← Asia-Pacific data centers · All sites · India · Chennai
Sourced site record, every fact links to its page
AdaniConneX Chennai 1:data center in Chennai, India.
AdaniConneX Chennai 1 is an operating data center in Chennai, India, listed under AdaniConneX. Capacity is 33 MW according to AdaniConneX. 2024 to 2026 satellite: little change (-3 to +5 pts). Real Assets links 1 source page, including AdaniConneX.
Open this site on the map View the full site recordoperating data center · 1 linked source
- AdaniConneX
- Chennai
- India
Approximate position and India peer sites (the exact position needs sign-in)
Facts on record
- OperatorAdaniConneX
- City and countryChennai, India
- Statusoperating
- Capacity33 MW, as stated by AdaniConneX
- Expected completionNot recorded
- 2024 vs 2026 satelliteLittle roof change, (-3 to +5 pts, 2024 to 2026), 15 January 2024 to 10 November 2026
- Sources linked1 from 1 publisher
- Record updated18 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
India has 117 data centers on record in Real Assets, with 882.6 MW reported as operating and 3.08 GW not yet operating. AdaniConneX Chennai 1 is one of them.
AdaniConneX has 4 data centers on record in Asia-Pacific: 3 operating and 1 planned or under construction. See AdaniConneX in India (4 sites).
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Chennai Data Center | AdaniConneX
AdaniConneX, adaniconnex.comWeb page
1 source on record. Public links open the original pages. How the data is built and what a source line means.
2024 vs 2026 satellite construction check
Comparing clear 10 m satellite passes across 2024 to 2026 (15 January 2024 to 10 November 2026), AdaniConneX Chennai 1 shows little change in roofed area with a roofed-share shift of -3 to +5 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Open 2024 vs 2026 satellite slider · All Asia-Pacific 2024 vs 2026 satellite-tracked sites
More AdaniConneX data centers in India
- AdaniConneX’s Taloja campus
Navi Mumbai, India, planned240 MW - AdaniConneX, Hyderabad
Hyderabad, India, operatingNot recorded - AdaniConneX, Pune
Pune, India, operatingNot recorded
Other data centers in India
- Tootipala data centre campus (1,400 MW)
Anakapalli, India, planned1.4 GW - Trentar Maharashtra Green Hyperscale Data Center Campus
Mumbai, India, planned500 MW - Rambilli data centre campus (400 MW)
Anakapalli, India, planned400 MW - STT GDC India Palava Data Center Campus
Dombivli, India, under construction400 MW - Sify Mumbai 03, Rabale Campus
Navi Mumbai, India, operating96.9 MW - CtrlS Chennai Datacenter Park
Chennai, India, operating72 MW
Full site dossier & Asia-Pacific dataset
Open AdaniConneX Chennai 1 and 703 other data centers
This page is the public summary for AdaniConneX Chennai 1 in Chennai, India. Sign in to see its full record: 1 source page.
- AdaniConneX Chennai 1 on the interactive map, with the sites around it
- All 1 linked source page
Instant sign-in with a 6-digit email code or single sign-on. No password required.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates AdaniConneX Chennai 1?
AdaniConneX Chennai 1 is recorded under AdaniConneX. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is AdaniConneX Chennai 1?
In Chennai, India. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does AdaniConneX Chennai 1 have?
33 MW, as stated by AdaniConneX. Operating capacity today is not recorded.
Is AdaniConneX Chennai 1 under construction or growing on satellite imagery?
Comparing clear 10 m satellite passes across 2024 to 2026 (15 January 2024 to 10 November 2026), AdaniConneX Chennai 1 shows little change in roofed area with a roofed-share shift of -3 to +5 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.
Where does this information come from?
From 1 linked page by AdaniConneX. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.