Project Arrowhead:data center in Ocilla, Georgia.

Project Arrowhead is a planned data center in Ocilla, Georgia, listed under Premier Data Center Development, LLC. Planned capacity is 1.25 GW according to Georgia Department of Community Affairs (DRI). Real Assets links 3 source pages, including Southern Georgia Regional Commission (DRI 4689 report), Data Center Dynamics, Georgia Department of Community Affairs (DRI).

Open this site on the map Start a 7-day trial
1.25 GWplanned capacity
Plannedstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • OperatorPremier Data Center Development, LLC
  • City and stateOcilla, Georgia
  • Statusplanned
  • Planned capacity1.25 GW, as stated by Georgia Department of Community Affairs (DRI)
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked3 from 3 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Georgia has 53 data centers on record in Real Assets, with 1.48 GW reported as operating and 15.4 GW not yet operating. Project Arrowhead is one of them.

Premier Data Center Development, LLC has 1 data center in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

3 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

Other data centers in Georgia

Full market dataset & site-level records

Open Project Arrowhead and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Project Arrowhead on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Project Arrowhead?

Project Arrowhead is recorded under Premier Data Center Development, LLC. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Project Arrowhead?

In Ocilla, Georgia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Project Arrowhead have?

1.25 GW, as stated by Georgia Department of Community Affairs (DRI). The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 3 linked pages by Southern Georgia Regional Commission (DRI 4689 report), Data Center Dynamics, Georgia Department of Community Affairs (DRI). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.