Bitdeer Clarington HPC & AI Campus is an under construction data center in Clarington / Monroe County, Ohio, listed under Bitdeer Technologies Group. Planned capacity is 570 MW according to SEC EDGAR (company filing). Real Assets links 2 source pages, including baxtel.com, SEC EDGAR (company filing).

Open this site on the map Start a 7-day trial
570 MWplanned capacity
Under constructionstatus
2source pages linked
Not recordedexpected completion

Facts on record

  • OperatorBitdeer Technologies Group
  • City and stateClarington / Monroe County, Ohio
  • Statusunder construction
  • Planned capacity570 MW, as stated by SEC EDGAR (company filing)
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked2 from 2 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Ohio has 45 data centers on record in Real Assets, with 2.41 GW reported as operating and 17.8 GW not yet operating. Bitdeer Clarington HPC & AI Campus is one of them.

Bitdeer Technologies Group has 3 data centers in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

More Bitdeer Technologies Group data centers in Ohio

Other data centers in Ohio

Full market dataset & site-level records

Open Bitdeer Clarington HPC & AI Campus and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Bitdeer Clarington HPC & AI Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Bitdeer Clarington HPC & AI Campus?

Bitdeer Clarington HPC & AI Campus is recorded under Bitdeer Technologies Group. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Bitdeer Clarington HPC & AI Campus?

In Clarington / Monroe County, Ohio. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Bitdeer Clarington HPC & AI Campus have?

570 MW, as stated by SEC EDGAR (company filing). The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 2 linked pages by baxtel.com, SEC EDGAR (company filing). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.