← United States data centers · All sites · Ohio
Sourced site record, every fact links to its page
Amazon data centre campus, Trenton:data center in Trenton, Ohio.
Amazon data centre campus, Trenton is a planned data center in Trenton, Ohio, listed under Amazon. Planned capacity is 1 GW according to Capacity. Real Assets links 1 source page, including Capacity.
Open this site on the map View permit PDFs & MW timelineplanned data center · 1 linked source
- Amazon
- Trenton
- Ohio
Approximate metro position & Ohio peer sites (exact coordinates require sign-in)
Facts on record
- OperatorAmazon
- City and stateTrenton, Ohio
- Statusplanned
- Planned capacity1 GW, as stated by Capacity
- Expected completionNot recorded
- Sources linked1 from 1 publisher
- Record updated7 November 2026
- Exact parcel coordinates & street address🔒 View on parcel map
- Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
- Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Ohio has 56 data centers on record in Real Assets, with 1.68 GW reported as operating and 18.23 GW not yet operating. Amazon data centre campus, Trenton is one of them.
Amazon has 41 data centers on record in the United States: 12 operating and 28 planned or under construction. See Amazon in Ohio (3 sites).
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- 33 data centre curbs pass as US midterms turn the AI buildout into a political liability - Capacitylinkedintwitterinstagram
Capacity, capacityglobal.com, published 4 November 2026Web page - Government permit PDFs, regulatory filings & municipal zoning records (Trenton, Ohio)
Air/water permits, substation filings, tax abatements & site plans🔒 Permit PDFs - Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
Audited facility timeline and transaction history for Amazon data centre campus, Trenton🔒 MW timeline
1 source on record. Public links open the original pages. How the data is built and what a source line means.
Locked site dossier & primary filings
View the 3 government permit PDFs, source filings & MW timeline for Amazon data centre campus, Trenton - enter work email
Unlock the complete facility dossier for Amazon data centre campus, Trenton (Trenton, Ohio): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.
More Amazon data centers in Ohio
- AWS New Albany Cloud Campus
New Albany, Ohio, operating400 MW - AWS Hilliard Cloud Campus
Hilliard, Ohio, operatingNot recorded
Amazon data centers in other states
- AWS Hobart Data Center Campus
Hobart, Indiana, planned2.4 GW - Amazon AWS Project Rainier AI Mega-Campus
New Carlisle, Indiana, operating2.25 GW - Amazon AWS Madison County Mega-Campus
Canton, Mississippi, operating2.2 GW - Birchwood AWS
King George, Virginia, planned2.18 GW - Amazon AWS Canton Campus
Canton, Mississippi, operating1.03 GW - Amazon Ridgeland
Ridgeland, Mississippi, operating1.01 GW
Other data centers in Ohio
- PORTS Technology Campus
Piketon, Ohio, planned10 GW - Meta Prometheus
New Albany, Ohio, operating1 GW - Cologix Johnstown Campus
Johnstown, Ohio, planned800 MW - Vantage Millersport Campus
Fairfield, Ohio, under construction800 MW - Stargate Lordstown
Lordstown, Ohio, under construction750 MW - Bitdeer Clarington
Clarington, Ohio, planned570 MW
Full site dossier & United States dataset
Unlock Amazon data centre campus, Trenton permit PDFs, MW timeline & 1,304 other data centers
This page is the public summary for Amazon data centre campus, Trenton in Trenton, Ohio. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.
- Exact parcel coordinates, street address and interactive map pin for Amazon data centre campus, Trenton
- Phase-by-phase operating vs. planned MW timeline and utility/substation records
- All 3 linked primary sources, government permit PDFs and regulatory filings
- Recorded M&A, lease and financing transactions for Amazon in Ohio
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Amazon data centre campus, Trenton?
Amazon data centre campus, Trenton is recorded under Amazon. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Amazon data centre campus, Trenton?
In Trenton, Ohio. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Amazon data centre campus, Trenton have?
1 GW, as stated by Capacity. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 1 linked page by Capacity. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.