← United States data centers · All sites · Ohio
Sourced site record, every fact links to its page
Ohio AI infrastructure campus:data center in Ohio, Ohio.
Ohio AI infrastructure campus is an operating data center in Ohio, Ohio, listed under Volato. Capacity is 154 MW according to Bisnow. Real Assets links 1 source page, including Bisnow.
Open this site on the map View permit PDFs & MW timelineoperating data center · 1 linked source
- Volato
- Ohio
- Ohio
Approximate metro position & Ohio peer sites (exact coordinates require sign-in)
Facts on record
- OperatorVolato
- City and stateOhio, Ohio
- Statusoperating
- Capacity154 MW, as stated by Bisnow
- Expected completionNot recorded
- Sources linked1 from 1 publisher
- Record updated5 November 2026
- Exact parcel coordinates & street address🔒 View on parcel map
- Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
- Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Ohio has 56 data centers on record in Real Assets, with 1.68 GW reported as operating and 18.23 GW not yet operating. Ohio AI infrastructure campus is one of them.
Volato has 1 data center in the United States with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Soar AI Secures $1B Equity For Industrial-To-Data-Center Development
Bisnow, bisnow.com, published 12 October 2026Web page - Government permit PDFs, regulatory filings & municipal zoning records (Ohio, Ohio)
Air/water permits, substation filings, tax abatements & site plans🔒 Permit PDFs - Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
Audited facility timeline and transaction history for Ohio AI infrastructure campus🔒 MW timeline
1 source on record. Public links open the original pages. How the data is built and what a source line means.
Locked site dossier & primary filings
View the 3 government permit PDFs, source filings & MW timeline for Ohio AI infrastructure campus - enter work email
Unlock the complete facility dossier for Ohio AI infrastructure campus (Ohio, Ohio): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.
Other data centers in Ohio
- PORTS Technology Campus
Piketon, Ohio, planned10 GW - Amazon data centre campus, Trenton
Trenton, Ohio, planned1 GW - Meta Prometheus
New Albany, Ohio, operating1 GW - Cologix Johnstown Campus
Johnstown, Ohio, planned800 MW - Vantage Millersport Campus
Fairfield, Ohio, under construction800 MW - Stargate Lordstown
Lordstown, Ohio, under construction750 MW
Full site dossier & United States dataset
Unlock Ohio AI infrastructure campus permit PDFs, MW timeline & 1,304 other data centers
This page is the public summary for Ohio AI infrastructure campus in Ohio, Ohio. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.
- Exact parcel coordinates, street address and interactive map pin for Ohio AI infrastructure campus
- Phase-by-phase operating vs. planned MW timeline and utility/substation records
- All 3 linked primary sources, government permit PDFs and regulatory filings
- Recorded M&A, lease and financing transactions for Volato in Ohio
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Ohio AI infrastructure campus?
Ohio AI infrastructure campus is recorded under Volato. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Ohio AI infrastructure campus?
In Ohio, Ohio. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Ohio AI infrastructure campus have?
154 MW, as stated by Bisnow. Operating capacity today is not recorded.
Where does this information come from?
From 1 linked page by Bisnow. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.