← United States data centers · Amazon (41) · Ohio (56)
Live market record, the source behind every published figure
Amazon in Ohio:3 data center sites.
As of 11 November 2026, Real Assets tracks 3 data center sites listed under Amazon in Ohio: 2 operating and 1 planned or under construction. Reported power capacity in Ohio: 213 MW operating, 1.2 GW not yet operating. Ohio accounts for 7% of Amazon's 41 tracked sites in the United States, and Amazon accounts for 5% of the 56 tracked sites in Ohio.
Unlock all 3 Amazon sites in Ohio2 operating · 1 planned · 5% of Ohio
- 7% of Amazon in United States
- 213 MW operating
- #6 in Ohio
Mapped Amazon sites in Ohio (highlighted) against all Ohio sites
Amazon across United States
- Virginia14
- Mississippi5
- North Carolina3
- Ohio3
- Georgia2
- View all 41 Amazon sites in United States →
Top operators in Ohio
Amazon in Ohio: 3 data centers with their own page
- Amazon data centre campus, Trenton
Trenton, planned1 GW - AWS New Albany Cloud Campus
New Albany, operating400 MW - AWS Hilliard Cloud Campus
Hilliard, operatingNot recorded
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.
Locked regional footprint & primary filings
View all 3 Amazon sites in Ohio, government permit PDFs & MW timeline - enter work email
Unlock every Amazon facility in Ohio on the interactive map with exact parcel coordinates, operating vs. planned MW by phase, and primary regulatory filings.
Amazon: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for Amazon, with disclosed capital expenditure, lease commitments and capacity figures.
- Amazon Form 10-Q (Q3 2026) (10-Q · Q3 2026 · filed 30 September 2026)
Amazon (Amazon Form 10-Q (Q3 2026)) reported in its financial statements: Capex: $77,259 USD (millions) (Q3 2026), Portfolio Value: $508,862 USD (millions) (2026-09-30), Gross Revenue: $ 201,944 USD (millions) (Q3 2026), Ebitda: $28,076 USD (millions) (Q3 2026), Net Income: $20,685 USD (millions) (Q3 2026).10-Q ↗ - Amazon Form 8-K, filed 2026-10-29 (8-K · filed 29 October 2026)8-K ↗
- Amazon Q3 2026 earnings call transcript (Earnings call transcript · Q3 2026 · filed 29 October 2026)Earnings call transcript ↗
- Amazon Form 8-K, filed 2026-09-14 (8-K · filed 14 September 2026)8-K ↗
- Amazon Form 424B5, filed 2026-09-11 (424B5 · filed 11 September 2026)424B5 ↗
- Amazon Form 424B5, filed 2026-09-09 (424B5 · filed 9 September 2026)424B5 ↗
- Unlock all Amazon filings and extracted figures →
Full market dataset & site-level records
Unlock all 3 Amazon data center sites in Ohio
Inspect every Amazon facility in Ohio on the interactive map, with site-by-site capacity, status, and primary source links.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does Amazon have in Ohio?
3 tracked as of 11 November 2026: 2 operating and 1 planned or under construction. That is 7% of Amazon's 41 tracked sites in the United States.
How much power capacity does Amazon have in Ohio?
Reported power capacity in Ohio: 213 MW operating, 1.2 GW not yet operating.
How does Amazon rank among data center operators in Ohio?
Amazon ranks number 6 in Ohio by sites tracked, with 3 of the 56 sites recorded in Ohio (5%).
Where else does Amazon operate in the United States?
Amazon has 41 tracked sites across the United States: Virginia (14), Mississippi (5), North Carolina (3), Ohio (3), Georgia (2).
Where does the data come from?
Figures link to the page that published them. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data