← United States data centers · All sites · Virginia · Sterling
Sourced site record, every fact links to its page
AWS Loudoun County Mega-Cluster:data center in Sterling, Virginia.
AWS Loudoun County Mega-Cluster is an operating data center in Sterling, Virginia, listed under Amazon. Capacity is not recorded. Real Assets links 1 source page, including Baxtel.
Open this site on the map View the full site recordoperating data center · 1 linked source
- Amazon
- Sterling
- Virginia
Approximate position and Virginia peer sites (the exact position needs sign-in)
Facts on record
- OperatorAmazon
- City and stateSterling, Virginia
- Statusoperating
- CapacityNot recorded
- Expected completionNot recorded
- Sources linked1 from 1 publisher
- Record updated17 November 2026
- Exact location on the map🔒 View on the map
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Virginia has 199 data centers on record in Real Assets, with 3 GW reported as operating and 23.5 GW not yet operating. AWS Loudoun County Mega-Cluster is one of them.
Amazon has 42 data centers on record in the United States: 12 operating and 29 planned or under construction. See Amazon in Virginia (14 sites).
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 13:45 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Amazon Data Center Locations (AWS)
Baxtel, baxtel.comWeb page
1 source on record. Public links open the original pages. How the data is built and what a source line means.
More Amazon data centers in Virginia
- Mattameade Tech Campus
Woodford, Virginia, planned770 MW - Amazon AWS IAD - Massaponax Church Rd
Carters Store, Virginia, planned450 MW - Amazon AWS IAD - Wellington Glen Tech Park
Manassas, Virginia, planned200 MW - Amazon AWS IAD - 24234 Quail
Aldie, Virginia, under constructionNot recorded - Amazon's Ashton Ave Project
Virginia, Virginia, plannedNot recorded - AWS Haymarket Data Center
Haymarket, Virginia, operatingNot recorded
Amazon data centers in other states
- AWS Hobart Data Center Campus
Hobart, Indiana, planned2.4 GW - Amazon AWS Project Rainier AI Mega-Campus
New Carlisle, Indiana, operating2.25 GW - Amazon AWS Madison County Mega-Campus
Canton, Mississippi, operating2.2 GW - Amazon Ridgeland
Ridgeland, Mississippi, operating1.01 GW - Amazon, Trenton
Trenton, Ohio, planned1 GW - Pecos County Data Center at GW Ranch
Fort Stockton, Texas, planned1 GW
Other data centers in Virginia
- Hanover Technology Park
Ashland, Virginia, planned2.4 GW - West Creek Business Park
Goochland County, Virginia, planned1.2 GW - CleanArc VA1 Campus
Ruther Glen, Virginia, under construction900 MW - Tuckahoe Technology Park
Goochland County, Virginia, planned900 MW - PowerHouse 95 Spotsylvania Mega-Campus
Thornburg, Virginia, planned800 MW - STACK Infrastructure NVA02
Manassas, Virginia, operating487 MW
Full site dossier & United States dataset
Open AWS Loudoun County Mega-Cluster and 1,276 other data centers
This page is the public summary for AWS Loudoun County Mega-Cluster in Sterling, Virginia. Sign in to see its full record: 1 source page.
- AWS Loudoun County Mega-Cluster on the interactive map, with the sites around it
- All 1 linked source page
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates AWS Loudoun County Mega-Cluster?
AWS Loudoun County Mega-Cluster is recorded under Amazon. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is AWS Loudoun County Mega-Cluster?
In Sterling, Virginia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does AWS Loudoun County Mega-Cluster have?
No capacity figure is recorded for this site. Real Assets does not estimate one.
Where does this information come from?
From 1 linked page by Baxtel. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.