4 pts) |
| 93 | Viettel An Khanh Data Center | Viettel IDC | Hanoi, Vietnam | Under construction | Little change (-4 to +4 pts) |
| 94 | Klang Valley Data Centre Block 2 | Telekom Malaysia | Cyberjaya, Malaysia | Under construction | Little change (-4 to +4 pts) |
| 95 | STACK Infrastructure MEL01B | STACK Infrastructure | Melbourne, Australia | Operating | Little change (-4 to +4 pts) |
| 96 | Viettel Hoa Lac Data Center | Viettel IDC | Hanoi, Vietnam | Operating | Little change (-4 to +4 pts) |
| 97 | Worldwide DC Solution 30MW Project | Worldwide DC Solution | Ho Chi Minh City, Vietnam | Planned | Little change (-4 to +4 pts) |
| 98 | GSA Data Center 01 | Gulf Development | Bang Phli, Thailand | Under construction | Little change (-4 to +4 pts) |
| 99 | Infracrowd Capital Vietnam DC | Infracrowd Capital | Da Nang, Vietnam | Planned | Little change (-4 to +4 pts) |
| 100 | Polaris Data Centre | Oper8 | Springfield, Australia | Operating | Little change (-4 to +4 pts) |
| 101 | Edge Centres Hanoi | Edge Centres | Hanoi, Vietnam | Planned | Little change (-4 to +4 pts) |
| 102 | Adelaide 03 | DCI Data Centers | Mawson Lakes, Australia | Planned | Little change (-4 to +4 pts) |
| 103 | P1 Malaga | NEXTDC | Perth, Australia | Operating | Little change (-4 to +4 pts) |
| 104 | AAPT Clarence St East | AAPT | Sydney CBD, Australia | Operating | Little change (-4 to +4 pts) |
| 105 | Goodman Project Pluto | Goodman Group | Guildford, Australia | Planned | Little change (-4 to +4 pts) |
| 106 | JK09 | Microsoft | Karawang, Indonesia | Under construction | Little change (-4 to +4 pts) |
| 107 | MOD Mission Critical MODMC Sydney Data Center | MOD Mission Critical | Sydney, Australia | Operating | Little change (-4 to +4 pts) |
| 108 | TATA Communications Sydney Data Center | TATA Communications | Sydney, Australia | Operating | Little change (-4 to +4 pts) |
| 109 | Telstra Sydney Data Center | Telstra | Sydney, Australia | Operating | Little change (-4 to +4 pts) |
| 110 | Verizon Sydney | Verizon | Pyrmont, Australia | Operating | Little change (-4 to +4 pts) |
| 111 | Haoyang Data Rayong Data Center | Haoyang Data | Pluak Daeng, Thailand | Planned | Little change (-5 to +3 pts) |
| 112 | GAK Sejong | NAVER | Sejong, South Korea | Planned | Little change (-5 to +3 pts) |
| 113 | STT GDC Metro Manila Campus | ST Telemedia Global Data Centres (STT GDC) | Quezon City, Philippines | Under construction | Little change (-5 to +3 pts) |
| 114 | Micron21 Melbourne Datacentre | Micron21 | Kilsyth, Australia | Operating | Little change (-5 to +3 pts) |
| 115 | YourDC Hawthorn | YourDC | Adelaide, Australia | Operating | Little change (-5 to +3 pts) |
| 116 | Edge Centres EC1 Grafton Data Center | Edge Centres | Grafton, Australia | Operating | Little change (-5 to +3 pts) |
| 117 | Edge Centres EC8 Traralgon Data Center | Edge Centres | Traralgon, Australia | Operating | Little change (-5 to +3 pts) |
| 118 | Oz Servers Brisbane | Oz Servers | East Brisbane, Australia | Operating | Little change (-5 to +3 pts) |
| 119 | The Pinnacle | Edge Data Centres | North Lakes, Australia | Planned | Little change (-5 to +3 pts) |
| 120 | SGI-HCM Campus | Kinh Bac City (KBC) | Ho Chi Minh City, Vietnam | Under construction | Little change (-6 to +2 pts) |
Showing top 120 of 457 tracked sites; browse all facilities on the sites directory.
