← United States data centers · All sites · Texas · Abilene
Sourced site record, every fact links to its page
Crusoe Abilene AI factory campus, Abilene:data center in Abilene, Texas.
Crusoe Abilene AI factory campus, Abilene is a planned data center in Abilene, Texas, listed under Microsoft. Planned capacity is 900 MW according to Crusoe. Real Assets links 1 source page, including Crusoe.
Open this site on the map View permit PDFs & MW timelineplanned data center · 1 linked source
- Microsoft
- Abilene
- Texas
Approximate metro position & Texas peer sites (exact coordinates require sign-in)
Facts on record
- OperatorMicrosoft
- City and stateAbilene, Texas
- Statusplanned
- Planned capacity900 MW, as stated by Crusoe
- Expected completionNot recorded
- Sources linked1 from 1 publisher
- Record updated11 November 2026
- Exact parcel coordinates & street address🔒 View on parcel map
- Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
- Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Texas has 243 data centers on record in Real Assets, with 4.8 GW reported as operating and 75.94 GW not yet operating. Crusoe Abilene AI factory campus, Abilene is one of them.
Microsoft has 25 data centers on record in the United States: 10 operating and 15 planned or under construction. See Microsoft in Texas (4 sites).
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Crusoe Announces New 900 MW AI Factory Campus in Abilene, Texas to Support Microsoft AI Infrastructure
Crusoe, crusoe.aiWeb page - Government permit PDFs, regulatory filings & municipal zoning records (Abilene, Texas)
Air/water permits, substation filings, tax abatements & site plans🔒 Permit PDFs - Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
Audited facility timeline and transaction history for Crusoe Abilene AI factory campus, Abilene🔒 MW timeline
1 source on record. Public links open the original pages. How the data is built and what a source line means.
Locked site dossier & primary filings
View the 3 government permit PDFs, source filings & MW timeline for Crusoe Abilene AI factory campus, Abilene - enter work email
Unlock the complete facility dossier for Crusoe Abilene AI factory campus, Abilene (Abilene, Texas): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.
More Microsoft data centers in Texas
- Microsoft SAT40
San Antonio, Texas, operating106 MW - Microsoft SAT14
San Antonio, Texas, operating66 MW - Microsoft data center campus - Childress, Texas
Childress, Texas, plannedNot recorded
Microsoft data centers in other states
- Microsoft Fairwater Campus (MKE03)
Mount Pleasant, Wisconsin, operating2.72 GW - Microsoft Mishawaka
Granger, Indiana, planned1 GW - Microsoft West Des Moines Cloud Cluster (Ginger & Osmium)
West Des Moines, Iowa, operating1 GW - Microsoft Fairwater Atlanta AI Mega-Campus
Fayetteville, Georgia, operating859 MW - La Porte Data Center at Radius Industrial Park
LaPorte, Indiana, under construction538 MW - Lyle Creek Data Center "Project Agate"
Conover, North Carolina, under construction448 MW
Other data centers in Texas
- Project Matador
Panhandle, Texas, under construction17 GW - GridFree AI South Dallas One
Dallas, Texas, planned5 GW - Sailfish Comanche Circle
Tolar, Texas, planned5 GW - Prometheus Pecos Project
Pecos, Texas, planned2.5 GW - Amp Energy East Texas
Lufkin, Texas, planned2.1 GW - IREN Sweetwater Mega-Hub (Sweetwater 1 & 2)
Sweetwater, Texas, under construction2 GW
Full site dossier & United States dataset
Unlock Crusoe Abilene AI factory campus, Abilene permit PDFs, MW timeline & 1,304 other data centers
This page is the public summary for Crusoe Abilene AI factory campus, Abilene in Abilene, Texas. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.
- Exact parcel coordinates, street address and interactive map pin for Crusoe Abilene AI factory campus, Abilene
- Phase-by-phase operating vs. planned MW timeline and utility/substation records
- All 3 linked primary sources, government permit PDFs and regulatory filings
- Recorded M&A, lease and financing transactions for Microsoft in Texas
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Crusoe Abilene AI factory campus, Abilene?
Crusoe Abilene AI factory campus, Abilene is recorded under Microsoft. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Crusoe Abilene AI factory campus, Abilene?
In Abilene, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Crusoe Abilene AI factory campus, Abilene have?
900 MW, as stated by Crusoe. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 1 linked page by Crusoe. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.