← Asia-Pacific data centers · All sites · Indonesia · Bekasi
Sourced site record, every fact links to its page
STT GDC West Java Campus:data center in Bekasi, Indonesia.
STT GDC West Java Campus is an under construction data center in Bekasi, Indonesia, listed under ST Telemedia Global Data Centres (STT GDC). Planned capacity is 72 MW. Real Assets links 2 source pages, including mingtiandi.com, sttgdc.com.
Open this site on the map Start a 7-day trialunder construction data center · 2 linked sources
- ST Telemedia Global Data Centres (STT GDC)
- Bekasi
- Indonesia
Approximate metro position & Indonesia peer sites (exact coordinates require sign-in)
Facts on record
- OperatorST Telemedia Global Data Centres (STT GDC)
- City and countryBekasi, Indonesia
- Statusunder construction
- Planned capacity72 MW
- Expected completionNot recorded
- Sources linked2 from 2 publishers
- Record updated30 October 2026
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Indonesia has 20 data centers on record in Real Assets, with 122 MW reported as operating and 724 MW not yet operating. STT GDC West Java Campus is one of them.
ST Telemedia Global Data Centres (STT GDC) has 13 data centers on record in Asia-Pacific: 6 operating and 7 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 30 October 2026; this page was built on 30 October 2026 at 12:11 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- mingtiandi.com
mingtiandi.comWeb page - STT GDC Accelerates Jakarta Campus Expansion to Power Indonesia’s AI and Digital Ambitions | STTGDC
www.sttgdc.comWeb page
2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
ST Telemedia Global Data Centres (STT GDC) data centers in other countries
- STT GDC India Palava Data Center Campus
Dombivli, India, under construction400 MW - STT GDC Metro Manila Campus
Quezon City, Philippines, under construction124 MW - STT GDC Johor Data Center
Iskandar Puteri, Malaysia, under construction120 MW - STT VNG Ho Chi Minh City 2
Ho Chi Minh City, Vietnam, planned60 MW - STT Kuala Lumpur 1
Cyberjaya, Malaysia, operating16.5 MW - STT MediaHub
Pasir Panjang, Hong Leong Garden, Clementi New Town, Singapore, operating16.3 MW
Other data centers in Indonesia
- PDG JC4 Campus
Bekasi, Indonesia, under construction240 MW - Batam AI Factory
Batam, Indonesia, under construction120 MW - JC3
Bekasi, Indonesia, under construction120 MW - Oracle Indonesia North Cloud Region (DayOne Nongsa Digital Park)
Batam, Indonesia, operating94 MW - DayOne Batam Campus
Batam, Indonesia, under construction72 MW - NeutraDC Nxera Batam
Batam, Indonesia, under construction60 MW
Full market dataset & site-level records
Open STT GDC West Java Campus and 623 other data centers
This page is the public summary. Start a 7-day trial or sign in to see STT GDC West Java Campus on the map with its exact location, every sourced figure and the filings behind it.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
Instant sign-in with a 6-digit email code or single sign-on. No password required.
Questions
Who operates STT GDC West Java Campus?
STT GDC West Java Campus is recorded under ST Telemedia Global Data Centres (STT GDC). The operator is the name its sources give, which can differ from the owner or the tenant.
Where is STT GDC West Java Campus?
In Bekasi, Indonesia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does STT GDC West Java Campus have?
72 MW. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 2 linked pages by mingtiandi.com, sttgdc.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.