SEC filings, annual reports and financing disclosures for tracked Asia-Pacific operators
| # | Operator & disclosure | Type | Publisher | Date | Filing |
|---|---|---|---|---|---|
| 1 | Telekom Malaysia: Telekom Malaysia Berhad (Bursa: TM) Integrated Annual Report 2024 & TM-Nxera 200MW Johor AI Campus Details TM's 7 domestic data centres (including Klang Valley Data Centre in Cyberjaya and Iskandar Puteri Core Data Centre in Johor) plus the RM 1.15B joint venture with Singtel's Nxera to develop a. | Annual Report | Bursa Malaysia / Telekom Malaysia | 2025-04-25 | Open filing |
| 2 | Vantage Data Centers: Vantage Data Centers Completes $9.2 Billion Equity Investment Led by DigitalBridge and Silver Lake Details $9.2B in upsized equity investment led by DigitalBridge and Silver Lake alongside €1.5B from AustralianSuper across 35+ hyperscale campuses totaling >2.6 GW in North America (Ashburn. | 8-K / Earnings Release | Vantage Data Centers | 2025-06-12 | Open filing |
| 3 | Amazon: Amazon Form 10-Q (Q3 2026) Amazon Form 10-Q (Q3 2026) reports Revenue: USD 201.94bn (Q3 2026); Operating income: USD 28.08bn (Q3 2026); Net income: USD 20.68bn (Q3 2026); Capital expenditure: USD 77.26bn (Q3 2026); Property. | 10-Q | Amazon (SEC EDGAR) | 2026-09-30 | Open filing |
| 4 | Amazon: Amazon Form 8-K, filed 2026-10-29 | 8-K | Amazon (SEC EDGAR) | 2026-10-29 | Open filing |
| 5 | Amazon: Amazon Q3 2026 earnings call transcript | Earnings call transcript | Motley Fool (call transcript) | 2026-10-29 | Open filing |
| 6 | DayOne: GDS Holdings (NASDAQ: GDS) Form 20-F & DayOne International $1.9B Series A/B Hyperscale Portfolio Discloses DayOne (formerly GDS International) raising $1.9B in Series A and Series B equity to scale 480+ MW of committed hyperscale IT capacity and 1.3 GW of secured pipeline across Johor (Nusajaya. | 10-K | SEC EDGAR | 2025-04-28 | Open filing |
| 7 | DayOne: Campus Chip Deployment: DayOne Nusajaya | Filing | Epoch AI / SemiAnalysis | 2026-10-19 | Open filing |
| 8 | DayOne: Oracle Batam - DayOne discloses a partnership with "leading global tech company" at their Batam campus | Filing | linkedin.com | 2026-10-19 | Open filing |
| 9 | ST Telemedia Global Data Centres (STT GDC): KKR and Singtel S$1.75B Strategic Investment in ST Telemedia Global Data Centres (2.3 GW Global Footprint) Discloses a S$1.75B (US$1.3B) investment by KKR and Singtel into STT GDC (with S$1.24B additional warrant commitment), supporting over 95 data centres across 11 geographies in Singapore, India. | 8-K / Earnings Release | SGX / STT GDC | 2024-06-18 | Open filing |
| 10 | Princeton Digital Group: Princeton Digital Group (PDG) $2.5B Capital Raise & 1.1 GW Pan-Asian AI Data Center Portfolio Disclosure Details $1.2B preferred equity from Stonepeak and $1.3B debt financing to scale PDG's 1.1+ GW pan-Asian portfolio across 21 hyperscale campuses in Japan (TY1 Saitama 96 MW), Singapore, Malaysia (JH1. | Annual Report | Princeton Digital Group / Stonepeak | 2025-07-15 | Open filing |
| 11 | NEXTDC: NEXTDC Limited (ASX: NXT) 1H26 Results Presentation & Contracted Utilisation Update Details record contracted utilisation across Sydney (S3 Gore Hill, S2 Macquarie Park, S1) and Melbourne (M2 Tullamarine, M3 West Footscray), A$2.9B liquidity backing hyperscale AI deployments, and. | Presentation | ASX / NEXTDC | 2026-02-24 | Open filing |
| 12 | NEXTDC: NEXTDC Limited (ASX: NXT) FY25 Annual Report & Hyperscale Development Pipeline Reports A$427.2M net revenue (+14% YoY), A$216.7M underlying EBITDA, 173 MW of built capacity across 17 operational data centres in Sydney, Melbourne, Brisbane, Perth, and Adelaide, and a >1.5 GW. | Annual Report | ASX / NEXTDC | 2025-08-27 | Open filing |
