← United States data centers · Amazon (34) · Virginia (128)
Live market record, the source behind every published figure
Amazon in Virginia:13 data center sites.
As of 30 October 2026, Real Assets tracks 13 data center sites listed under Amazon in Virginia: 2 operating and 10 planned or under construction. Reported power capacity in Virginia: 7.8 GW not yet operating. Virginia accounts for 38% of Amazon's 34 tracked sites in the United States, and Amazon accounts for 10% of the 128 tracked sites in Virginia.
Unlock all 13 Amazon sites in Virginia2 operating · 10 planned · 10% of Virginia
- 38% of Amazon in United States
- #2 in Virginia
Mapped Amazon sites in Virginia (highlighted) against all Virginia sites
Amazon across United States
- Virginia13
- Mississippi5
- Georgia2
- Indiana2
- Ohio2
- View all 34 Amazon sites in United States →
Top operators in Virginia
Amazon in Virginia: 15 data centers with their own page
- North Creek Tech Campus
Louisa, planned2.7 GW - Birchwood AWS
King George, planned2.18 GW - Wilderness Crossing
Orange, planned1.5 GW - Mattameade Tech Campus
Spotsylvania, planned770 MW - Amazon AWS IAD - Massaponax Church Rd
Carters Store, planned450 MW - Amazon AWS IAD - 24234 Quail
Aldie, under construction250 MW - Amazon AWS IAD - Wellington Glen Tech Park
Manassas, planned200 MW - Amazon's Ashton Ave Project
Virginia, plannedNot recorded - AWS Haymarket Data Center
Haymarket, operatingNot recorded - AWS Loudoun County Mega-Cluster
Sterling / Ashburn, operatingNot recorded
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded. All 829 sites
Amazon: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for Amazon, with disclosed capital expenditure, lease commitments and capacity figures.
- Amazon 2025 Annual Report on Form 10-K (10-K · FY 2025 · filed 31 December 2025)
Amazon FY 2025 Form 10-K (Note 4 & Segment Disclosures): AWS property and equipment additions (including finance leases) reached $96.50 billion in 2025 (up from $53.27 billion in 2024 and $24.84 billion in 2023), out of $142.35 billion in consolidated capital additions. As of December 31, 2025, the AWS segment comprised 28.4 million leased square feet and 28.5 million owned square feet (excluding corporate facilities), backed by approximately 200 million megawatt-hours of long-term contracted energy (16-year weighted-average remaining duration).10-K ↗ - Amazon.com, Inc. FY 2024 Form 10-K Annual Report (AWS Data Center CapEx & Leased/Owned Square Footage) (10-K · FY 2024 · filed 7 February 2025)
Discloses $83.0B in total FY 2024 property and equipment additions driven by AWS AI and cloud infrastructure, 49.7M sq ft of owned and 26.4M sq ft of leased AWS data center facilities globally, and multi-gigawatt nuclear and renewable power agreements across Virginia, Ohio, Pennsylvania, Oregon, and Mississippi.10-K ↗ - Unlock all Amazon filings and extracted figures →
Full market dataset & site-level records
Unlock all 13 Amazon data center sites in Virginia
Inspect every Amazon facility in Virginia on the interactive map, with site-by-site capacity, status, and primary source links.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 30 October 2026; this page was built on 30 October 2026 at 14:06 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does Amazon have in Virginia?
13 tracked as of 30 October 2026: 2 operating and 10 planned or under construction. That is 38% of Amazon's 34 tracked sites in the United States.
How much power capacity does Amazon have in Virginia?
Reported power capacity in Virginia: 7.8 GW not yet operating.
How does Amazon rank among data center operators in Virginia?
Amazon ranks number 2 in Virginia by sites tracked, with 13 of the 128 sites recorded in Virginia (10%).
Where else does Amazon operate in the United States?
Amazon has 34 tracked sites across the United States: Virginia (13), Mississippi (5), Georgia (2), Indiana (2), Ohio (2).
Where does the data come from?
Figures link to the page that published them. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data