AnalystAIReal Assets Start free trial

← Asia-Pacific data centers · All cities · Malaysia · All sites

City market record, every site links to its sources

Iskandar Puteri, Malaysia:13 data centers, 1.08 GW operating.

As of 30 October 2026, Real Assets records 13 published data centers in Iskandar Puteri, Malaysia: 4 operating and 9 planned or under construction. Reported capacity: 1.08 GW operating, 544 MW planned or under construction across 8 of 13 sites. Top operators by sites in Iskandar Puteri: AirTrunk (3), AirTrunk Malaysia Sdn. Bhd. (1), DayOne (1).

Open Iskandar Puteri on the map Start a 7-day trial
Iskandar Puteri, MalaysiaAsia-Pacific data centers
13

4 operating · 9 planned · 11 operators

  • AirTrunk (3)
  • AirTrunk Malaysia Sdn. Bhd. (1)
  • DayOne (1)
🔒Pin details & exact coordinates locked · Unlock Iskandar Puteri map

Mapped Iskandar Puteri and Malaysia site positions (exact coordinates require sign-in)

13sites tracked in Iskandar Puteri
4operating
9planned or under construction
1.08 GWcapacity operating

Operators in Iskandar Puteri

11 named operators across 13 sites in Iskandar Puteri.

Other data center cities in Malaysia

  • Cyberjaya
    Malaysia · 8 operating, 4 planned · 122.3 MW operating · 308 MW planned
    12 sites
  • Kulai
    Malaysia · 6 operating, 2 planned · 606 MW operating · 500 MW planned
    8 sites
  • Kuala Lumpur
    Malaysia · 7 operating, 0 planned · 56.4 MW operating
    7 sites
  • Petaling Jaya
    Malaysia · 3 operating, 0 planned · 65 MW operating
    3 sites

All 48 Asia-Pacific data center cities

All 13 data centers in Iskandar Puteri, Malaysia

Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.

Full market dataset & site-level records

Unlock all 13 Iskandar Puteri data centers on the interactive map

This page summarizes the 13 published data centers in Iskandar Puteri, Malaysia. Sign in or start a 7-day trial to inspect exact map coordinates, power and area figures, ownership records and source documents.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (https://realassets.analystai.ai/mcp)

or continue in one click

Instant sign-in with a 6-digit email code or single sign-on. No password required.

Questions

How many data centers are tracked in Iskandar Puteri?

13 published data centers in Iskandar Puteri, Malaysia as of 30 October 2026: 4 operating and 9 planned or under construction. Counts reflect sourced facilities recorded in Real Assets, not a full census.

Which operators run data centers in Iskandar Puteri?

Named operators in Iskandar Puteri by sites tracked: AirTrunk (3), AirTrunk Malaysia Sdn. Bhd. (1), DayOne (1), Digital Halo (1), Empyrion Digital (1), Equalbase (1).

How much capacity is reported in Iskandar Puteri?

Reported capacity: 1.08 GW operating, 544 MW planned or under construction across 8 of 13 sites.

Where do the Iskandar Puteri figures come from?

Every site listed on this page links to its individual facility record and the original company pages, regulatory filings and press releases that published its facts.