EdgeConneX Ashville Data Center:data center in Pickaway, Ohio.

EdgeConneX Ashville Data Center is a planned data center in Pickaway, Ohio, listed under EdgeConneX. Planned capacity is 197 MW. Real Assets links 3 source pages, including ABC 6 On Your Side (WSYX), Data Center Dynamics, EdgeConneX (PowerConneX Ashville Energy Center project page).

Open this site on the map Start a 7-day trial
197 MWplanned capacity
Plannedstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • OperatorEdgeConneX
  • City and statePickaway, Ohio
  • Statusplanned
  • Planned capacity197 MW
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked3 from 3 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Ohio has 45 data centers on record in Real Assets, with 2.41 GW reported as operating and 17.8 GW not yet operating. EdgeConneX Ashville Data Center is one of them.

EdgeConneX has 3 data centers in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

3 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

EdgeConneX data centers in other states

Other data centers in Ohio

Full market dataset & site-level records

Open EdgeConneX Ashville Data Center and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see EdgeConneX Ashville Data Center on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates EdgeConneX Ashville Data Center?

EdgeConneX Ashville Data Center is recorded under EdgeConneX. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is EdgeConneX Ashville Data Center?

In Pickaway, Ohio. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does EdgeConneX Ashville Data Center have?

197 MW. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 3 linked pages by ABC 6 On Your Side (WSYX), Data Center Dynamics, EdgeConneX (PowerConneX Ashville Energy Center project page). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.