| 13 | NEXTDC: NEXTDC Limited (ASX: NXT) 1H26 Results Presentation and Contracted Capacity Update Details record contracted megawatts across Sydney (S3 Gore Hill, S2 Macquarie Park, S1, S4/S5/S7 pipeline) and Melbourne (M2 Tullamarine, M3 West Footscray), plus expansion into Kuala Lumpur (K1, 65. | ASX Filing / Presentation | ASX / NEXTDC Limited | 2026-02-24 | Open filing |
| 14 | CDC Data Centres: Infratil Limited (NZX/ASX: IFT) FY2025 Annual Report - CDC Data Centres Valuation & 2.3 GW Pipeline Discloses CDC Data Centres operating 318 MW of built capacity across 14 facilities in Canberra (Hume & Fyshwick), Sydney (Eastern Creek & Marsden Park), Melbourne (Brooklyn), and Auckland. | Annual Report | NZX / ASX / Infratil | 2025-05-21 | Open filing |
| 15 | CDC Data Centres: Infratil Limited (NZX/ASX: IFT) Independent Valuation of CDC Data Centres and Marsden Park Expansion Reports independent valuation of Infratil 48.2% stake in CDC Data Centres, highlighting over 400 MW of new customer reservations and expansion of the 700+ MW Marsden Park campus in Western Sydney. | NZX / ASX Filing | NZX / ASX / Infratil Limited | 2026-01-15 | Open filing |
| 16 | AirTrunk: Blackstone and CPP Investments A$24B Acquisition of AirTrunk (1.4+ GW Asia-Pacific Hyperscale Platform) Details the A$24B (US$16.1B) acquisition of AirTrunk by Blackstone and CPP Investments, covering 11 hyperscale data centre campuses across Australia (SYD1, SYD2, SYD3, MEL1), Singapore (SGP1), Hong. | 8-K | SEC 8-K / Blackstone | 2024-09-04 | Open filing |
| 17 | AirTrunk: AirTrunk Secures A$4.25B Green Loan for SYD3 Western Sydney Hyperscale Expansion (320+ MW) Discloses an A$4.25 billion green loan syndicated across global institutional lenders to fund the full buildout of AirTrunk SYD3 in Huntingwood, Western Sydney, scaling the campus to over 320 MW of. | Financing Disclosure | AirTrunk Official Financing Release | 2026-10-26 | Open filing |
| 18 | AirTrunk: AirTrunk to Build Second Osaka Hyperscale Data Centre (OSK2, 100 MW) and Scale Japan Footprint to 530+ MW Announces the US$1B+ development of AirTrunk OSK2 in East Osaka with up to 100 MW of IT load, bringing AirTrunk Japan committed capacity across TOK1 (Inzai, 300+ MW), TOK2 (West Tokyo, 110+ MW). | Capacity Disclosure | AirTrunk Official Release | 2025-12-16 | Open filing |
| 19 | Microsoft: MICROSOFT CORP 8-K 2026-11-04: Other Events (8.01) Emerging growth company ☐ If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised. | 8-K | Microsoft (SEC 8-K) | 2026-11-04 | Open filing |
| 20 | Microsoft: Microsoft Form 8-K, filed 2026-10-28 Additional information regarding our non-GAAP definition is provided below. All growth comparisons relate to the corresponding period in the last fiscal year. | 8-K | Microsoft (SEC EDGAR) | 2026-10-28 | Open filing |
| 21 | Microsoft: Microsoft Form 10-Q (Q1 FY2027) Microsoft Form 10-Q (Q1 FY2027) reports Revenue: USD 92.28bn (Q3 2026); Operating income: USD 45.91bn (Q3 2026); Net income: USD 36.63bn (Q3 2026); Capital expenditure: USD 39.37bn (Q3 2026). | 10-Q | Microsoft (SEC EDGAR) | 2026-09-30 | Open filing |
| 22 | Google: Alphabet Inc. 8-K 2026-11-05: Other Events (8.01) On November 5, 2026, Alphabet Inc. closed its public offering of €6 billion aggregate principal amount of euro-denominated senior notes. The principal executive offices of Alphabet Inc. are located. | 8-K | Alphabet (SEC 8-K) | 2026-11-05 | Open filing |
| 23 | Google: Google Form 10-Q (Q3 2026) Google Form 10-Q (Q3 2026) reports Revenue: USD 127.58bn (Q3 2026); Operating income: USD 40.58bn (Q3 2026); Net income: USD 26.47bn (Q3 2026); Property and equipment, net: USD 372.83bn (at. | 10-Q | Google (SEC EDGAR) | 2026-09-30 | Open filing |
| 24 | Google: Google Form 424B2, filed 2026-11-04 | 424B2 | Google (SEC EDGAR) | 2026-11-04 | Open filing |
