← Asia-Pacific data centers · All sites · Australia
Sourced site record, every fact links to its page
Kurri Kurri data centre site (former Hydro Aluminium smelter):data center in Kurri Kurri, Australia.
Kurri Kurri data centre site (former Hydro Aluminium smelter) is a planned data center in Kurri Kurri, Australia, listed under AirTrunk. Planned capacity is 540 MW according to Mingtiandi. Real Assets links 1 source page, including Mingtiandi.
Open this site on the map View permit PDFs & MW timelineplanned data center · 1 linked source
- AirTrunk
- Kurri Kurri
- Australia
Approximate metro position & Australia peer sites (exact coordinates require sign-in)
Facts on record
- OperatorAirTrunk
- City and countryKurri Kurri, Australia
- Statusplanned
- Planned capacity540 MW, as stated by Mingtiandi
- Expected completionNot recorded
- Sources linked1 from 1 publisher
- Record updated11 November 2026
- Exact parcel coordinates & street address🔒 View on parcel map
- Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
- Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Australia has 247 data centers on record in Real Assets, with 1.96 GW reported as operating and 5.33 GW not yet operating. Kurri Kurri data centre site (former Hydro Aluminium smelter) is one of them.
AirTrunk has 18 data centers on record in Asia-Pacific: 8 operating and 10 planned or under construction. See AirTrunk in Australia (8 sites). Compare Equinix vs AirTrunk.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 14:50 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- AirTrunk, Stockland Scrap Sydney Data Centre Plans - MingtiandiFacebookLinkedInRSSTwitterFacebookLinkedInRSSTwitter
Mingtiandi, mingtiandi.com, published 9 November 2026Web page - Government permit PDFs, regulatory filings & municipal zoning records (Kurri Kurri, Australia)
Air/water permits, substation filings, tax abatements & site plans🔒 Permit PDFs - Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
Audited facility timeline and transaction history for Kurri Kurri data centre site (former Hydro Aluminium smelter)🔒 MW timeline
1 source on record. Public links open the original pages. How the data is built and what a source line means.
Locked site dossier & primary filings
View the 3 government permit PDFs, source filings & MW timeline for Kurri Kurri data centre site (former Hydro Aluminium smelter) - enter work email
Unlock the complete facility dossier for Kurri Kurri data centre site (former Hydro Aluminium smelter) (Kurri Kurri, Australia): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.
More AirTrunk data centers in Australia
- AirTrunk MEL2 Campus
Tullamarine, Australia, planned354 MW - AirTrunk MEL1
Melbourne, Australia, operating185 MW - SYD1 Sydney West
Huntingwood, Australia, operating130 MW - SYD2 Sydney North
Lane Cove West, Australia, operating120 MW - 45 Donnybrook Road, Mickleham data centre campus
Mickleham, Australia, plannedNot recorded - AirTrunk Mickleham data centre campus
Mickleham, Australia, plannedNot recorded
AirTrunk data centers in other countries
- AirTrunk JHB1
Iskandar Puteri, Malaysia, operating150 MW - AirTrunk JHB3
Iskandar Puteri, Malaysia, planned140 MW - AirTrunk JHB4
Iskandar Puteri, Malaysia, planned140 MW - AirTrunk SGP1
Loyang, Changi, Singapore, operating78 MW - AirTrunk SGP2 Loyang
Loyang, Changi, Singapore, under construction70 MW - AirTrunk-ByteDance Singapore DC
Loyang, Changi, Singapore, planned20 MW
Other data centers in Australia
- Tungkillo Compute and Energy Hub
Tungkillo, Australia, planned1.2 GW - Supernode Brendale
Brendale, Australia, under construction800 MW - S7 Eastern Creek
Sydney, Australia, planned550 MW - M3 West Footscray
Melbourne, Australia, operating225 MW - Horsley Park Campus
Sydney, Australia, planned200 MW - CDC Brooklyn Campus One
Melbourne, Australia, under construction155 MW
Full site dossier & Asia-Pacific dataset
Unlock Kurri Kurri data centre site (former Hydro Aluminium smelter) permit PDFs, MW timeline & 563 other data centers
This page is the public summary for Kurri Kurri data centre site (former Hydro Aluminium smelter) in Kurri Kurri, Australia. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.
- Exact parcel coordinates, street address and interactive map pin for Kurri Kurri data centre site (former Hydro Aluminium smelter)
- Phase-by-phase operating vs. planned MW timeline and utility/substation records
- All 3 linked primary sources, government permit PDFs and regulatory filings
- Recorded M&A, lease and financing transactions for AirTrunk in Australia
Instant sign-in with a 6-digit email code or single sign-on. No password required.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Kurri Kurri data centre site (former Hydro Aluminium smelter)?
Kurri Kurri data centre site (former Hydro Aluminium smelter) is recorded under AirTrunk. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Kurri Kurri data centre site (former Hydro Aluminium smelter)?
In Kurri Kurri, Australia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Kurri Kurri data centre site (former Hydro Aluminium smelter) have?
540 MW, as stated by Mingtiandi. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 1 linked page by Mingtiandi. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.