AnalystAIReal Assets Start the 3-day preview

← Asia-Pacific data centers · All sites · India · Navi Mumbai

Sourced site record, every fact links to its page

Sify Mumbai 03, Rabale Campus:data center in Navi Mumbai, India.

Sify Mumbai 03, Rabale Campus is an operating data center in Navi Mumbai, India, listed under Sify Technologies. Capacity is 96.9 MW according to www.sifytechnologies.com. 2024 to 2026 satellite: 2024 vs 2026 imagery. Real Assets links 3 source pages, including sifytechnologies.com, Sify Technologies.

Open this site on the map View the full site record
Navi Mumbai, IndiaSify Technologies
96.9 MW

operating data center · 3 linked sources

  • Sify Technologies
  • Navi Mumbai
  • India
🔒Exact position and neighboring pins after sign-in · Open the interactive map

Approximate position and India peer sites (the exact position needs sign-in)

Instant code or 1-click sign-in:
96.9 MWcapacity
Operatingstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • OperatorSify Technologies
  • City and countryNavi Mumbai, India
  • Statusoperating
  • Capacity96.9 MW, as stated by www.sifytechnologies.com
  • Expected completionNot recorded
  • 2024 vs 2026 satelliteDated 2024 and 2026 passes, (2024 to 2026), 2 January 2024 to 12 November 2026
  • Sources linked3 from 2 publishers
  • Record updated18 November 2026
  • 2024 vs 2026 satellite curtain slider🔒 Compare before and after
  • Exact location on the map🔒 View on the map

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

India has 117 data centers on record in Real Assets, with 882.6 MW reported as operating and 3.08 GW not yet operating. Sify Mumbai 03, Rabale Campus is one of them.

Sify Technologies has 12 data centers on record in Asia-Pacific: 12 operating and 0 planned or under construction. See Sify Technologies in India (12 sites).

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

3 sources on record; 2 shown above and 1 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.

The full site record

Open Sify Mumbai 03, Rabale Campus's record: 3 source pages - enter work email

Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.

Instant 6-digit code or 1-click work sign-in (no password):

2024 vs 2026 satellite construction check

Dated 10 m satellite passes are stored for Sify Mumbai 03, Rabale Campus (2 January 2024 to 12 November 2026) for before-and-after comparison in the workspace.

Open 2024 vs 2026 satellite slider · All Asia-Pacific 2024 vs 2026 satellite-tracked sites

More Sify Technologies data centers in India

Other data centers in India

Full site dossier & Asia-Pacific dataset

Open Sify Mumbai 03, Rabale Campus and 703 other data centers

This page is the public summary for Sify Mumbai 03, Rabale Campus in Navi Mumbai, India. Sign in to see its full record: 3 source pages.

  • Sify Mumbai 03, Rabale Campus on the interactive map, with the sites around it
  • All 3 linked source pages

or continue in one click

Instant sign-in with a 6-digit email code or single sign-on. No password required.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Sify Mumbai 03, Rabale Campus?

Sify Mumbai 03, Rabale Campus is recorded under Sify Technologies. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Sify Mumbai 03, Rabale Campus?

In Navi Mumbai, India. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Sify Mumbai 03, Rabale Campus have?

96.9 MW, as stated by www.sifytechnologies.com. Operating capacity today is not recorded.

Is Sify Mumbai 03, Rabale Campus under construction or growing on satellite imagery?

Dated 10 m satellite passes are stored for Sify Mumbai 03, Rabale Campus (2 January 2024 to 12 November 2026) for before-and-after comparison in the workspace.

Where does this information come from?

From 3 linked pages by sifytechnologies.com, Sify Technologies. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.