| 25 | Bridge Data Centres: Bridge Data Centres (Bain Capital) $2.8B Bank Facility & Malaysia / Thailand Hyperscale Expansion Report Details Bridge Data Centres' $2.8B senior secured financing and 500+ MW operational and under-construction hyperscale footprint across Johor (MY06 Sedenak 200+ MW, MY07 Ulu Tiram), Cyberjaya/Bukit. | Annual Report | Bridge Data Centres / Bain Capital | 2025-03-25 | Open filing |
| 26 | Bridge Data Centres: Campus Chip Deployment: Bridge Data Centres MY06 | Filing | Epoch AI / SemiAnalysis | 2026-10-19 | Open filing |
| 27 | Bridge Data Centres: Bridge Data Centres MY06 - SEC filing for Chindata | Filing | US Securities and Exchange Commission | 2026-10-19 | Open filing |
| 28 | Fujitsu: Fujitsu Australia Limited Sovereign Tier III Data Centre Portfolio Report (6 Campuses Across NSW, VIC, QLD, WA) Covers Fujitsu Australia's 6 Tier III colocation data centres in Homebush/Eastern Creek and North Ryde (Sydney), Noble Park (Melbourne), Eight Mile Plains (Brisbane), and Malaga (Perth). | Annual Report | Fujitsu Australia | 2025-05-10 | Open filing |
| 29 | Fujitsu: Fujitsu Limited (TSE: 6702) Integrated Report 2024 (Global & Australian Sovereign Data Centre Footprint) Details Fujitsu's global digital infrastructure and cloud data center network spanning Japan (Tatebayashi, Akashi) and 6 Tier III sovereign colocation facilities across Australia (Sydney Western. | Annual Report | TSE / Fujitsu | 2024-10-30 | Open filing |
| 30 | Macquarie Data Centres: Macquarie Technology Group (ASX: MAQ) FY25 Annual Report (IC3 Super West 45MW & Macquarie Park Campus) Reports 11 consecutive years of EBITDA growth, detailing the 65 MW Macquarie Park Data Centre Campus in Sydney (IC2, IC3 East, and IC3 Super West 45 MW AI-ready expansion), IC1 Sydney CBD, and. | Annual Report | ASX / Macquarie Technology Group | 2025-08-28 | Open filing |
| 31 | EdgeConneX: EdgeConneX (EQT Infrastructure) 2025 Sustainability & 50+ Global Market Capacity Report Reports EdgeConneX operating and developing 80+ data centers across 50+ global markets in North America (Phoenix, Hillsboro, Ashburn, Atlanta, Chicago, New Albany), Europe (Amsterdam, Brussels. | Annual Report | EdgeConneX / EQT Infrastructure | 2025-06-18 | Open filing |
| 32 | EdgeConneX: EdgeConneX website, home page (read 2026-11-09 04:50 UTC) | Filing | EdgeConneX (company website) | 2019-12-11 | Open filing |
| 33 | YTL Power: YTL Power International Berhad (Bursa Malaysia: 6742) Annual Report: 500 MW YTL Green Data Centre Park Johor Audited annual report detailing YTL Data Center Holdings 500 MW solar-powered Green Data Centre Park in Kulai, Johor (anchored by Sea Limited and YTL AI Cloud NVIDIA GB200 supercluster deployment). | Annual Report | Bursa Malaysia / YTL Power International | 2025-10-24 | Open filing |
| 34 | STACK Infrastructure: STACK Infrastructure (Blue Owl / IPI Partners) Global 4+ GW Hyperscale Campus Report Details STACK Infrastructure's multi-gigawatt operational and development footprint across Americas (Northern Virginia, Portland/Hillsboro, Phoenix, Dallas, Silicon Valley, Chicago, New Albany. | Annual Report | STACK Infrastructure / Blue Owl | 2025-07-01 | Open filing |
| 35 | DCI Data Centers: Brookfield-Backed DCI Data Centers Asia-Pacific Portfolio & 250+ MW Pipeline Report Details DCI Data Centers' operational and under-construction hyperscale facilities across Sydney (SYD01 Huntingwood, SYD02, SYD03 Eastern Creek), Adelaide (ADL01, ADL02 Kidman Park, ADL03 Mawson. | Annual Report | DCI Data Centers / Brookfield | 2025-06-01 | Open filing |
| 36 | Telstra: Telstra Group Limited (ASX: TLS) FY25 Annual Report - InfraCo Fixed & Data Centre Infrastructure Reports A$2.7B InfraCo Fixed income across Telstra's national portfolio of major data centres (Clayton, Deakin, Pitt Street, Kent Street, Centennial Park, Exhibition Street, Waymouth Street). | Annual Report | ASX / Telstra | 2025-08-15 | Open filing |
