← Asia-Pacific data centers · All sites · Malaysia · Iskandar Puteri
Sourced site record, every fact links to its page
Nusa Cemerlang Industrial Park site:data center in Iskandar Puteri, Malaysia.
Nusa Cemerlang Industrial Park site is a planned data center in Iskandar Puteri, Malaysia, listed under Microsoft. Planned capacity is 64 MW. Real Assets links 5 source pages, including KrASIA, The Business Times.
Open this site on the map Start a 7-day trialplanned data center · 5 linked sources
- Microsoft
- Iskandar Puteri
- Malaysia
Approximate metro position & Malaysia peer sites (exact coordinates require sign-in)
Facts on record
- OperatorMicrosoft
- City and countryIskandar Puteri, Malaysia
- Statusplanned
- Planned capacity64 MW
- Expected completionNot recorded
- Sources linked5 from 2 publishers
- Record updated30 October 2026
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Malaysia has 50 data centers on record in Real Assets, with 2.17 GW reported as operating and 2.21 GW not yet operating. Nusa Cemerlang Industrial Park site is one of them.
Microsoft has 16 data centers on record in Asia-Pacific: 7 operating and 9 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 30 October 2026; this page was built on 30 October 2026 at 12:11 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Malaysia's data center boom: An inside look at Asia's battle for AI supremacy
KrASIA, kr-asia.com, published 6 January 2026Web page - Microsoft launches second cloud region in Johor Bahru, boosting Malaysia data-centre development
The Business Times, businesstimes.com.sg, published 4 November 2025Web page
5 sources on record; the 2 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.
More Microsoft data centers in Malaysia
- Eco Business Park I site
Johor Bahru, Malaysia, plannedNot recorded - Microsoft Data Centre - Eco Business Park VI
Senai, Malaysia, plannedNot recorded
Microsoft data centers in other countries
- Microsoft Kemps Creek
Sydney, Australia, under construction190 MW - Australia Southeast
Melbourne, Australia, operating144 MW - Australia East
Sydney, Australia, operating96 MW - Microsoft Singapore Data Center
Jurong, Tuas, Singapore, planned20 MW - Australia Central
Canberra, Australia, operatingNot recorded - Japan West region
Osaka, Japan, operatingNot recorded
Other data centers in Malaysia
- GDS Nusajaya Tech Park Data Center Campus
Iskandar Puteri, Malaysia, operating662 MW - DayOne Kempas
Johor Bahru, Malaysia, operating590.4 MW - Mah Sing DC Hub@ Southville City
Bangi, Malaysia, planned500 MW - YTL Green Data Centre Park
Kulai, Malaysia, under construction500 MW - Vantage JHB1
Kulai, Malaysia, operating300 MW - JHB2
Iskandar Puteri, Malaysia, operating270 MW
Full market dataset & site-level records
Open Nusa Cemerlang Industrial Park site and 623 other data centers
This page is the public summary. Start a 7-day trial or sign in to see Nusa Cemerlang Industrial Park site on the map with its exact location, every sourced figure and the filings behind it.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
Instant sign-in with a 6-digit email code or single sign-on. No password required.
Questions
Who operates Nusa Cemerlang Industrial Park site?
Nusa Cemerlang Industrial Park site is recorded under Microsoft. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Nusa Cemerlang Industrial Park site?
In Iskandar Puteri, Malaysia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Nusa Cemerlang Industrial Park site have?
64 MW. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 5 linked pages by KrASIA, The Business Times. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.