AnalystAIReal Assets Start free trial

← United States data centers · All sites · Georgia

Sourced site record, every fact links to its page

Fort Gillem (ATL15):data center in Forest Park, Georgia.

Fort Gillem (ATL15) is a planned data center in Forest Park, Georgia, listed under Digital Realty. Planned capacity is 212 MW according to Digital Realty. Real Assets links 2 source pages, including Data Center Dynamics, Digital Realty.

Open this site on the map Start a 7-day trial
212 MWplanned capacity
Plannedstatus
2source pages linked
Not recordedexpected completion

Facts on record

  • OperatorDigital Realty
  • City and stateForest Park, Georgia
  • Statusplanned
  • Planned capacity212 MW, as stated by Digital Realty
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked2 from 2 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Georgia has 53 data centers on record in Real Assets, with 1.48 GW reported as operating and 15.4 GW not yet operating. Fort Gillem (ATL15) is one of them.

Digital Realty has 83 data centers on record in the United States: 79 operating and 4 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

More Digital Realty data centers in Georgia

Digital Realty data centers in other states

Other data centers in Georgia

Full market dataset & site-level records

Open Fort Gillem (ATL15) and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Fort Gillem (ATL15) on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Fort Gillem (ATL15)?

Fort Gillem (ATL15) is recorded under Digital Realty. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Fort Gillem (ATL15)?

In Forest Park, Georgia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Fort Gillem (ATL15) have?

212 MW, as stated by Digital Realty. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 2 linked pages by Data Center Dynamics, Digital Realty. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.