| 37 | NTT Global Data Centers: NTT Group Integrated Report 2025 - NTT Global Data Centers $10B+ Expansion & 2.2 GW Global Footprint Reports NTT DATA / NTT Global Data Centers operating over 150 data centers across 20+ countries with 1,500+ MW of active IT load and a >700 MW development pipeline across North America (Ashburn. | Annual Report | TSE / NTT Group | 2025-09-30 | Open filing |
| 38 | NTT Global Data Centers: NTT Corporation (TSE: 9432) FY2024 Financial Results & Global Data Center REIT Spin-Off Filing Details NTT Group's ¥1.5 trillion ($10B+) global data center investment program through FY2027 and the listing of the US$1.6B NTT DC REIT in Singapore backed by stabilized hyperscale assets in the. | Annual Report | TSE / SGX / NTT | 2025-05-09 | Open filing |
| 39 | Digital Edge: Stonepeak Infrastructure Partners and Digital Edge US$1.6B Equity and Debt Capital Raise for APAC Expansion Discloses US$640M in new equity and US$1.0B in green loan facilities to expand Digital Edge 21-facility, 1.1+ GW pan-Asian platform across Jakarta (EDGE1, EDGE2/CGK Campus), Manila (NARRA1). | Financing Disclosure | Digital Edge / Stonepeak | 2025-01-07 | Open filing |
| 40 | CtrlS Datacenters: CtrlS Datacenters US$2.0B Rated-4 Hyperscale Campus Expansion Across Mumbai, Hyderabad, Chennai and Bangkok Details CtrlS Datacenters 15+ operational facilities and 600+ MW development pipeline across Navi Mumbai (300+ MW campus), Hyderabad, Chennai, Bangalore, Noida, Kolkata, and Chonburi EEC in Thailand. | Capacity Disclosure | CtrlS Datacenters Limited | 2025-06-15 | Open filing |
| 41 | Vocus: Vocus Group A$5.25B Fixed Infrastructure & 30+ Data Centre Network Disclosure Details Vocus's 50,000+ km fibre network, Australia-Singapore Cable (ASC), Project Horizon intercapital fibre, and 30+ owned and connected metropolitan data centres across Sydney, Melbourne. | Annual Report | Vocus Group / MIRA | 2025-08-01 | Open filing |
| 42 | Viettel IDC: Viettel IDC (Viettel Group) 2025 Vietnam Hyperscale Data Center Roadmap (Hoa Lac 30MW & Cu Chi 140MW) Covers Viettel IDC's 6 operational data centers (Hoa Lac 30 MW, Phap Van, Binh Duong, Hoang Hoa Tham, Da Nang) and its planned 140 MW Cu Chi AI data center mega-campus in Ho Chi Minh City, scaling. | Annual Report | Viettel IDC | 2025-04-20 | Open filing |
| 43 | Edge Centres: Edge Centres Off-Grid Solar-Powered Regional Australian & APAC Edge Data Centre Report Details Edge Centres' off-grid solar-powered modular Tier III edge data centres across regional New South Wales (EC1 Grafton, EC2 Dubbo, EC4 Newcastle), Victoria (EC3 Traralgon, EC5 Bendigo), and. | Annual Report | Edge Centres | 2025-05-15 | Open filing |
| 44 | AAPT: AAPT / TPG Telecom Limited (ASX: TPG) Enterprise Fibre & Metropolitan Data Centre Network Report Discloses AAPT and TPG Telecom's national inter-capital dark fibre and metropolitan data centre facilities across Sydney (Glebe, Alexandria, Mascot), Melbourne (Port Melbourne, Richmond), Brisbane. | Annual Report | ASX / TPG Telecom (AAPT) | 2025-03-14 | Open filing |
| 45 | Equinix: EQUINIX INC 8-K 2026-11-09: Other Events (8.01) On November 9, 2026, Equinix Europe 2 Financing Corporation LLC issued multiple series of Senior Notes guaranteed by Equinix, Inc. The aggregate principal amounts include €650,000,000 of 4.150%. | 8-K | Equinix (SEC 8-K) | 2026-11-09 | Open filing |
| 46 | Equinix: Equinix Form 8-K, filed 2026-10-28 Equinix, Inc. reported its third-quarter 2026 results, delivering record annualized gross bookings of $533 million and raising its full-year guidance for the third consecutive quarter. Revenues for. | 8-K | Equinix (SEC EDGAR) | 2026-10-28 | Open filing |
