AnalystAIReal Assets
Start free trial← United States data centers · All sites · Georgia
Sourced site record, every fact links to its page
Fort Gillem (ATL15) is a planned data center in Forest Park, Georgia, listed under Digital Realty. Planned capacity is 212 MW according to Digital Realty. Real Assets links 2 source pages, including Data Center Dynamics, Digital Realty.
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Georgia has 53 data centers on record in Real Assets, with 1.48 GW reported as operating and 15.4 GW not yet operating. Fort Gillem (ATL15) is one of them.
Digital Realty has 83 data centers on record in the United States: 79 operating and 4 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.
2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see Fort Gillem (ATL15) on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Fort Gillem (ATL15) is recorded under Digital Realty. The operator is the name its sources give, which can differ from the owner or the tenant.
In Forest Park, Georgia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
212 MW, as stated by Digital Realty. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
From 2 linked pages by Data Center Dynamics, Digital Realty. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.