JHB01 Campus:data center in Iskandar Puteri, Malaysia.

JHB01 Campus is a planned data center in Iskandar Puteri, Malaysia, listed under STACK Infrastructure. Planned capacity is 96 MW. Real Assets links 1 source page, including stackinfra.com.

Open this site on the map Start a 7-day trial
Iskandar Puteri, MalaysiaSTACK Infrastructure
96 MW

planned data center · 1 linked source

  • STACK Infrastructure
  • Iskandar Puteri
  • Malaysia
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Malaysia peer sites (exact coordinates require sign-in)

96 MWplanned capacity
Plannedstatus
1source page linked
Not recordedexpected completion

Facts on record

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Malaysia has 50 data centers on record in Real Assets, with 2.17 GW reported as operating and 2.21 GW not yet operating. JHB01 Campus is one of them.

STACK Infrastructure has 4 data centers on record in Asia-Pacific: 4 operating and 0 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 30 October 2026; this page was built on 30 October 2026 at 12:11 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.

STACK Infrastructure data centers in other countries

Other data centers in Malaysia

Full market dataset & site-level records

Open JHB01 Campus and 623 other data centers

This page is the public summary. Start a 7-day trial or sign in to see JHB01 Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (https://realassets.analystai.ai/mcp)

or continue in one click

Instant sign-in with a 6-digit email code or single sign-on. No password required.

Questions

Who operates JHB01 Campus?

JHB01 Campus is recorded under STACK Infrastructure. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is JHB01 Campus?

In Iskandar Puteri, Malaysia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does JHB01 Campus have?

96 MW. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by stackinfra.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.