| 47 | Equinix: Equinix Form 10-Q (2026-10-28) Equinix Form 10-Q (2026-10-28) reports Revenue: USD 2.57bn (Q3 2026); Net income: USD 489.0m (Q3 2026). | 10-Q | Equinix (SEC EDGAR) | 2026-09-30 | Open filing |
| 48 | Colt Data Centre Services: Colt Data Centre Services (Fidelity Investments and Mitsui & Co.) US$1.8B JV for Europe and Japan Hyperscale Sites Discloses the joint venture between Fidelity, Colt DCS, and Mitsui & Co. funding 1,000+ MW of operational and planned hyperscale data centres across London (Hayes), Frankfurt, Paris, Berlin, Tokyo. | Financing Disclosure | Colt DCS / Mitsui & Co. | 2025-04-08 | Open filing |
| 49 | Vocus Communications: GlobalEdge / Vocus Balcatta Perth Data Centre - 247 Balcatta Road, WA 6021 Covers Vocus Communications colocation facilities in Melbourne (55 Crockford St Port Melbourne, 28 Thornton Cres Mitcham), Sydney (59 Doody St Alexandria), Perth (1 William St), Brisbane, Adelaide. | Presentation | Vocus | 2025-06-01 | Open filing |
| 50 | BDx: I Squared Capital US$1B+ Commitment to Big Data Exchange (BDx) for Indonesia, Singapore and Hong Kong Growth Details I Squared Capital capital commitment and BDx Indonesia JV (with Indosat Ooredoo Hutchison and Lintasarta) scaling 500+ MW of AI-ready capacity across Jakarta, Surabaya, Batam, Singapore. | Financing Disclosure | BDx Data Centers / I Squared Capital | 2025-02-14 | Open filing |
| 51 | Digital Realty: DIGITAL REALTY TRUST, INC. 8-K 2026-10-30: Other Events (8.01) In connection with Digital Realty Trust, Inc.’s (the “Company”) previously-disclosed acquisition on October 19, 2026 of approximately 16% of the interests in the company’s Teraco joint venture. | 8-K | Digital Realty (SEC 8-K) | 2026-10-30 | Open filing |
| 52 | Digital Realty: Digital Realty Form 8-K, filed 2026-10-29 Digital Realty Trust, Inc. owns, acquires, develops, and operates data centers through its operating partnership subsidiary, Digital Realty Trust, L.P. As of September 30, 2026, the company's 311. | 8-K | Digital Realty (SEC EDGAR) | 2026-10-29 | Open filing |
| 53 | Digital Realty: Digital Realty Form 8-K, filed 2026-07-23 The company is focused on providing data center, colocation, and interconnection solutions for domestic and international customers across a variety of industry verticals ranging from cloud and. | 8-K | Digital Realty (SEC EDGAR) | 2026-07-23 | Open filing |
| 54 | Sify Technologies: Sify Technologies Limited (NASDAQ: SIFY) SEC Form 20-F Annual Report: Sify Infinite Spaces Data Centers SEC Form 20-F detailing Sify Infinite Spaces Limited operating 12 carrier-neutral AI-ready data centers across Mumbai (Rabale, Airoli, Vashi), Noida, Chennai (Siruseri), Bengaluru, Hyderabad, and. | 20-F | SEC EDGAR / Sify Technologies | 2025-07-30 | Open filing |
| 55 | Sify Technologies: Sify Infinite Spaces Secures INR 16,000M (US$200M) Equity Commitment from Kotak Data Center Fund Discloses Kotak Investment Advisors commitment of up to INR 1,600 crore (approximately US$200M) in compulsory convertible debentures into Sify Infinite Spaces Limited to fund greenfield hyperscale. | 6-K | SEC Form 6-K / Sify Technologies | 2024-06-10 | Open filing |
| 56 | KT Corp (Korea Telecom): KT Corporation (NYSE: KT / KRX: 030200) SEC Form 20-F Annual Report: KT Cloud and IDC Infrastructure Audited SEC Form 20-F annual report detailing KT Corporation and subsidiary KT Cloud operating 14 internet data centers across South Korea (including Yongsan, Mokdong 1 and 2, Gangnam, Bundang. | 20-F | SEC EDGAR / KT Corporation | 2026-04-28 | Open filing |
