← Asia-Pacific data centers · All sites · Malaysia
Sourced site record, every fact links to its page
JHB2:data center in Iskandar Puteri, Malaysia.
JHB2 is an operating data center in Iskandar Puteri, Malaysia, listed under AirTrunk. Capacity is 270 MW. Real Assets links 7 source pages, including airtrunk.com.
Open this site on the map Start a 7-day trialFacts on record
- OperatorAirTrunk
- City and countryIskandar Puteri, Malaysia
- Statusoperating
- Capacity270 MW
- Expected completionNot recorded
- Sources linked7 from 1 publisher
- Record updated29 October 2026
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Malaysia has 117 data centers on record in Real Assets, with 2.81 GW reported as operating and 1.71 GW not yet operating. JHB2 is one of them.
AirTrunk has 20 data centers on record in Asia-Pacific: 9 operating and 11 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 30 October 2026; this page was built on 30 October 2026 at 08:14 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- airtrunk.com
airtrunk.comWeb page - JHB2 Johor Bahru | AirTrunk
airtrunk.comWeb page
7 sources on record; the 2 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.
AirTrunk data centers in other countries
- AirTrunk MEL2 Campus
Melbourne, Australia, planned354 MW - SYD3 Sydney West
Huntingwood, Australia, under construction320 MW
Other data centers in Malaysia
- GDS Nusajaya Tech Park Data Center Campus
Johor, Malaysia, operating662 MW - DayOne Kempas
Johor Bahru, Malaysia, operating590.4 MW - YTL Green Data Centre Park
Kulai, Malaysia, under construction500 MW - Bridge Data Centre (Johor)
Johor, Malaysia, operating315 MW - Vantage Data Centers data center campus - Johor
Johor, Malaysia, operating300 MW - Vantage JHB1
Sedenak Tech Park, Malaysia, operating300 MW
Full market dataset & site-level records
Open JHB2 and 21 other data centers
This page is the public summary. Start a 7-day trial or sign in to see JHB2 on the map with its exact location, every sourced figure and the filings behind it.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
Instant sign-in with a 6-digit email code or single sign-on. No password required.
Questions
Who operates JHB2?
JHB2 is recorded under AirTrunk. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is JHB2?
In Iskandar Puteri, Malaysia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does JHB2 have?
270 MW. Operating capacity today is not recorded.
Where does this information come from?
From 7 linked pages by airtrunk.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.