← United States data centers · All sites · Virginia
Sourced site record, every fact links to its page
Mattameade Tech Campus:data center in Woodford, Virginia.
Mattameade Tech Campus is a planned data center in Woodford, Virginia, listed under Amazon. Planned capacity is 770 MW according to Data Center Dynamics. Real Assets links 1 source page, including Data Center Dynamics.
Open this site on the map View the full site recordplanned data center · 1 linked source
- Amazon
- Woodford
- Virginia
Approximate position and Virginia peer sites (the exact position needs sign-in)
Facts on record
- OperatorAmazon
- City and stateWoodford, Virginia
- Statusplanned
- Planned capacity770 MW, as stated by Data Center Dynamics
- Expected completion2027
- Sources linked1 from 1 publisher
- Record updated20 November 2026
- Exact location on the map🔒 View on the map
- Sourced figures, each with its page and quote🔒 4 figures
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Virginia has 199 data centers on record in Real Assets, with 3 GW reported as operating and 23.5 GW not yet operating. Mattameade Tech Campus is one of them.
Amazon has 42 data centers on record in the United States: 12 operating and 29 planned or under construction. See Amazon in Virginia (14 sites).
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 13:45 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Amazon requests permit for 11-building data center campus in Caroline County, Virginia - DCD
Data Center Dynamics, datacenterdynamics.com, published 18 September 2026Web page
1 source on record. Public links open the original pages. How the data is built and what a source line means.
The full site record
Open Mattameade Tech Campus's record: 1 source page and 4 sourced figures - enter work email
Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.
More Amazon data centers in Virginia
- Amazon AWS IAD - Massaponax Church Rd
Carters Store, Virginia, planned450 MW - Amazon AWS IAD - Wellington Glen Tech Park
Manassas, Virginia, planned200 MW - Amazon AWS IAD - 24234 Quail
Aldie, Virginia, under constructionNot recorded - Amazon's Ashton Ave Project
Virginia, Virginia, plannedNot recorded - AWS Haymarket Data Center
Haymarket, Virginia, operatingNot recorded - AWS Loudoun County Mega-Cluster
Sterling, Virginia, operatingNot recorded
Amazon data centers in other states
- AWS Hobart Data Center Campus
Hobart, Indiana, planned2.4 GW - Amazon AWS Project Rainier AI Mega-Campus
New Carlisle, Indiana, operating2.25 GW - Amazon AWS Madison County Mega-Campus
Canton, Mississippi, operating2.2 GW - Amazon Ridgeland
Ridgeland, Mississippi, operating1.01 GW - Amazon, Trenton
Trenton, Ohio, planned1 GW - Pecos County Data Center at GW Ranch
Fort Stockton, Texas, planned1 GW
Other data centers in Virginia
- Hanover Technology Park
Ashland, Virginia, planned2.4 GW - West Creek Business Park
Goochland County, Virginia, planned1.2 GW - CleanArc VA1 Campus
Ruther Glen, Virginia, under construction900 MW - Tuckahoe Technology Park
Goochland County, Virginia, planned900 MW - PowerHouse 95 Spotsylvania Mega-Campus
Thornburg, Virginia, planned800 MW - STACK Infrastructure NVA02
Manassas, Virginia, operating487 MW
Full site dossier & United States dataset
Open Mattameade Tech Campus and 1,276 other data centers
This page is the public summary for Mattameade Tech Campus in Woodford, Virginia. Sign in to see its full record: 1 source page and 4 sourced figures.
- Mattameade Tech Campus on the interactive map, with the sites around it
- All 1 linked source page
- 4 sourced figures, each with its page and quote
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Mattameade Tech Campus?
Mattameade Tech Campus is recorded under Amazon. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Mattameade Tech Campus?
In Woodford, Virginia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Mattameade Tech Campus have?
770 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 1 linked page by Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.