AnalystAIReal Assets Start free trial

← Asia-Pacific data centers · All sites · Indonesia · Bekasi

Sourced site record, every fact links to its page

Digital Edge CGK Campus:data center in Bekasi, Indonesia.

Digital Edge CGK Campus is an under construction data center in Bekasi, Indonesia, listed under Digital Edge. Planned capacity is 500 MW according to Cushman & Wakefield. Real Assets links 2 source pages, including Cushman & Wakefield, Cushman & Wakefield - Asia Pacific Data Centre H1 2026 Update (Feb 2026).

Open this site on the map View permit PDFs & MW timeline
Bekasi, IndonesiaDigital Edge
500 MW

under construction data center · 2 linked sources

  • Digital Edge
  • Bekasi
  • Indonesia
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Indonesia peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
500 MWplanned capacity
Under constructionstatus
2source pages linked
Not recordedexpected completion

Facts on record

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Indonesia has 58 data centers on record in Real Assets, with 516 MW reported as operating and 2.06 GW not yet operating. Digital Edge CGK Campus is one of them.

Digital Edge has 7 data centers on record in Asia-Pacific: 5 operating and 2 planned or under construction. See Digital Edge in Indonesia (3 sites).

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

  • Asia Pacific Data Centre H1 2026 Update
    Cushman & Wakefield, cushmanwakefield.com, published 15 February 2026
    PDF
  • digitaledgedc.com
    Cushman & Wakefield - Asia Pacific Data Centre H1 2026 Update (Feb 2026), digitaledgedc.com
    Web page
  • Government permit PDFs, regulatory filings & municipal zoning records (Bekasi, Indonesia)
    Air/water permits, substation filings, tax abatements & site plans
    🔒 Permit PDFs
  • Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
    Audited facility timeline and transaction history for Digital Edge CGK Campus
    🔒 MW timeline

2 sources on record. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 3 government permit PDFs, source filings & MW timeline for Digital Edge CGK Campus - enter work email

Unlock the complete facility dossier for Digital Edge CGK Campus (Bekasi, Indonesia): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

More Digital Edge data centers in Indonesia

Digital Edge data centers in other countries

Other data centers in Indonesia

Full site dossier & Asia-Pacific dataset

Unlock Digital Edge CGK Campus permit PDFs, MW timeline & 563 other data centers

This page is the public summary for Digital Edge CGK Campus in Bekasi, Indonesia. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for Digital Edge CGK Campus
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 3 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for Digital Edge in Indonesia

or continue in one click

Instant sign-in with a 6-digit email code or single sign-on. No password required.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Digital Edge CGK Campus?

Digital Edge CGK Campus is recorded under Digital Edge. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Digital Edge CGK Campus?

In Bekasi, Indonesia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Digital Edge CGK Campus have?

500 MW, as stated by Cushman & Wakefield. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 2 linked pages by Cushman & Wakefield, Cushman & Wakefield - Asia Pacific Data Centre H1 2026 Update (Feb 2026). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.