AnalystAIReal Assets Start the 3-day preview

← United States data centers · All sites · Virginia · Sterling

Sourced site record, every fact links to its page

CyrusOne NVA5:data center in Sterling, Virginia.

CyrusOne NVA5 is an operating data center in Sterling, Virginia, listed under CyrusOne. Capacity is not recorded. 2024 to 2026 satellite: little change (-8 to 0 pts). Real Assets links 3 source pages, including CyrusOne.

Open this site on the map View the full site record
Sterling, VirginiaCyrusOne
Operating

operating data center · 3 linked sources

  • CyrusOne
  • Sterling
  • Virginia
🔒Exact position and neighboring pins after sign-in · Open the interactive map

Approximate position and Virginia peer sites (the exact position needs sign-in)

Instant code or 1-click sign-in:
Not recordedcapacity
Operatingstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • OperatorCyrusOne
  • City and stateSterling, Virginia
  • Statusoperating
  • CapacityNot recorded
  • Expected completionNot recorded
  • 2024 vs 2026 satelliteLittle roof change, (-8 to 0 pts, 2024 to 2026), 5 January 2024 to 10 November 2026
  • Sources linked3 from 1 publisher
  • Record updated18 November 2026
  • 2024 vs 2026 satellite curtain slider🔒 Compare before and after
  • Exact location on the map🔒 View on the map

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Virginia has 199 data centers on record in Real Assets, with 3 GW reported as operating and 23.5 GW not yet operating. CyrusOne NVA5 is one of them.

CyrusOne has 57 data centers on record in the United States: 42 operating and 15 planned or under construction. See CyrusOne in Virginia (7 sites). Compare Digital Realty vs CyrusOne.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 13:45 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

3 sources on record; 2 shown above and 1 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.

The full site record

Open CyrusOne NVA5's record: 3 source pages - enter work email

Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.

Instant 6-digit code or 1-click work sign-in (no password):

2024 vs 2026 satellite construction check

Comparing clear 10 m satellite passes across 2024 to 2026 (5 January 2024 to 10 November 2026), CyrusOne NVA5 shows little change in roofed area with a roofed-share shift of -8 to 0 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.

Open 2024 vs 2026 satellite slider · All United States 2024 vs 2026 satellite-tracked sites

More CyrusOne data centers in Virginia

CyrusOne data centers in other states

Other data centers in Virginia

Full site dossier & United States dataset

Open CyrusOne NVA5 and 1,276 other data centers

This page is the public summary for CyrusOne NVA5 in Sterling, Virginia. Sign in to see its full record: 3 source pages.

  • CyrusOne NVA5 on the interactive map, with the sites around it
  • All 3 linked source pages

or continue in one click

A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates CyrusOne NVA5?

CyrusOne NVA5 is recorded under CyrusOne. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is CyrusOne NVA5?

In Sterling, Virginia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does CyrusOne NVA5 have?

No capacity figure is recorded for this site. Real Assets does not estimate one.

Is CyrusOne NVA5 under construction or growing on satellite imagery?

Comparing clear 10 m satellite passes across 2024 to 2026 (5 January 2024 to 10 November 2026), CyrusOne NVA5 shows little change in roofed area with a roofed-share shift of -8 to 0 pts. Exact roof coverage levels are held back; the interactive 2024 vs 2026 before-and-after curtain slider is available in the workspace.

Where does this information come from?

From 3 linked pages by CyrusOne. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.