| 57 | KT Corp (Korea Telecom): KT Corporation Investor Relations: FY2025 Earnings Release and AI / Cloud Data Center Capex Disclosure Reports KT Cloud revenue growth (+15.5% YoY) driven by global hyperscaler colocation in Greater Seoul and strategic partnership with Microsoft on Korean sovereign cloud and AI data center capacity. | 8-K / Earnings Release | KRX / KT Corporation IR | 2026-02-12 | Open filing |
| 58 | Global Switch: Global Switch Holdings Limited Annual Report 2024 (428,000 sqm Across Europe & Asia-Pacific) Reports £398M revenue and 428,000 sqm (~450 MVA) of Tier III+ carrier-neutral data centre capacity across London Docklands, Paris, Amsterdam, Frankfurt, Madrid, Singapore (Tai Seng & Woodlands). | Annual Report | Global Switch | 2025-04-30 | Open filing |
| 59 | LG Uplus: LG Uplus Corp. (KRX: 032640) Annual Business Report and Paju / Pyeongchon Mega Data Center Disclosures Discloses LG Uplus enterprise IDC operations across 7+ Korean facilities including Pyeongchon Mega Center (165 MW), Pyeongchon 2 Center, Sangam, Gasan, Seocho, and 논현, plus the KRW 1.3 trillion Paju. | Annual Report | KRX DART / LG Uplus IR | 2026-03-20 | Open filing |
| 60 | Keppel Data Centres: Keppel Data Centres & Keppel DC REIT FY 2025 Portfolio & 1.2 GW APAC-Europe Capacity Report Details 35+ data centres across 10 countries in Asia-Pacific and Europe (including Keppel DC Singapore 1-8, Genting Lane, Tokyo West 1, Gore Hill Sydney, and Dublin/Frankfurt/London campuses). | Annual Report | SGX / Keppel | 2026-01-30 | Open filing |
| 61 | FPT Telecom: FPT Corporation (HOSE: FPT) Annual Report 2024 (FPT Fornix Tier III Data Centers & $200M NVIDIA AI Factory) Discloses FPT Telecom's 4 hyperscale Tier III FPT Fornix data centers across Hanoi (Cau Giay & Hoa Lac) and Ho Chi Minh City (Tan Thuan EPZ & District 9 Saigon Hi-Tech Park, 3,600 racks), alongside. | Annual Report | HOSE / FPT Corporation | 2025-03-28 | Open filing |
| 62 | VNPT: Vietnam Posts and Telecommunications Group (VNPT) IDC Data Center Network & Hoa Lac Tier III Report Details VNPT's 8 Tier III IDC data centers across Vietnam, anchored by VNPT IDC Hoa Lac (2,000 racks in Hanoi High-Tech Park), Nam Thang Long, Nguyen Thi Minh Khai, Tan Thuan (Ho Chi Minh City), and. | Annual Report | VNPT IDC | 2025-05-12 | Open filing |
| 63 | NeutraDC: PT Telkom Data Ekosistem (NeutraDC / IDX: TLKM) Annual Report 2024 (Cikarang 42MW & Batam 51MW Hyperscale Campuses) Discloses Telkom Indonesia's NeutraDC data center platform across 30+ sites including the 42 MW Cikarang Hyperscale Data Center (Bekasi), 20 MW Serpong campus, 18 MW Surabaya campus, and the 51 MW. | Annual Report | IDX / Telkom Indonesia (NeutraDC) | 2025-04-15 | Open filing |
| 64 | Iron Mountain: Iron Mountain Form 8-K, filed 2026-11-05 (exhibit q32026srpfinal.htm) Iron Mountain Incorporated reported third quarter 2026 results with record revenue of $2.0 billion and net income of $129 million. The company achieved data center leasing of 102 megawatts in the. | 8-K | Iron Mountain (SEC EDGAR) | 2026-11-05 | Open filing |
| 65 | Iron Mountain: Iron Mountain Form 10-Q (2026-08-05) Iron Mountain Form 10-Q (2026-08-05) reports Revenue: USD 2.03bn (Q2 2026); Net income: USD 106.1m (Q2 2026). | 10-Q | Iron Mountain (SEC EDGAR) | 2026-06-30 | Open filing |
| 66 | Iron Mountain: Iron Mountain Incorporated Form 10-K, fiscal year 2025 Iron Mountain FY 2025 Form 10-K: Reports 488 MW of operating leasable data center capacity as of December 31, 2025, plus 852 MW under construction or held for development, for a total potential data. | 10-K | Iron Mountain | 2025-12-31 | Open filing |
| 67 | iSeek: iseek & HMC Capital DigiCo Infrastructure REIT (ASX: DGT) A$400M Acquisition & Queensland AI Data Centre Report Discloses HMC Capital's DigiCo Infrastructure REIT (ASX: DGT) acquisition of iseek for A$400M, covering 5 operational data centres across Brisbane (Brisbane Airport Eagle Farm, Gore Hill/Kemp Place. | Annual Report | ASX / HMC Capital (DigiCo REIT) | 2025-02-20 | Open filing |
