← Asia-Pacific data centers · All sites · Australia
Sourced site record, every fact links to its page
Western Downs Digital Park:data center in Dalby, Australia.
Western Downs Digital Park is a planned data center in Dalby, Australia, listed under Zerra DC. Planned capacity is 2.16 GW according to The Land. 2024 to 2026 satellite: little change (-4 to +4 pts). Real Assets links 3 source pages, including Stock Journal, The Land.
Open this site on the map View the full site recordplanned data center · 3 linked sources
- Zerra DC
- Dalby
- Australia
Approximate position and Australia peer sites (the exact position needs sign-in)
Facts on record
- OperatorZerra DC
- City and countryDalby, Australia
- Statusplanned
- Planned capacity2.16 GW, as stated by The Land
- Expected completionNot recorded
- 2024 vs 2026 satelliteLittle roof change, (-4 to +4 pts, 2024 to 2026), 14 January 2024 to 17 November 2026
- Sources linked3 from 2 publishers
- Record updated20 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Australia has 216 data centers on record in Real Assets, with 1.96 GW reported as operating and 9.05 GW not yet operating. Western Downs Digital Park is one of them.
Zerra DC has 1 data center in Asia-Pacific with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- M3 facility
Stock Journal, stockjournal.com.au, published 8 November 2026Web page - Ross Cadell warns Labor: how the AI boom risks power grids | The Land | NSW
The Land, theland.com.au, published 22 October 2026Web page - 1 additional source filing & extracted fact citations for Western Downs Digital Park
Full source ledger and verbatim fact quotes in workspace🔒 Source ledger
3 sources on record; 2 shown above and 1 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.
2024 vs 2026 satellite construction check
Comparing clear 10 m satellite passes across 2024 to 2026 (14 January 2024 to 17 November 2026), Western Downs Digital Park shows little change in roofed area with a roofed-share shift of -4 to +4 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Open 2024 vs 2026 satellite slider · All Asia-Pacific 2024 vs 2026 satellite-tracked sites
Other data centers in Australia
- Tungkillo Compute and Energy Hub
Tungkillo, Australia, planned1.2 GW - S7 Eastern Creek
Sydney, Australia, planned550 MW - Kurri Kurri data centre site (former Hydro Aluminium smelter)
Kurri Kurri, Australia, planned540 MW - AirTrunk MEL2 Campus
Tullamarine, Australia, planned354 MW - M3 West Footscray
Melbourne, Australia, operating225 MW - Macquarie Engineering and Technology Campus
Ryde, Australia, planned200 MW
Full site dossier & Asia-Pacific dataset
Open Western Downs Digital Park and 703 other data centers
This page is the public summary for Western Downs Digital Park in Dalby, Australia. Sign in to see its full record: 3 source pages.
- Western Downs Digital Park on the interactive map, with the sites around it
- All 3 linked source pages
Instant sign-in with a 6-digit email code or single sign-on. No password required.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Western Downs Digital Park?
Western Downs Digital Park is recorded under Zerra DC. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Western Downs Digital Park?
In Dalby, Australia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Western Downs Digital Park have?
2.16 GW, as stated by The Land. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Is Western Downs Digital Park under construction or growing on satellite imagery?
Comparing clear 10 m satellite passes across 2024 to 2026 (14 January 2024 to 17 November 2026), Western Downs Digital Park shows little change in roofed area with a roofed-share shift of -4 to +4 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Where does this information come from?
From 3 linked pages by Stock Journal, The Land. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.