| 68 | 5G Networks (5GN): 5G Networks Limited (ASX: 5GN) Annual Report 2024 (Australian Owned Tier III Data Centres & Cloud Network) Details 5GN's owned and operated Australian data centre footprint across Melbourne (5GN Melbourne CBD & Port Melbourne), Sydney (Pyrmont & St Leonards), Brisbane (Fortitude Valley), Adelaide, and. | Annual Report | ASX / 5G Networks | 2024-09-27 | Open filing |
| 69 | Telehouse: KDDI Corporation Integrated Report 2025 - Telehouse Global Interconnection & Data Center Portfolio Details KDDI's Telehouse colocation and interconnection portfolio spanning 45+ sites in 10+ countries, anchored by Telehouse London Docklands (including £275M Telehouse South), Telehouse Paris. | Annual Report | TSE / KDDI | 2025-09-01 | Open filing |
| 70 | Telehouse: KDDI Corporation (TYO: 9433) Integrated Report: Telehouse Global Interconnection and London Docklands Campus Details KDDI subsidiary Telehouse operating 45+ carrier-hotel data centres across London Docklands (North, East, West, West Two, South), Paris (Voltaire, Magny-les-Hameaux), Frankfurt, and Tokyo. | Annual Report | TSE / KDDI Corporation | 2025-09-10 | Open filing |
| 71 | Over the Wire: Over the Wire / Aussie Broadband Limited (ASX: ABB) Annual Report 2024 (Brisbane & Sydney Data Centres) Discloses Aussie Broadband's enterprise cloud and colocation division (formerly Over the Wire Holdings, acquired for A$390M), operating 4 Brisbane data centres (Fortitude Valley, Spring Hill, Eight. | Annual Report | ASX / Aussie Broadband (Over the Wire) | 2024-08-26 | Open filing |
| 72 | Datacom: Datacom Group Limited FY25 Annual Report (NZ$1.47B Revenue & 4 New Zealand Sovereign Data Centres) Reports NZ$1.47B in annual revenue and details Datacom's 4 Tier III+ New Zealand sovereign cloud data centres across Auckland (Orbit Drive Albany), Hamilton (Kapuni), Wellington (Trentham), and. | Annual Report | Datacom Group | 2025-06-15 | Open filing |
| 73 | Leading Edge Data Centres: Leading Edge Data Centres (DigitalBridge) A$30M+ Regional Australian Edge Colocation Network Report Covers Leading Edge Data Centres' Tier III regional Australian edge data centre network backed by DigitalBridge across Newcastle, Tamworth, Wagga Wagga, Dubbo, Albury-Wodonga, Coffs Harbour. | Annual Report | Leading Edge Data Centres / DigitalBridge | 2025-05-20 | Open filing |
Full market dataset & site-level records
Open the interactive 2024 vs 2026 satellite slider for 457 Asia-Pacific data centers
Inspect before-and-after 10 m satellite imagery side by side, exact parcel coordinates, and every sourced filing.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in
Instant sign-in with a 6-digit email code or single sign-on. No password required.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
What does the 2024 vs 2026 satellite tracker measure?
It compares clear 10 m satellite passes from 2024 against 2025 to 2026 passes for each mapped data center campus. Sites where roofed share rose by more than 5 percentage points are labeled filling; others with clear passes are labeled little change.
How many Asia-Pacific data centers have 2024 vs 2026 satellite comparisons?
As of 19 November 2026, 457 published Asia-Pacific data centers carry 2024 vs 2026 satellite pass comparisons (17 filling since 2024, 117 little change).
Why are exact roof percentages not published?
Real Assets publishes the percentage-point change range and the 2024 to 2026 direction so buyers can separate active buildout from announcements without republishing raw derived coverage levels. The interactive before-and-after curtain slider is inside the workspace.